HomeMy WebLinkAboutResolution No. 2021-28KENAI CITY OF KENAI RESOLUTION NO. 2021 - 28 Sponsored by: Administration A RESOLUTION OF THE CITY OF KENAI, ALASKA, ADOPTING THE CITY'S CAPITAL IMPROVEMENT PLAN FOR FISCAL YEARS 2022-2026. WHEREAS, the City Council held a Special Work Session on April 24, 2021 where the draft budget and Capital Improvement Plan were reviewed and discussed; and, WHEREAS, the Capital Improvement Plan included with this Resolution is inclusive of the comments and minor revision requests received to date; and, WHEREAS, Administration is in support of and recommends adoption of the Plan; and, WHEREAS, adoption of this Plan is in the best interest of the City; and, WHEREAS, the Capital Improvement Plan is intended to be a living document that will be adjusted periodically to meet the ongoing needs of the City. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA: Section 1. That the Kenai City Council adopts the Capital Improvement Plan FY2022-2026 Section 2. That this Resolution takes effect immediately upon adoption. ADOPTED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, this 5th day of May, 2021. KENAI _enai 1210 Fidal. Ave. Kenai. AK 99611-7794 1907 283 7535 1 www.Lenai.city MEMORANDUM TO: Mayor Brian Gabriel and Kenai City Council THROUGH: Paul Ostrander, City Manager FROM: Scott Curtin, Public Works Director DATE: April 29, 2021 SUBJECT: Resolution 2021-28 The purpose of this memo is to request Council's support of Resolution 2021-28 in the adoption of the FY2022-2026 Capital Improvement Plan. The Plan is a collective effort with input received from City staff and the community. Projects were provided by Department Heads starting last fall, brought forth for discussion at the City's various commission meetings in February and March as well as a Council Special Session Meeting on April 24, 2021. The document before you today is the result of those efforts. I would like to thank everyone that participated in the development of this document as well as Council for the opportunity to present the projects at the Budget Work Session meeting. Council's support is respectfully requested. FISCAL YEAR 2022 - 2026 JCJ The City of Kenai I www.kenaixity CAPITAL IMPROVEMENT PLAN FISCAL YEAR 2022 - 2026 CITY OF KENAI CITY HALL 210 FIDALGO AVENUE KENAI, AK 99611 PAUL OSTRANDER CITY MANAGER POSTRANDER@KENAI.CITY 907.283.8222 SCOTT CURTIN PUBLIC WORKS DIRECTOR SCURTIN@KENAI.CITY 907.283.8236 CITY OF KENAI TABLE OF CONTENTS Page 3 INTRODUCTION Page 4 AIRPORT FUND Page 11 GENERAL FUND Page 27 WATER & SEWER FUND Page 35 SENIOR CITIZENS FUND Page 38 CONGREGATE HOUSING FUND Page 41 PERSONAL USE FISHERY FUND INTRODUCTION The City of Kenai's five year Capital Improvement Plan (CIP) is developed by the Public Works Department in coordination with City departments, Administration, Boards and Commissions, and the City Council for the purpose of long-range capital improvement planning and budgeting. A capital improvement project is typically a one-time expenditure, usually, in excess of $35,000, that has a useful life exceeding one year or is a major project such as a comprehensive or master plan. Capital projects on existing assets are included in the CIP, provided they meet the definition of a capital project. Projects can focus on immediate needs or anticipate future needs before critical failures and are developed based on an internal process which determines funding availability and infrastructure needs. The CIP is divided into six parts based on the City Fund in which the project would be accounted for. These include the Airport Fund, General Fund, Water & Sewer Fund, and Senior Citizens Fund, Congregate Housing Enterprise Fund, and Personal Use Fishery Fund. Projects are not necessarily listed in priority order for each Fund by fiscal year. Active projects that have been funded in prior years are not included in the Plan. Projects that are identified in the CIP are included for planning purposes and to recognize a need. Not all projects receive the necessary funding to accomplish them in a projected year, which is why the list is updated annually. Many projects are dependent on non-City funding sources, which the City can expect to seek, but are not guaranteed. The availability of outside funds can vary with local, state and federal economies, and the City's needs can, and do, change frequently. 