HomeMy WebLinkAbout2015-07-09 Airport Commission Packet - Work SessionKENAI AIRPORT COMMISSION
July 9, 2015
WORK SESSION — 5:30 P.M.
AGENDA
➢ DRAFT LONG RANGE DEVELOPMENT PLAN
• Review minutes June 11 Meeting
➢ REMAINING AND NEW ITEMS
• Airside
• West side issues
• Land Acquisition
• For Runway Protection Zone (RPZ)
• For Obstruction Control
• For Buffer Area
• Off Airport Obstruction Tree Removal (Project 53.2)
o Dependent on easement enforcement or land
acquisition
• Airport Sand Storage Building (Project 11)
• Combination Blower —Broom Equipment
• Float Plane Basin Overflow weir (Project 10)
• Security Camera System
• Terminal Building
• In Build (inside remodeling)
• Out Build (building expansion)
• Cargo, Mail and General Aviation
• Include one 600 foot lease lot with apron and willow Street extension?
• Lease Lot Development by City
• Airport Access and Parking project phases
• Access and Parking Project combined (25% FAA Eligible)
• Access Project alone (93.75% FAA Eligible)
• Parking Project alone (10% to 15% FAA Eligible)
Page 1
➢ DEVELOPMENT COST TABLE
• FAA Entitlement Funds
• FAA NPR for Discretionary Funds
• Other Funding
➢ FINANCIAL CAPABILITIES
• FAA Entitlements:
• State Match:
• City Match:
• City Revenue over Expenses
➢ PRIORITIES
• Year 1 -5
• Year 6 -30
• Year 11 -20
$1,100,000 - $1,300,000 million /yr.
$ 36,700 - $43,300/ yr.
$36,700- $43,300/ yr.
$200,000 - $ 250,000 /yr.
➢ PUBLIC COMMENTS— 3 Minutes per person
Page 2
KENAI MUNICIPAL AIRPORT
Commission Meeting— AIRPORT MASTER PLAN Draft Long Range Development Plan
June 11, 2015
AIRPORT COMMISSION
James Bielefeld
Larry Porter
Kimberly Dodge
Pat Porter (Council Liaison sitting in),
James Zirul
Paul Minelga
Glenda Feeken
PUBLIC
Donald Moffis, Public
CONSULTANTS
Casey Madden, Wince - Corthell -Bryson
TECHNICAL ADVISORY COMMITTEE
Mary Bondurant
Rick Koch
Casey Madden reviewed the May 14 Workshop minutes and presented the Long Range Development
Plan as was selected at the May 14 meeting as well as the mini lease lots added at the Float Plane Basin
and the clarification of the land parcels on the west side as to RPZ, Obstruction and Buffer designations.
Casey provided an up dated cost schedule for the projects selected for the 20 year planning period and
advised that FAA had not commented yet on their level of participation in Terminal and Terminal Area
projects
Casey pointed out a few items that he did not feel had consensus such as the west side property issues
and the Terminal Improvements and asked for any questions and or comments.
Some discussion on the location and area reserved for a future deicing pad as to its size, need, and need
• Not required at this time.
• Water quality has been satisfactory and is the only trigger at this time that could require
a controlled deicing pad.
• Size 200x 300
• Location direct between Terminal Gates and 1 L for typical winter departures
Public Comments
Mr. Koch cautioned commission on the financial aspects of selecting and or adding projects
Don Moffis questioned the commission on the release of the lots along the Kenai Spur for purchase by
the leasee's. Some discussion followed on a process through which he could work with the
Administration to that end.
Casey recommended one more TAC /Commission Workshop to finalize the Long Range Plan and
prioritize improvements so the Financial Analysis and Phased Airport Improvement Plan could begin.
Commission agreed to a workshop at the July 9 meeting.
1983
j 1966 TERMINAL _
EMPLOYEE ADS DITION
RESTROOM
I
AR B
161
WI RRNM
EXPANDED
>
166
EXPAND RESTAURANT
PASSENGER_
400 SF -I
153
VISUAL
CONVERT —
RESTROOM TO
OFFICE
I
_ a
KRCHEN
15T
su &LCB9r
14e
om
RESTORE SHEAR
WALLS
WIRELESS KIOSKS
SUS-WARIIQ L
E® ]
1
BAGGAGE CIAM p
I �3
I
I
� o
I
I
I
I
L�
0113
HOT AIR
CURTAINS
OVER DOORS
HOT 1zT 1z3 _— E —I OVEF CURTAINS f
D D -m oAMTIC p OVER DOORS TYP. GH Ao-
-- ARCTIC ARCTIC
SMOKING SHELTER ?/ cO
�\ 131
HEATED SIDEWALK
/ e
ISOLATED AIRPORT
ADMINISTRATION AREA
p
I
—1 \ jjr
._ ._. - - -_.. _. - L _ — - -�_ r. _'+_c-r2- >Z�.'�.cs� -s� - -�� - .r••.... .. ._- �t�:ar +R>5�'- L�a�tta� s
C �
BU
BUS
RENTAL CAR QUEUE AREA WALKWAY OR TAXI j.
