& RESOLUTION OF THE COUNCIl, OF THE CITY OF KEN&I, ALASKA, &#ARD3:NG,..~~. -'."
THE PROJECT ENTZTLED THOMPSON PARK 1994 WATER DXSTRXBU~ZON..'"AND
SEWAGE COLLECTION FOR A NOT-TO-EXCEED A~OUNT OF $176,680,00.,'.... · ."'""
WHEREAS, a proposal dated April 7, 1994, was received for the above
referenced project, and ....
WHEREAS, the City of Kenai has received an ADEC and a state'.~.
Administrative qrant to help fund this project, and
WHerEAS, a Local Improvement District, LID, is also helping to fund
th~s project, and
WHEREAS, the reco~endation of the Public Works Department is to
award this inspect~on contract to Mike Tauriainen, P.E., and
WHEREAS, the Council of the City of Kena~ has determined that award.
to this f~rm would be in the best interest of the City, and' ..' :....,..
~ow, TH~o~, s~ XT ~SOZ~V~ aY ~ co~cz~ o~ ~ cz~ o~:x~',,:.:·, '."'.
~~, ~at the City of Xenai award a contract ~o Mike Ta~ta~nen.,.:. '
P.E., for engineering inspeot~on for ~e pro~eot end,tied'
Park 1994 gater D~str~but~on ~d Sewaqe Collec~ion for a
exce~ a~o~t of $~76,680.00. .
PASSF/) BY THE COUNCIL OF THE CITY OF KENAI, ALASKA ~,h~th daY:Of
ATTEST. .
C~OI, L. FREAS~ CITY CLEI~
Approved by Finance:
Written by Public
.April 27, 1994
CONSULTING ENGINEERS INC.
Jack LaShot, P.E.
City of Kenai
210 Fidalgo
Suite 200
Kenai, AK 99611
Subject:
Thompson Park 1994 Improvements
Proposal for Inspection and Contract Administration
Mr. LaShot:
Based on our discussion, we will probably need more than one inspector on site
during constr.uction..We propose to have one inspector onsite full time and"
another half time equivalent. For proposal purposes we have assumed the'..'
contractor will work six, ten-hour days for the 1994 contract period of 126' dayS.:'
We assumed that the contractor will work five, eight-hour days for the 1. 995
contract period of about 25 days. We will only have one inspector on .s~t· in'1995,
The actual time could be significantly less, depending on the Contractor s .schedule.
and progress.
Att.ached is our proposal for inspection and contract administration for the subject
project. We propose to do the work for a total not to exceed fee of $176,680.
Whitford Surveying will perform the complete construction surveying. Mr. Whitford
will perform a minimum of grade staking, stake proposed municipal utilities;
measure and calculate usable quantities, stake radii, and hub top of Type III and
Type I.
Our affiliate, Northern Test Lab will perform all of the soils quality control. When
possible, our onsite inspector will perform the quality control testing to reduce the
testing costs and provide immediate testing as needed.
Mr. Henry Knackstedt will perform the start-up full time contract administration fOr'
the project. We have inter.v, iewed some ver. y qualified indi.viduals to perform' part.
time inspection. The part-time inspector wmll become full tmme after the project start
up phase and Mr. Knackstedt will then perform part-time inspection. Mr.
Knackstedt will continue as the Project Engineer and will be on site daily and handle
pay estimates. Mike Tauriainen, P.E. will be the Principal Engineer In Charge and
will be responsible for overall project supervision.
CAD Proposal ' ' '-' '~ . '? ' · ....... ' .:.-.ConsUlting Engineers,.
April 1994 " '. ~
· " S ldotna,~Ala"k ·
OUr inspector wiiI* have a Cellular phone:f°r fUll. timOC°mmUntCatiOn withOur offioe ' ,..
and.the. City as:needed. Dai!YrePorts' Will be.submitted to the CiIY~. we.- Will .
d00ument' existing conditions :with': Video.. and Still:ShOti~of the entire,. Project.prior:'to" '
'constructiOn;,.. . . A vtdeo, tapeand.. .,. .selected.. . ProjeCt. Phot°s Will be prOvided':to, the City .'.
at-the' end 'of. the .project,- . ,.. ,': ..... "i.' .:... ' '"' .... ..... '
Ad~litiOnal:'firm 'information: l's' included i'n our origlnal ThomP,On:.Park de~ign. ..,
PropOsal.. PleaSe let'uS knoW. if' yoU'require "resUmeS' orany.addltional-informatiOn. ....
·Sinoerely, '.
Mike TaUriainen, P.E~
Principal Engineer
.... THOMPSON PARK
SEWER AND WATER DISTRIBUTION SYSTEM IMPROVEMENTS
1994 CONTRACT ADMINISTRATION/INSPECTION
... . .:,.......;:~:
........ : .................... . ,. .'...':~:~:!'
INSPECTION PE 21 . Hour 95_ $1.~95
(Assumes 126 Days of Inspection) EiiI 630 Hour 60 3?,800,
EIV 840 Hour 50 42,000.
Overtime.. EIV 420 Hour 62.5 26,260
CONSTRUCTION SURVEY
2.Man~crew .... , , ............ 3.,44 ..... Hour 123.75 42.570.