3 | INTRODUCTION AIRPORT FUND 4 | AIRPORT FUND CITY OF KENAI CAPITAL IMPROVEMENT PLAN FY2022 - 2026 FY2022  (Continued on next page) Project Name Project No. Total Project Cost City Funding Grant Funding Description Aireld Marking, Cracksealing, and Sealcoat 1 $500,000 $500,000 $0 Aireld Painting, Cracksealing, & Sealcoat to Current Standards Operations Facility Boiler Replacement 2 $185,000 $185,000 $0 Replace Boiler at the Airport Operations Facility FY2023  Project Name Project No. Total Project Cost City Funding Grant Funding Description Runway Rehabilitation Project Design 3 $1,500,000 $93,750 $1,406,250 Design Project to Rehabilitate Runway 2L/20R and Taxiways A,C,K,L to Current Standards FY2024  Project Name Project No. Total Project Cost City Funding Grant Funding Description Runway Rehabilitation Project Construction 4 $17,000,000 $1,062,500 $15,937,500 Project to Rehabilitate Runway 2L/20R to Current Standards Terminal Elevator Major Maintenance 5 $50,000 $50,000 $0 Major Maintenance on Existing Elevator at the Airport Terminal ARFT Elevator Major Maintenance 6 $50,000 $50,000 $0 Major Maintenance on Existing Alaska Regional Fire Training Facility Elevator Total Total Total $685,000 $685,000 $0 $1,500,000 $93,750 $1,406,250 $17,100,000 $1,162,500 $15,937,500 TOTAL AIRPORT PROJECTS:   $27,885,000 GRANT FUNDING: $24,290,625 CITY FUNDING: $3,594,375 AIRPORT FUND 5 | AIRPORT FUND CITY OF KENAI CAPITAL IMPROVEMENT PLAN FY2022 - 2026 FY2025  Consolidate existing controls system Project Name Project No. Total Project Cost City Funding Grant Funding Description Rehabilitate Taxiways A,C, K & L 7 $3,500,000 $218,750 $3,281,250 Design and Construct Project to Rehabilitate Taxiways A,C,K,L to Current Standards Aireld Fireghting Vehicle Replacement 8 $1,000,000 $62,500 $937,500 Replace Aireld Fireghting Vehicle FY2026  Project Name Project No. Total Project Cost City Funding Grant Funding Description Apron and Willow Street Extension 9 $2,350,000 $146,875 $2,203,125 Extend Apron Taxiway for Lease Lots and Road and Utilities on Willow Street Terminal Road and Parking Lot Improvements 10 $1,750,000 $1,225,000 $525,000 Rehabilitate Access Road, Parking Lot Expansion, and Lighting at the Terminal Total Total $4,500,000 $281,250 $4,218,750 $4,100,000 $1,371,875 $2,728,125 AIRPORT FUND PROJECTS 6 | AIRPORT FUND YEAR: 2022 2023 2024 2025 2026 COST: $500,000 AIRFIELD MARKING, CRACKSEALING AND SEALCOAT 01 Department:  Airport Total Project Cost: $500,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Airport Fund Potential Grant Identified: None Operating Budget Impact: Minimal/No Impact Details: This project consists of a project for airfield marking, cracksealing and sealcoat to meet the Code of Federal Regulations (CFR) 139 inspections and a pavement maintenance program, a grant assurance for a federally obligated airport to protect the life of the asphalt. OPERATIONS FACILITY BOILER REPLACEMENT 02 Department:  Airport Total Project Cost: $185,000 Project Phased: No Project Type: Building Improvement Funding Source(s): Airport Fund Potential Grant Identified: None Operating Budget Impact: Slight Decrease YEAR: 2022 2023 2024 2025 2026 COST: $185,000 Details: This project would replace a boiler at the Airport Operations Facility. The boilers were installed in 2002, when the Facility was constructed, and one boiler has a crack in it which is temporarily sealed, and three snow melt systems are not working and need to be replaced.   