SIDEWALK SHELTER II
II
1
II
I
it
I
l
I I I
E%ISfING
33Xxr
G4RAGE
x
X —X
POLE BARN STYLE
COVERED PARKING
20'X 20' BAYS ONLY
TWO BAYS SHOWN
x — yc \ \`
— x _ x —��
TERMINAL ADDITION \
RELOCATED SECURITY FENCE
N REF
1 w HALF SRE
AR B
3S
EXPANDED
>
U�
(g
PASSENGER_
_
_
QHOLDROOM
1
3
CAPACITY 9D
II
1
115
II
Ii
6
�m
Z n
2�
VISUAL
PAGERJ
/
z
RAVN j
11T
i
I RAVN
I 116
I
VACANT
11a
GMN]'
13
GRAN]
IADMBI
Q1
g
1x6
�I
m
I
II
I
2
II
TfCK
C R5
C
R3 R2
C Ri
m
--------r------------------------
VISUAL
OVERHEAD
PAGER
SECURITY
CURTAINS
1966 TERMINAL
1 1963 ADDITION _
I L m�
O
_- - - - -_—
-
- - -�—
I
rENANTC
134
TENANT3
133
TENMIT2
.4
TENANTI
1 1
I WIRELESS KIOSKS'
I �J_
SMOKING SHELTER ?/ cO
�\ 131
HEATED SIDEWALK
/ e
ISOLATED AIRPORT
ADMINISTRATION AREA
p
I
—1 \ jjr
._ ._. - - -_.. _. - L _ — - -�_ r. _'+_c-r2- >Z�.'�.cs� -s� - -�� - .r••.... .. ._- �t�:ar +R>5�'- L�a�tta� s
C �
BU
BUS
RENTAL CAR QUEUE AREA WALKWAY OR TAXI j.
SIDEWALK SHELTER II
II
1
II
I
it
I
l
I I I
E%ISfING
33Xxr
G4RAGE
x
X —X
POLE BARN STYLE
COVERED PARKING
20'X 20' BAYS ONLY
TWO BAYS SHOWN
x — yc \ \`
— x _ x —��
TERMINAL ADDITION \
RELOCATED SECURITY FENCE
N REF
1 w HALF SRE
PROJECT
84
PROJECT
COST OF EACH
PROJECT
MASTER PLAN
PROJECT COSTS
SOURCE FOR FAA- FUNDED PROJECTS
OTHER FUNDING
SOURCES
FAA ACIP CODE
(P)= PURPOSE
FAA ACIP CODE
(A)= AIRPORT CODE
[FAAACIPCODE
)= COMPONENT
FAA ACIP CODE
(T) =TYPE
FAA ACIP NPR for
Discretionary Funds
FAA @ 93.75%
STATE @ 3.125 %
CITY @ 3.125%
�D
13
AIRFIELD PAINT I CRACK SEAL
250,000/YR
5,000,000.00
4,687,500.00
156,250.87
156,250.00
10.00
4.00
9.00
5.00
82.50
10
FLOAT PLANE SABI N OVERFLOW WEIR
210,000.00
210,000.00
196,875.00
6,562.50
6,562.50
8.00
4.00
90D
10.00
72.40
11
T /W's PG,H AND APRON REHAB a rd LIGHTING
2,000,000.00
2,000,000.00
1,875,000.00
62,500.00
62,500.00
8.00
4.00
e.W
8.00
65.60
17
SAN D STORAG E BUILDI NG
750,000.00
750,000.00
703,125.00
23,437.50
23,437.50
6.00
4.00
3.00
5.00
32.10
5311
OBSTRUCTION TREE MAINTENANCE ON Al RPORT
50,000.00
50,000.00
46,575.00
1,562.50
1,562.50
10.00
4.00
7.00
10.00
92.50
12
T/ WA- T/ WKTOT /WCREHAB,SAFETYAREAS &UGHTING
3,100,000.00
1 3,100,000.00
2,906,250.0
96,875.00
96,875.00
8.00
400
8.00
8.00
65.60
SEE BLOWER /BROOM COMBO
850,000.00
850,000,00
796,875.00
26,562.50
26,562.50
6.00
4.00
8.00
9.00
46.80
14
LAND FOR RPZand OBSTRUCTION CONTROL
