HomeMy WebLinkAboutORDINANCE 1035-1985i
i
Suggested by: Beautification Committee
CITY OF KENAI
ORDINANCE NO. 1035-85
AN ORDINANCE OF THE COUNCIL OF THE CITY OF KENAI, ALASKA,
INCREASING ESTIMATED REVENUES AND APPROPRIATIONS IN THE 1984-85
GENERAL FUND BUDGET FOR A LANDSCAPING MASTER PLAN FOR DOWNTOWN
KENAI.
WHEREAS, the Beautification Committee has recommended to the City
l Council that the City hire a planner to design a landscaping
master plan for the downtown area.
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF
KENAI, ALASKA, that estimated revenues and appropriations be
increased as follows:
General Fund
Incfeaae3 E*Limated Revenues:
Apropriations of Fund Balance $9,080
Increase Appropriations:
Land -Professional Services $9,080
PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, this 17th day
' of April, 1985.
i M WAG NER, M R
r ATTEST:
et Whelan, City Clerk
First Reading: April 17, 1985
Second Reeding: April 17, 1985
Effective Date: April 17, 1985
Approved by Finance: C,
r
f
t
PARKS, RECREATION AND
VISITOR, INDUSTRY EXPERIENCE
kasprisin design group
ARCH=-,,T'JCt-E•UE.B,'Ul PLANDUTG-CO'.D.IT=r DESIGN
2.510 r^air te�-r Avenue Ease Sea.tle. :7a. 98102
Z08.328.09G0
� of
}L
F�'.
wr
I
Tom Wagoner
Mayor., Ci:; of KaIsi
210 - Pidalgo
Kenai, AK. 99611
kasprisin design group
20 March, 1985 ARA PLAIRTWOOOMMUlaW DEMM
arcchfte= wild urbw p%11 ws
.� 2510 fair
irVtO ewe. a Seattle, Wa. 98=
Dear Mayor Wagoners
Attached please find a latter proposal for the DOWNTOWN LANDSCAPE MASTER PLAN
.�� for tha City of Keisi.
We are presently preparing a development plan for the Old Townsite in Renal and
are becoming familiar with the city, particularly the downtown area.
Chm qualifications for this type of project include downtown design aid re-
vitalization plans. and landscape designs for such cosssmities as Bataan, Junasu
=� (Auks Say), Satchikan, and Wasilla. Alaska. In 1982. we vets awarded FIRST
PL= in the Missoula. Montana Downtown Riverfrout Corridur Design Compe-
tition, dealing with open space design; in 1984, as received a Merit Award
from the American Planning Association for our hhsises Downtown Design and
Waterfront Park (now constructed); &ad is 1981. we received the Outstanding
Achievement Award for the Port Townsend, Washington Downtown Master Plan.
I as including a phased proposal for your review, based on an understanding
of your budget constraints.
We certainly appreciate the opportunity to submit this proposal and can 1
N
e consider th an important project.
, APA
cc; Sally Bailie. City council
Marina Nelson
.
I
A PROPOSAL F'OTt THE KENAI DOWNTOWN LANDSCAPE MASTER PLAN
%!
Pralect Oblective:
1) an illustrated site plan Wwwing
To develop a master plan for the downtown area
of Rana%. Alaska which will depict landscape
landscape elements;
1
design for the commercial center;
2) a recommended phasing.plan;
To llluscrav, the landscape design and schematic
details in Swo and three dimensions,
3) two and three dimensional sketches :
depicting design character, stela,
'
appropriate
for city approvals and preliminary cost
and materials;
estimation;
4) a preliminary cost estimate by phase
To Indicate construction phasing and mesas to fund
which will be useful as a planningtool;
and accomplish iach phase;
,
S) recommendations on various
Aneroach and Products:
ways to achieve
the Master Plan; �•
The RDG team bps developed a unique and highly
Illustrative esthod of desist, client approval,
6) a Master plan document, printed and
bound, outlining the rerommandacions.
and projeet presentation. Dared on the fact
that we arm presently conducting the develop-
Costs:
Sent plan for the Original townsite plan and
i
researching conditions within the downtown
in order to reduce the city's costs, the
area. we have become familiar with the needs
in downtown for beautification in aft and
Kasprisin Design Group will integrate the
site surveys in with the original lovnsite Study. II
existing developments, as well as along city
in addition. KDG has in-house printing capa-
r
right-of-way. We understand the pride of
bilities which can result in savings for the
_
Kenai residents to their community and the
final production of the document (or manual).
f
desire to reflect that pride in the dovntuwa;
i
We will design the final product to be simple.
as well as the friendly but earnest desire to
straight forward and highly graphic with only
i
`
compete with Soldotna for the growing visitor
dollar. ascessitating a need to visually
supporring text captions and cost estimates.
jFr
I
improve the Kenai commercial area and old
We have attached eyamples no similar downtown
Lowe•
landscape products for your review. KDG will
g�
We will talk with the !Ltyor. interested city
meet or exceed these products for Kenai.
'
council and city planning commission members
and property owners to determine the type of
design character desired for the city.
Based on these interviews and the design
-
'
experience of KDG with other similar projects,
we will prepare landscape schematics for city
`
review. Following this review we will finalize
the master plan complete with the following
products.
E
OPTIONS/ COSTS
Task/Product One: Hourly Rates of. Personnel
Illustratrtd. Site Plea Ran Kasprisin ...................... S60/hour
(Design and Graphics) ............. $1.700.00 Azehitect.urhan Planner
Tuk/Pcoriuct Two:Paul Hedrick ..................... 545/hour
FscoPhasing Plan .............. 400.00 Urban Des goer
TI.x/Product.Thzee:. .. .. ............ Colin Baden S25/hour
i �setch� 960.00 Technician
Task/Product Your:
Preliminary Cost Estimate By Phase..... 480.00
Task/Product Five:
Implementation Reeosendations......... 480.00 '
Task/Product Six:
Motor Plan Document
0 25 bound copies .................. 300.00
fo layout. typing ................... 960.00
Total Cost $5,280.00
The" costs are based on "piggy -backing"
- —_. the review periods on to Ron Kasprisin's
Townsite trips. Any additional trips
i Will be billed at 5i23 per trip for travel
costs and $480 per day for Ron's ties.
Option 2
f .-
„ order to provide the City of Kenai with a
$ sore detailed description of landscape materials
including where they can be purchased. installation
_- techniques and standards, their maintenance
and upkeep, and personnel scenarios to reduce
costs, the following section is added to Option 1:
add:
T-
Expand Task/Products Three. Pour and Five
c' to include a Preliminary Specifications
t breakdown of materisi availability,
purchase options/location, installation
i techniques. maintenance and upkeep.
' and personed options. these items
;+- will increase the costs by $3,800.00
The total cost of options 1 and 2, assuming
no extra trips, will be S9,080.00
F
I