AIRPORT FUND PROJECTS 7 | AIRPORT FUND YEAR: 2022 2023 2024 2025 2026 COST: $17,000,000 RUNWAY REHABILITATION PROJECT CONSTRUCTION 04 Department:  Airport Total Project Cost: $17,000,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Grant Dependent Potential Grant Identified: Federal Aviation Administration Operating Budget Impact: Slight Decrease Details: This project will rehabilitate Runway 2L/20R to current standards. The project will reduce crack sealing maintenance costs and bring the oldest pavement on the Airport up to the recommended Pavement Condition Index. RUNWAY REHABILITATION PROJECT DESIGN 03 Department:  Airport Total Project Cost: $1,500,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Grant Dependent Potential Grant Identified: Federal Aviation Administration Operating Budget Impact: Slight Decrease YEAR: 2022 2023 2024 2025 2026 COST: $1,500,000 Details: This project will design project to rehabilitate Runway 2L/20R and taxiways A, C, K, and L to current standards. The project will reduce crack sealing maintenance costs and bring the oldest pavement on the Airport up to the recommended Pavement Condition Index. AIRPORT FUND PROJECTS YEAR: 2022 2023 2024 2025 2026 COST: $50,000 TERMINAL ELEVATOR MAJOR MAINTENANCE 05 Department:  Airport Total Project Cost: $50,000 Project Phased: No Project Type: Building Improvement Funding Source(s): Airport Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact ARFT ELEVATOR MAJOR MAINTENANCE 06 Details: Provide major maintenance on the existing Airport Terminal Elevator. This maintenance will replace 30-plus-year-old components for safety reasons while providing minor cosmetic improvements. 8 | AIRPORT FUND Department:  Airport Total Project Cost: $50,000 Project Phased: No Project Type: Building Improvement Funding Source(s): Airport Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact YEAR: 2022 2023 2024 2025 2026 COST: $50,000 Details: Provide major maintenance on the existing Alaska Regional Fire Training Facility's elevator. The facility is currently primarily occupied by Beacon. The facility was constructed in 1997, and while the elevator sees relatively minimal use, this project will provide for the continued safe operation of the unit. AIRPORT FUND PROJECTS 9 | AIRPORT FUND AIRFIELD FIREFIGHTING VEHICLE REPLACEMENT 08 Department:  Airport Total Project Cost: $1,000,000 Project Phased: No Project Type: Equipment Funding Source(s): Grant Dependent Potential Grant Identified: Federal Aviation Administration Operating Budget Impact: Minimal or No Impact YEAR: 2022 2023 2024 2025 2026 COST: $1,000,000 Details: This project will replace old equipment. REHABILITATE TAXIWAYS A,C,K, & L 07 Department:  Airport Total Project Cost: $3,500,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Grant Dependent Potential Grant Identified: Federal Aviation Administration Operating Budget Impact: Slight Decrease YEAR: 2022 2023 2024 2025 2026 COST: $3,500,000 Details: This project will rehabilitate Runway taxiways A, C, K, and L to current standards. The project will reduce crack sealing maintenance costs and bring the oldest pavement on the Airport up to the recommended Pavement Condition Index. AIRPORT FUND PROJECTS 10 | AIRPORT FUND TERMINAL ROAD AND PARKING LOT IMPROVEMENTS 10 Department:  Airport Total Project Cost: $1,750,000 Project Phased: No Project Type: Infrastructure Funding Source(s): Grant Dependent Potential Grant Identified: Federal Aviation Administration Operating Budget Impact: Slight Increase YEAR: 2022 2023 2024 2025 2026 COST: $1,750,000 Details: This project rehabilitates the access road, provides for parking lot expansion to the south, and installs new lighting poles at the Kenai Municipal Airport Terminal parking lot. YEAR: 2022 2023 2024 2025 2026 COST: $2,350,000 APRON AND WILLOW STREET EXTENSION 09 Department:  Airport Total Project Cost: $2,350,000 Project Phased: No Project Type: Land Improvement/ Infrastructure Funding Source(s): Grant Dependent Potential Grant Identified: Federal Aviation Administration Operating Budget Impact: Slight Increase Details: This project would extend the apron taxiway 600 feet for lease lots and Willow Street Extension (road and utilities) as well as provide for lease lot development (five acres). Lease lot development is assumed to be 100% City-funded. City General Fund portion of the project is reflected in the General Fund section.   