846,000.00
846,000.00
793,125.00
26,437.50
26,437.50
6.00
4.00
7.00
8.00
43.50
49
MIDFIELD EXIT TAXIWAY
825,000.00
825,000.00
773,437.50
25,781.25
25,781.25
4.00
400
8100
10.00
29.60
FLOAT PLANE BASIN "PHASE ONE
2,600,000.00
2,600,000.00
2,437,500.00
81,25000
81,250.00
4.00
4.00
am
10.00
29.60
53.2
OBSTRUCTION TREE REMOVAL OFF AIRPORT
100,000.00
100,000,00
93,750.00
3,125.00
3,125.00
52
PERIMETER SECURITY FENCING AND GATES
500,000.00
S00,000.0
468,750,00
15,625.013
15,625.00
10.00
4.00
7.00
6.00
80.50
8
WIDEN WATER R/W
1,500,00000
1,500,000.00
1,406,250.00
46,875.00
46,875.00
6.00
4.00
10.00
800
48.00
15
LAND FOR OBSTRUCTJONOONTROL
89,600.00
89,600.00
84,000,00
2,80,0
2,800.00
6.00
4.00
7.00
8.00
43.50
16
LAND FOR BUFFER ALONG FLOAT PLANE ROAD
96,700.00
59,300.00
55,593.75
1,853.13
1,853.13
6.00
4.00
7.00
$,Do
BRAD
SUBTOTAL
18,479,900.00
17,324,906.25
248,750.00
577,496.88
T .RMINAL B IILDINO
SECURITY CAMERA SYSTEM
200,000.00
200,000.00
187,500.00
6,250.00
6,250.00
10.00
4.00
7.00
6.00
60.50
19
RE -ROOF TERMINAL AREA BUILDINGS
400,000.00
400,000.00
375,000.00
12,500.00
12,500.00
70D
4.87
1.00
8.00
42.70
20
SPRINKLER SYSTEM REHABILITATION
300,000.00
1W,000.00
93,750.00
3,125.00
3,125.00
7.00
4.00
1.00
8.00
42.70
22
WIRELESSKIOSKS
15,OLIO.OD
35,00.00
14,062.50
468.75
468.75
7.87
4.87
1.00
8.0
42.70
23
VISUAL INFORMATION SYSTEM
60,00.00
60,00D.0
56,250.0
1,675.00
1,875.00
TOD
4.0
1.00
B.0
4210
25
WARM AND COLD SECURE STORAGE
15,000.00
15,000.00
14,062.511
468.75
468.75
TOD
4.00
1.0
S.0
42.70
26
PET RELEASE AREA
5,66.0D
5,000.00
4,687,50
156.25
156.25
7.0
4,87
1.00
8.00
42.70
27
MECH/ELECT ROOM EXPANSION AND REHAB
111,00.00
111,000.00
104,062.50
3,468.75
3,468.75
7.00
4.00
1.0
8.00
42.70
29
NEW OVERHEAD DOORS WITH HOT AIR CURTAINS
87,000.00
87,000.00
81,562.50
2,718.75
2,718.75
7.00
4.00
1.00
8.00
42.70
30
TERMINAL BUILDING ENERGY UPGRADES
10,000.00
160,000.00
1501000.00
5,00.0
5,00.0
7.00
4.00
1.00
8.00
42.70
31
TAXI AND SMOKER SHELTERS
20,00 e.0
40,000.0
37,500.0
1,250.00
1,250.00
7100
4.06
1.00
BXD
42.70
TERMINAL REHAB ,CONCEPT PLANNING and DESIGN
150,01100
150,000.00
140,625.00
4,07.50
4,687.50
Goo
4.87
1.00
8.87
34.50
21
ISOLATE ADMINISTRATION AREA
17,000.00
17,000.0
17,00.0
24
ATTACHED GARAGE /STORAGE WITH DEMO OF EXISTING
114,500.00
114,500.00
114,500,W
28
EXPAND RESTAURANT 400 sq. h.
