HomeMy WebLinkAboutResolution No. 2015-66Suggested by: Administration u«;q� CITY OF KENAI K , IILASU RESOLUTION NO. 2015 -66 A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA, AWARDING AN AGREEMENT FOR CONSTRUCTION OF BEAVER CREEK WELL FIELD IMPROVEMENTS, WELLS 2C AND 2E 2015 -2016 WHEREAS, the following bid was received on November 24, 2015; Bidder Base Bid Alternate 1 Alternate 2 Total Base Bid Connect Well Drill Well 2E Connect Well + Alternates 1 2C 2E & 2 Engineer's $230,000 $150,000 $75,000 $455,000 Estimate Peninsula $387,625 $214,815 $159,000 $761,440 Construction and, WHEREAS, Peninsula Construction Inc. is the only responsive bid; and, WHEREAS, award to Peninsula Construction, Inc. would be in the best interest of the City; and, WHEREAS, the recommendation from City Administration is to award the agreement to Peninsula Construction, Inc. for the total approximate cost of $761,440; and, WHEREAS, sufficient monies are appropriated. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, that the agreement for the project entitled "BEAVER CREEK WELL FIELD IMPROVEMENTS, WELLS 2C AND 2E 2015 - 2016" be awarded to Peninsula Construction, Inc. for the total approximate cost of $761,440. PASSED BY THE COUNCIL OF THE CITY ALA this 2nd day of DECEMBER, 2015. F,�ENA/ �!Y O x PAT PORTER, MAYOR Finance: M \the cety of 210 Fidalgo Avenue, Kenai, Alaska 99611 -7794 Telephone: (907) 283 -7535, Ext. 236 / FAX: (907) 283 -3014 " "Village with a Past, G * with a Future ° MEMORANDUM P\TO: Rick Koch, City Manager FROM: Sean Wedemeyer, Public Works Director S/u�✓ DATE: November 24, 2015 SUBJECT: Award of an agreement for the construction of Beaver Creek Well Field Improvements, Wells 2C and 2E 2015 -2016 Rick, This memo is in support of a resolution awarding an agreement for the construction of the Beaver Creek Well Field Improvements, Wells 2C and 2E 2015 -2016. The following bid was opened on November 24, 2015. Bidder Base Bid Alternate 1 Alternate 2 Total Base Bid + Connect Well 2C Drill Well 2E Connect Well 2E Alternates 1 & 2 Engineer's $230,000 $150,000 $75,000 $455,000 Estimate Peninsula $387,625 $214,815 $159,000 $761,440 Construction The scope of work is as follows. Base Bid — Furnish and install approximately 120 LF of 8" and 3" diameter ductile iron pipe, vertical turbine, submersible well pump, pitless adapter, electrical equipment, and other appurtenant equipment to connect "Well 2C" into the City of Kenai water system. Additive Alternate 1 — Drill and test one 12 -inch diameter, approximately 240 foot deep water well ( "Well 2E "). Additive Alternate 2— Remove well pump, drop pipe, level transducer and other equipment from defunct "Well 26" and install in newly drilled "Well 2E ". Furnish and install approximately 25 LF of 6" diameter ductile iron pipe, pitless adapter, and other appurtenant equipment. I have discussed the bid results with the granting agencies that are funding this project. They have no concerns with a single bidder, or that it exceeds the engineer's estimate. I have approval to award from both of them. The grant funding 70% of this work expires on and therefore the construction must be complete by March 315'. The engineer's estimate did not adequately account for this requirement. By awarding this work we will ensure that we do not forfeit any of the funds awarded by the granting agency. Thank you for your attention to this matter