GENERAL FUND 11 | GENERAL FUND CITY OF KENAI CAPITAL IMPROVEMENT PLAN FY2022 - 2026 FY2022  Project Name Project No. Total Cost City Funding Grant Funding Description Phase II Dispatch Radio Replacement 1 $175,000 $175,000 $0 Complete replacement of outdated dispatch radio system Animal Shelter Epoxy Floor Coating 2 $40,000 $40,000 $0 Repair peeling kennel ooring at the Animal Shelter Fire Department Flooring Replacement 3 $50,000 $50,000 $0 Replace carpeting at Fire Station 1 with suitable ooring Bridge Access Pedestrian Trail 4 $3,266,000 $290,947* $2,975,053 Construct 10-foot wide, 1.3 mile paved and separated pathway Phase II Kenai Cemetery Expansion 5 $260,000 $260,000 $0 Construct improvements including fencing and columbarium pad Rec Center RTU HVAC Replacements 6 $280,000 $280,000 $0 Replace HVAC unit, air handlers, control valves, and thermostats Rec Center Roof Replacement 7 $756,000 $756,000 $0 Replace existing built-up roof with new membrane roof system Total $4,827,000 $1,851,947 $2,975,053 FY2023  Project Name Project No. Total Cost City Funding Grant Funding Description Kenai Blu Stabilization *Multi-year Project 8 $17,500,000 $3,547,143 $13,952,857 Stabilize a one-mile area on the northern bank of the Kenai River Phase II Willow Street Rehabilitation 9 $420,000 $420,000 $0 Milling & resurfacing of roadway from Kenai Spur to Airport Way Multifactor Authentication 10 $50,000 $50,000 $0 Purchase and install software and hardware Fire Department Apparatus Bay Painting 11 $40,000 $40,000 $0 Strip and paint apparatus bays at Fire Department Kenai Nordic Trail Lighting 12 $200,000 $0 $200,000 Design and construct lighted Nordic trail at the golf course Municipal Park Trail Boardwalk 13 $85,000 $85,000 $0 Construct elevated boardwalk adjacent to ballelds Outdoor Event Park Design and Feasibility 14 $35,000 $35,000 $0 Provide engineered drawings to construct an event park Facility Improvements To be Identied 15 $500,000 $500,000 $0 Provide improvements for City facilities identied in Assessment Total $18,830,000 $4,677,143 $14,152,857 *$78,387 is new appropriation; $212,560 appropriated in prior year GENERAL FUND 12 | GENERAL FUND CITY OF KENAI CAPITAL IMPROVEMENT PLAN FY2022 - 2026 FY2024  Project Name Project No. Total Cost City Funding Grant Funding Description Kenai Blu Stabilization *Multi-year Project 8 $17,500,000 $6,125,000 $11,375,000 Stabilize a one-mile area on the northern bank of the Kenai River Facility Improvements To be Identied 16 $500,000 $500,000 $0 Provide improvements for City facilities identied in Assessment Lilac Street Repairs 17 $393,000 $393,000 $0 Replace failed concrete curb and provide new asphalt surface City Hall Elevator Major Maintenance 18 $50,000 $50,000 $0 Replace 30-plus year-old components in elevator Softball Green Strip Play Equipment Replacement 19 $85,000 $85,000 $0 Replace children playground equipment Future Road Repairs 20 $250,000 $250,000 $0 Major repairs to correct settlement and failing asphalt areas Future StormWater Improvements 21 $80,000 $80,000 $0 Maintenance repairs to storm water conveyance system Total $18,858,000 $7,483,000 $11,375,000 FY2025  Project Name Project No. Total Cost City Funding Grant Funding Description Future Road Repairs 20 $450,000 $450,000 $0 Major repairs to correct settlement and failing asphalt areas Future StormWater Improvements 21 $80,000 $80,000 $0 Maintenance repairs to storm water conveyance system Kenai Multi-Purpose