18,000.00
18,000.00
18,000.00
32
AIRLI N ES EQUI PME NT SH ELTER
65,000.00
65,000.00
65,000.00
SUBTOTAL
1,557,500.00
1,259,062.50
41,968.75
41,968.75
214,500.00
CARGO, MAIL ANOGFNFRAI AVIATION
38 TERMINAL UTILITIES- GRANITE PT. TO WILLOW ST. 228,000.00
228,000.00
213,750.00
7,125.03
7,125.00
7.00
400
1.00
80
42.70
50
FLOAT PLANE BASIN MINI LEASE LOTS SURVEY
700087
10,00.00
10,000.87
41
AIRCRAFT WASH PAD
45,000.00
45,000.00
42,187.50
1,40.25
11406.25
4.00
4.06
7.87
5.00
22.6D
51
FLOAT PLANE BASIN OP's a nd PILOT FACILITY
140,00.00
140,000.00
131,250.00
4,375.0
4,375.00
39
TA%ILANE EXTENSION
350,000.00
350,000.00
328,125.00
10,937.50
10,937,50
7.00
400
S.W
6.00
50.75
35
APRON TJW EXTENSION FOR LEASE LOTS
1,650 per foot
35.1
CONCEPT ONE 600' APRON EXTENSION
990,000.00
36
WILLOW STREET EXTENSION ROADIUTILITIES
780 per foot
36.1
CONCEPT ONE 600' STREET EXTENSION
468,000.00
37
LEASE LOT DEVELOPMENT TO SUBBASE
170,000/AC
37.1
15ACRES
DO 00
850,087.00
850,000.00
SUBTOTAL
I
1,623,000,00
715,312.50
23,843.75
23,843.75
860,000.00
AIRPORT A CE CANDPARRING
44 PARKINGEXPANSION 25 %a /- FAA GRANT ELIGIBLE 450,000.00
P4.00
450,0000
112,500.0
3,51563
3,515.53
333,984.00
TOT _
4.00
7.00
45.85
43
ACCESS AND PARKING REHAB 25 % + /- FAAGRANTELJGIBLE
1,100,000.00
1,100,000.00
275,OW.00
8,593.75
8,593.75
816,406.00
3.cc
4,87
7.00
55.20
SUB TOTALI
1,550,000.00
387,500,00
12,109.38
12,109.38
1,150,390.00
IOTA . PROIF T O T
23,210,400.00
19,686,781.25
326,671.88
655,418.75
2,224,890.00
AyA]j[ABLE.EUNnINV Assurning EntJtI t<_jjJLHJIT n
22,000,000.00
733,333.00
733,333.00
TO BEDETERMINED
Rolled Over Entitlements to Date
3,500,000.00
116,667.00
116,667.00
NOTE: The addition of the FAA Airport Capital Improvement Plan (ACIP) National Priority Rating (NPR) number is not intended to suggest a priority of projects for the Airport's long range development plan.
FAA and Airport Sponsors utilize this system for prioritizing and programming the use of FAA Discretionary grant funds to supplement FAA Entitlement grant funds to meet the goals and objectives of the Planning Process.
The Cost Table is color coded, into the four - five year phases of the planning period, reflecting the Various priorities for the Airport that have been discussed over the past couple years.
This initial breakdown of the projects is not intended to be considered as a recommendation but is provided as a starting point for the stakeholders to discuss and consider in the selection of the final phased improvement plan
AIRPORT CAPITAL IMPROVEMENT PHASES
I YEAR ONE TO FIVE
II YEAR SIX TO TEN
III YEAR ELEVEN TO FIFTEEN
IV YEAR SIXTEEN TO TWENTY
TOTAL
TOTAL PROJECT COST
5 6,372,500.00
5 8.306.000.00
$ 4,848,900.00
$ 3,683,000.00
5 23,210,400.00
FAA ENTITLEMENTS
$ 1.1011 .,1110 OD
$ 5.500,000.00
$ 5,500,000.0
$ 5,500,000.00
$ 25,500,00.00
Adds 3.5 M Rolled Over
STATE SHARE CITY SHARE OTHER SOURCES
5 300,000.00
$ 183,300.00
$ 183,300.00
$ 183,300.00
$ 849,900.00
300,000.00 $ 475,484.00
183,300.00 $ 816,406.00
183,300.00 0.00
$ 183,300.00 $ 933,000.00
$ 849,900.00 $ 2,224,890.00 5
FAA- NPR 65+ for
DISCRETIONARY
TOTAL FUNDING
1.860,000.00
5 11,935,484,00
4,400,000.00
$ 11,083,006.00
1,750,0000
$ 7,616,600.00
0.00
$ 6,799,600.00
8,0101000.0
$ 37,434,690.00
TABLE 9 -1 LONG RANGE DEVELOPMENT CONCEPT ESTIMATED COSTS
DRAFT