A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA AWARDING
A CONTRACT TO GBO~NGIN~BR~, INa,, FOR ENVIRONMENTALSERVICES ON THE'-'
'LOT L3 ~NDLOT ~4~ aX~SXTB~BB~S~NT, L994 PROJECT FOR A NOT-.
TO-EXCEED AMOUNT OF $27,580.00.
WHEREAS, the following cost for performing the
services on this project were submitted in their
September 27, 1994=
professional
proposal on
GeoEngineers,
Enviros, Inc.
Inc.
Environmental Services
$29,300.00
$34,246.10
WHEREAS, the award includes completing a
Assessment, and
Phase I and Phase II Site
WHEREAS, after review with each firm
unnecessary items in their proposal, the
performed services were as follows:
regarding missing or
corrected cost for the
GeoEngineers,
Enviros, Inc.
WHEREAS, the
interest of
GeoEngineers,
Inc.
Environmental Service~
$27,580.00
$34,246.10
Public Works Department believes it is
the City of Kenai to award this
Inc., and
in the best
project to
WHEREAS, sufficient funds are appropriated, and
WHEREAS, the Kenai City Council has determined that it is in the.
best interest of the City of Kenai to award this contract to
GeoEngineers, Inc., and
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF KENAI,
ALASKA, that a contract be awarded to GeoEnqineers, Inc. for
professional environmental services for the project entitled "Lot
13 and Lot 14, CIIAP Site Assessment, 1994," for a not-to-exceed
amount of $27,580.00.
PASSED BY THE COUNCIL OF THE CITY OF K~]~AI, ALAS~ ~h/s~3r.d day of
November, 1994. '
ATTEST:
Approved by Finance:
Written by Public Works.-~~~
10/94/kw
Tot
sub:Ject:
October 12, 1994
Mayor Williams and Xenai City Council
Kim Howard, Acting City Manager
Keith Kornelis, Public Works Diector
Jack LaShot, city
Rachel Clark, Engineering Te~hnician'..~fL
Lot 13 and 14, Cook ~nlet 2ndustrial Air Park
Site Assessment, 1994
On $~ptember 27, 1994, ~wo bids were received for the a
~loged project. Envlros, Inc.,s Dronos.l ~.- .~- ..~o~.
~a? for a geophysical magnetometer and eli---~--~--~}ch $8,880'..
ae=ect buried drums. The s Y
u~vey was not rec~ired by the RFP..
Bo~h proposals were missin~ or unclear o. a few items, and
additional informa~ion and corrections were made. The
The final proposal price for Geoengineers is:
Original Price. $ 29,880
Geo. Survey - 8,880
Changes
· $ 27,580
While ~he geophysical survey was not required in the RFP, Phase
information may indicate that =his type of survey could re I
invaluable information. It .... .~ _. ..... P vide.
~u~u a~so ne~? ~o persuade a
potential buyer tha~ all sources of contamination have b
removed from the property, een
The Public Works Department would like to recommend that the
contract for this project be aWarded to ~eoBnqineers I
the prLce of $27,580, wzth the u-~---*--~-- -~ .... ' no. foz
costing $8,800 may be ~ust~4~ ?i-~'9~t"~ ~nac =ne survey
.... - ~ *~u~ ~fl ~ne future. We recommend that.
cna orulnance 1606-94 remain a~ $39,500, in the event thc
~eoph~sical survey becomes necessary. ~ a
GEO
ENGXNEERS
November 16, 1994
Publi~ Works Dopmnm
210 Fidaiso Avonne Suim 200
Kraal, Alnla 99611
This lower confirms our telephon~ converfation on November I$. 1994 between the City of
Kmti, Glacier F, nvironmmal and GeoF. nginm~. (bo~ submi~ a proposal to the City
for an Snviromnmitnl Site Invest~ of Lots 13 and 14, Cook Industrial Air Park, Kemt,
Alaska, on Sepumber 26, 1994. Several issues resatdin~ the proposed project schedule md..-~~:
were discumd dnrins our t~t~hono conversation. We undmmd tim Olador Havimmnemal/,
my not be mmplmly demob~ at ~b~ time field activities to conduct the site asseosnHmt:are.
We do not anticipate any impact to the Phse 1 Historical Research portion to our original scope
of work. However. the Phase 2 ~ Survey will be slightly affected dependinf, on the
coordination of schedules with Olaf. let nnvironmmal Setyicu. The ieoph~sical survey cm~ bO
condm:ted over tho pond aru, provided it is frozen at tho time of our sur~. Metallic eq~
is · physical barrier and the seopb~olcal response will be masked immMlmly adjacem m this
eq~. We undmund iht Olacter lhvtronmonml Services will be on site m move tho'.
equi~ durin~ the survey to mid,ate this problem. We have proposed excavation of ,six
backhoe test pin as part of the Phs~ 3 site invmtis~on~ Test pits complc~i in tl~ tmmnut.
area will breach ,ho ti.~r reqmrins repair o! the liner prior to bac~edlins. Glacier will bo
responsible for rtpain ~o die liner, Xast~on of four monitor~nS wells at~ also propoaM as part
of Phse 3 of the assessme~. Phcemm~ of tho wells will bo deter~iu~ followin~ r~viow of
Phase I Historical Research. It my be appr~riato to phce weil8 in tho treatment are~
possibly the pond at~L A beam2ni~ surface seal will bo placed throush the liner. Olacior will
10:16
~07 561 5133
GEO F./%TGZNEI~$
City of Kenal
November 16, 1994
Pase 2
use prudent care m insure eut the wells are no~ damqed durins soil treaun~ or duties
equipmentdmob'dization. Glacier my elec~ ~o confirm or r~pair tho liner around the wells prior.
m resumin~ ueatme~ on the site. Installation of monitorin~ wells in the pond area may bc
appropriate. Depe~ on the schMulo of the sssessment and removal of die pond, it may bO
necessary to remobilize tho drill tls to the site. We undmtand that the City is ukins that
Glacier pay f~r the direc~ costs anochtnt with remobilJntlon. We anticipate approx~ly S~00
in f~ for remob'diz~o~ if
We do not anticipm any incruse in costs for conducting the assessment beyond ~ corn
assoc~ed v;tdi remoblli~fion, if neceosaU. Furdm3noro, we~io not anticipaze additional corn
should ~bo City elect to conduc~ Phno I Hismflcal Ruearch sepamely from the remainder of. di0
projecL We aro prepared to ~Ol~le~e tho nsessme~ widiin 90 days of your ~ atl~o~on
m proceed. We look forward m workinf ~ you on this projec~ md if you have arty addifloMl
questions, please mil.
very truly,
$cou B. Wiriness, P.B,
No. J'PJ04MXI*AI8
cc: Mr. Stero lvflles
Olacior Bnvironmeml Services