Facility Perm. Locker Rms 22 $1,250,000 $0 $1,250,000 Construction of 5,000 square-foot locker room Flight Services RTU Replacements 23 $350,000 $350,000 $0 Replace roof-top unit at the Flight Service Station Total $2,130,000 $880,000 $1,250,000 GENERAL FUND 13 | GENERAL FUND CITY OF KENAI CAPITAL IMPROVEMENT PLAN FY2022 - 2026 FY2026  Project Name Project No. Total Cost City Funding Grant Funding Description Willow Street Extension 24 $1,000,000 $1,000,000 $0 General Fund share of Apron and Willow Street Extension project Future Road Repairs 20 $450,000 $450,000 $0 Major repairs to correct settlement and failing asphalt areas Future StormWater Improvements 21 $80,000 $80,000 $0 Maintenance repairs to storm water conveyance system Public Safety Facility Improvements 25 $750,000 $0 $750,000 Address abestos abatement concerns and improve facility TOTAL GENERAL FUND PROJECTS:   $46,925,000 GRANT FUNDING: $29,002,910 CITY FUNDING: $17,922,090 Total $2,280,000 $1,530,000 $750,000 GENERAL FUND PROJECTS ANIMAL SHELTER EPOXY FLOOR COATING 02 14 | GENERAL FUND Department:  Police Total Project Cost: $40,000 Project Phased: No Project Type: Building Improvement Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: No Impact YEAR: 2022 2023 2024 2025 2026 COST: $40,000 Details: This project repairs peeling kennel flooring at the Kenai Animal Shelter. The epoxy is peeling and causing small craters in the flooring underneath. The flooring is now rough to the touch instead of smooth as it used to be.. PHASE II DISPATCH RADIO REPLACEMENT 01 Department:  Police Total Project Cost: $175,000 Project Phased: No Project Type: Equipment Funding Source(s): General Fund Potential Grant Identified: State Capital Project Submission | Department of Homeland Security Operating Budget Impact: Slight Increase YEAR: 2022 2023 2024 2025 2026 COST: $175,000 Details: This project completes a critical replacement of outdated dispatch radio system. Grants have been applied for multiple years for this replacement. GENERAL FUND PROJECTS YEAR: 2022 2023 2024 2025 2026 COST: $290,947 BRIDGE ACCESS PEDESTRIAN TRAIL 04 Department:  Parks & Recreation Total Project Cost: $3,266,00 Project Phased: No Project Type: Infrastructure Funding Source(s): Grant Dependent ($2,975,053)/General Fund ($290,947) Grant Identified: Department of Transportation Operating Budget Impact: Slight Increase FIRE DEPARTMENT FLOORING REPLACEMENT 03 Details: This project constructs a 10-foot-wide 1.3 mile paved and separated pathway along the east side of Bridge Access Road from its intersection with Beaver Loop Road to its intersection with the Kenai Spur Highway. The final finished surface consists of a 2-inch layer of asphalt. 15 | GENERAL FUND Department: Fire Department Total Project Cost: $50,000 Project Phased: No Project Type: Building Improvement Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact YEAR: 2022 2023 2024 2025 2026 COST: $50,000 Details: This project will replace old carpeting and tile that can no longer be cleaned or maintained in the living/administrative area of Fire Station 1 with a flooring suitable for a fire station. GENERAL FUND PROJECTS YEAR: 2022 2023 2024 2025 2026 COST: $260,000 PHASE II KENAI CEMETERY EXPANSION 05 Department: Parks & Recreation Total Project Cost: $260,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): General fund Potential Grant Identified: None Operating Budget Impact: Slight Increase Details: This project will provide for improvements including fencing and columbarium pad, front entry sign and an underground sprinkler system. Phase II includes a pavilion, flag poles, columbarium, and sprinkler system. Phase III (beyond FY26) includes additional plots, storage building, and a columbarium, if needed. 