Office ........., . ,20 Hour ,71.5,. 1.430,
TESTING/QUALITY CONTROL
pro,ct, or, ....... , ......... 8,, Eacl~ 240 1,9,20
Gm.c!a,t!ons 30 Each ' .1, 800
Nuclear, Density , 120 Each , .30._ 3,60O
Trips ..... , ...... 35 Each ... 25. ....... 8..7.5.
EXPENSES
Veh.,i.cle, ............... 189 Day 20, 3.780
Phc.ge 7 Month 75 5;25.
... MIs¢=. Sup. p..!ie$... .... ,,3_00
photos 300 .65 195
. -. ..... .......... , ... .... ....... ...... : .... ,,,,,!,,. -,,. ,._.,, ., , ;,' .....;.' . ..; . . . ' . .........,::......:: :_ .
1998 CONTRACT ADMINISTRATION/INSPECTION
~ ,,~ I I II I I II I I ' '1 ,,L , . II1' ~,1 .... ' .,.._UII. JJ.L_J'.
- . : i! . : .... :
INSPECTION PE 8 Hour 95 $760
(Assumes 25 Partial Days of Inspection) .............
Elll 25 Hour 60 1.500
EIV 100 Hour 50 5,000
VEHICLE 40 Day 20 800
CLOSE OUT, RECORD DRAVVINGS PE 4 Hour 95 380
Eli! 20 Hour 60 1,200
DI 40 Hour 50 2,000
1998"
...... , L~,,,,~', ' ' ' Y',i",;, ';[' ~i ............. , , .... I II
PERSONNEL FEE": SCHEDULE
: Pmfes!ionll 8IwlI~II"::..: ':.:-
Prtrl~iPal. Engbleer::'''.
Eng!nW.'.i',
7star..
ee/hr,
5~/hr.
45/1~r.
5e/hr,
47/hr.
40/tu'.
32/hr.
3emr.
Engineerll
Engineer Itl
Engineer tV :
Sctenttllt I
sctentm ,
Techrl!ctan, t
Technician tl
Teclinlcian III.
Technician tV
Draftsman I.
Dralttm~ln II ': ".
Se~/..lt.. .-
Travel in company vehicte~ at' $,40/mlle
Field vehicle 'dally rate 136fday plus $.25/mtle
Company Airart (Cetsrm 172) $50/hr.
Job tncurmd ~ will be billed at 1.1 times the llclualexpe~l~.al"ld Include but are not
limited to: ...
Unless previous armn~mente have been made, all ~atament amount, am due and payable wtthln 30
Intem~t at the rate'
days. Outstanding accOuntS'after 30 daya from the date of odglnal billing v/dl.~ ~argt~l
of I 1/2% per month an~ ~dl .be retroaceve to the date.of the'origlnal,bllltng~ '.
MATERIALS LAB FEE SCHEDULE
TEST
Soll Testing
Sieve Analysis, CA (+~4)
Sieve Analysis, FA (-f~4)
Sieve Analysis, Combined
Moisture Content
Classification of Soils
Percent Fractured Particles(+f/4) Alaska T4
Specific Gravity CA
Specific Gravity FA
Hydrometer Analysis
Moisture-Density Relations of
Soils (Proctor)
Density of Soil in Place(Nuclear)
Balloon Density
Providence Density
Atterberg Limits(Liquid&Plastic)
Liquid Limit Only
Concrete Testing
Field Control Tests
(Slump, Air, Cast 3 Cylinders)
Cast Extra Cylinder
Extra Slump Test
Extra Air Content
Unit Weight
Co.mpressive Strength and/or Cure ASTM C39
Swiss Hammer
Codng
Asphalt Testing
Extraction and Gradation
Coring and Density
REFERENCE
AsTM C136
ASTM Cl17
ASTM C566
ASTM D2487
ASTM C127
ASTM C128
^STM C422
ASTM D1557
ASTM D2922
ASTM D2167
ASTM D424
ASTM D423
UNIT PRICE
40.00
50.00
60,00
12.00
12.00
30.00
50.00
70.00
140.00
240.00
30.00
50.00,
55~00
65,00
ASTM C31
ASTM C31
ASTM C143
ASTM C231
ASTM C 138
ASTM C42
60.00
15.00
15,00
18.00
20.00
18.00
On Reque~
On Reque~
ASTM D2172
150.00
On Request
Th~ Park
Clly of Kenai
A~. 1994
SEE REVERSE FOR CONDITION8
The following conditions apply to our unit prices.
1. Unit prices include all labor and materials required for testing and reporting
results.
Tests performed before 7:30 a.m., after 5:30 p.m., or anytime on Saturday8,
Sundays, or Holidays, at the client's request, will be considered overtime teats
and will be billed at 1.25 times the normal rates.
A charge of $25.00/trip within 15 miles of our laboratory will be assessed each
time a technician visits a site to perform field tests or pick up samples. This
charge includes travel time for the technician and all mileage charges.
Trips more than 15 miles from the laboratory will be charged mileage and
travel time according to our Personnel Fee Schedule. The test will be charged
at its usual rate.
Minimum charge per field tdp is $45.00.
Standby time in excess of 15 minutes between tests will be charged according
to our Personnel Fee Schedule.
$7.00/test will be added to cover fixed costs of field tests performed on time.
and expense instead of unit price basis,
Unit Prices are listed for the most common of the many tests Northern Test
Lab can perform. Tests not listed as unit pdce items are done on a time and
expense basis-personnel time is charged on an hourly basis and out of pocket
expenses are billed at cost plus 10 percent.