16 | GENERAL FUND KENAI RECREATION CENTER RTU HVAC REPLACEMENTS 06 Department: Public Works Total Project Cost: $280,000 Project Phased: No Project Type: Building Improvement Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact YEAR: 2022 2023 2024 2025 2026 COST: $280,000 Details: This project will replace the oldest equipment first, including air handlers, control valves, and thermostats. The Kenai Recreation Center was constructed in 1980 with an addition added in 1982. Many of the mechanical systems are now 40 years old and require extensive maintenance to maintain operation. GENERAL FUND PROJECTS YEAR: 2022 2023 2024 2025 2026 COST: $756,000 RECREATION CENTER ROOF REPLACEMENT 07 Department: Public Works Total Project Cost: $756,000 Project Phased: No Project Type: Building Improvement Funding Source(s): General fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact Details: This project will replace the roof at the Kenai Recreation Center. In 2019, all penetrations were hot mopped, and an additional cap sheet was added to a small problem area that persisted with routine leaks. These recent repairs were to buy some time to put a larger full replacement project together. The existing 21,020 square foot roof is built-up asphalt and is roughly 40 years old, well beyond its useful life. 17 | GENERAL FUND YEAR: 2022 2023 2024 2025 2026 COST: $17,500,000 $17,500,000 BLUFF STABILIZATION 08 Department:  Administration | Public Works Total Project Cost: $36,000,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Grant Dependent | Bonding Potential Grant Identified: State Capital Project Submission and Federal Grants To Be Identified Operating Budget Impact: Slight Decrease Details: The City of Kenai in coordination with the Army Corp of Engineers Bluff Erosion Control Project is intended to stabilize an area on the northern bank of the Kenai River from near the river's mouth below Historic Old Town extending upriver approximately one mile toward the first cannery just below Bluff Overlook Park at the end of Spur View Drive. GENERAL FUND PROJECTS 18 | GENERAL FUND YEAR: 2022 2023 2024 2025 2026 COST: $420,000 PHASE II WILLOW STREET REHABILITATION 09 Department: Public Works Total Project Cost: $420,000 Project Phased: No Project Type: Infrastructure Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: Slight Decrease Details: This project includes milling and repaving of asphalt roadway approximately 40 feet in width and 1,950 feet in length between the Kenai Spur Highway and Airport Way. MULTI-FACTOR AUTHENTICATION 10 Department: Finance - Information Technology Total Project Cost: $50,000 Project Phased: Yes Project Type: Technology Funding Source(s): General Fund Potential Grant Identified: Department of Homeland Security Operating Budget Impact: Slight Increase YEAR: 2022 2023 2024 2025 2026 COST: $50,000 Details: This project purchases software and hardware to implement Multi-factor Authentication (MFA) and includes hiring a consultant to implement the solution. Current Criminal Justice Information Systems (CJIS) requirements from the FBI require MFA when accessing secure information outside of the Police Department. GENERAL FUND PROJECTS YEAR: 2022 2023 2024 2025 2026 COST: $200,000 KENAI NORDIC TRAIL LIGHTING - DESIGN & CONSTRUCTION 12 Department: Parks & Recreation Total Project Cost: $200,000 Project Phased: No Project Type: Infrastructure Funding Source(s): Grant Dependent Potential Grant Identified: Land Water Conservation Fund Operating Budget Impact: Slight Increase Details: This project includes the design and construction of a lighted Nordic trail system at the Kenai Municipal Golf Course. The design will dictate future phases and feasibility, but it is anticipated that the first phase of trail lighting would focus on the driving range and central bowl area near the clubhouse. 19 | GENERAL FUND YEAR: 2022 2023 2024 2025 2026 COST: $40,000 FIRE DEPARTMENT APPARATUS BAY PAINTING 11 Department: Fire Department Total Project Cost: $40,000 Project Phased: No Project Type: Building Improvement Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact Details: This project strips the remaining finish from the floor in the Fire Department apparatus bays and repaints it with a durable paint designed for fire department apparatus. The Apparatus bays of the Fire Department have not been refinished since the building was built in the early 1970's. GENERAL FUND PROJECTS MUNICIPAL PARK TRAIL BOARDWALK 13 20 | GENERAL FUND Department: Parks & Recreation Total Project Cost: $85,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): General Fund Potential Grant Identified: Land Water Conservation Fund Operating Budget Impact: Slight Increase YEAR: 2022 2023 2024 2025 2026 COST: $85,000 Details: This project constructs an engineered elevated boardwalk. The first phase of this project constructed a new trail extending from the existing Kenai Little League ball fields, meandering within the wooded area at the top of the ravine, and turns east toward the parking lot. This project would construct a 150-foot boardwalk to the Shqui Tsatnu Creek drainage to connect with the existing trail, connecting the east and west sides of Municipal Park. Future phases of the project require an easement on the east side of the creek. OUTDOOR EVENT PARK DESIGN AND FEASIBILITY 14 Department: Parks & Recreation Total Project Cost: $35,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: Slight Increase YEAR: 2022 2023 2024 2025 2026 COST: $35,000 Details: This project will provide engineered drawings to construct an event park to include a stage, restrooms, parking lot, and utilities. The phased project would construct an elevated stage with future phases of the project to include construction of a permanent restroom with utilities, spectator area, event area, vendor area, and parking lot. GENERAL FUND PROJECTS FACILITY IMPROVEMENTS TO BE IDENTIFIED 15 21 | GENERAL FUND Department: Public Works Total Project Cost: $500,000 Project Phased: Yes Project Type: Building Improvements Funding Source(s): General Fund Potential Grant Identified: Operating Budget Impact: Slight Decrease YEAR: 2022 2023 2024 2025 2026 COST: $500,000 Details: This project provides facility improvements to be identified and based on a facility assessment for City buildings that looks at each part of a building's infrastructure and reports system conditions, code deficiencies and functional effectiveness. FACILITY IMPROVEMENTS TO BE IDENTIFIED 16 Department: Public Works Total Project Cost: $500,000 Project Phased: Yes Project Type: Building Improvements Funding Source(s): General Fund Potential Grant Identified: Operating Budget Impact: Slight Decrease YEAR: 2022 2023 2024 2025 2026 COST: $500,000 Details: This project provides facility improvements to be identified and based on a facility assessment for City buildings that looks at each part of a building's infrastructure and reports system conditions, code deficiencies and functional effectiveness. GENERAL FUND PROJECTS YEAR: 2022 2023 2024 2025 2026 COST: $393,000 LILAC STREET REPAIRS 17 Department: Public Works Total Project Cost: $393,000 Project Phased: No Project Type: Infrastructure Funding Source(s): General fund Potential Grant Identified: None Operating Budget Impact: Slight Decrease CITY HALL ELEVATOR MAINTENANCE 18 Details: This project replaces the failed concrete curb in affected areas, re-stabilizes settled subbase areas, and provides a new asphalt surface course along approximately 1600 linear feet of 30-foot wide roadway. Lilac Lane is located off the Spur Highway and Cook Inlet View Drive on the north side of Kenai. The roadway and concrete curb and gutter are suffering from severe settlement in multiple areas. 22 | GENERAL FUND Department: Public Works Total Project Cost: $50,000 Project Phased: No Project Type: Building Improvement Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact YEAR: 2022 2023 2024 2025 2026 COST: $50,000 Details: This project provides major maintenance on the existing City Hall Elevator. This will replace 30+ year old components for safety purposes while providing minor cosmetic improvements. GENERAL FUND PROJECTS SOFTBALL GREEN STRIP PLAY EQUIPMENT REPLACEMENT 19 23 | GENERAL FUND Department: Parks & Recreation Total Project Cost: $85,000 Project Phased: No Project Type: Equipment Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact YEAR: 2022 2023 2024 2025 2026 COST: $85,000 Details: This project replaces an aging and obsolete children's playground located at one of the most heavily used outdoor locations. This area is near the adult softball fields and adjacent to a large green strip with a shelter and restrooms. FUTURE ROAD REPAIRS 20 Department: Public Works Total Project Cost: $750,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact YEAR: 2022 2023 2024 2025 2026 COST: $250,000 $450,000 $450,000 Details: This project will allow Public Works to continue to address roadway surface problem areas as they arise throughout the City. GENERAL FUND PROJECTS YEAR: 2022 2023 2024 2025 2026 COST: $80,000 $80,000 $80,000 FUTURE STORM WATER IMPROVEMENTS 21 Department: Public Works Total Project Cost: $240,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): General fund Potential Grant Identified: None Operating Budget Impact: Information Needed Details: This project will allow Public Works to continue to address storm water runoff, culvert, and catch basin issues as they continue to deteriorate throughout the City. 24 | GENERAL FUND YEAR: 2022 2023 2024 2025 2026 COST: $1,250,000 KENAI MULTI-PURPOSE FACILITY PERMANENT LOCKER ROOMS 22 Department: Parks & Recreation Total Project Cost: $1,250,000 Project Phased: No Project Type: Building Improvement Funding Source(s): Grant Dependent Potential Grant Identified: State of Alaska Operating Budget Impact: Slight Decrease Details: This project constructs six locker rooms at the Kenai Multi-purpose Facility. This would include utilities, bathrooms, shower rooms, and related appurtenances. Approx. 5,000 SF. The Facility was designed to an ultimate "build-out" which included locker rooms, enhanced seating, building insulation, and heating systems, etc. Without locker rooms which include showers and other appurtenances, use of the Facility is limited. GENERAL FUND PROJECTS YEAR: 2022 2023 2024 2025 2026 COST: $350,000 FLIGHT SERVICES RTU REPLACEMENT 23 Department: Public Works Total Project Cost: $350,000 Project Phased: No Project Type: Building Improvement Funding Source(s): General Fund Potential Grant Identified: Operating Budget Impact: Minimal or No Impact WILLOW STREET EXTENSION 24 Details: This project will replace the HVAC roof-top units that have reached the end of their useful life at the Flight Service Station. 25 | GENERAL FUND Department(s): Public Works Total Project Cost: $1,000,000 Project Phased: No Project Type: Infrastructure Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: Slight Increase YEAR: 2022 2023 2024 2025 2026 COST: $1,000,000 Details: This project would extend Willow Street (road and utilities) as well as provide for lease lot development of Airport Lands. Airport Fund portion of the project is reflected in the Airport Fund section.   GENERAL FUND PROJECTS PUBLIC SAFETY FACILITY IMPROVEMENT 25 26 | GENERAL FUND Department(s): Public Works | Police | Fire Total Project Cost: $750,000 Project Phased: No Project Type: Building Improvement Funding Source(s): Grant Dependent Potential Grant Identified: State of Alaska Operating Budget Impact: Minimal or No Impact YEAR: 2022 2023 2024 2025 2026 COST: $750,000 Details: This project will begin to address the concerns with abatement of asbestos within the Public Safety Facility while providing improvements to the Facility floorplan to make the best use of space. WATER & SEWER FUND 27 | WATER & SEWER FUND CITY OF KENAI CAPITAL IMPROVEMENT PLAN FY2022 - 2026 FY2022  Project Name Project No. Total Cost City Funding Grant Funding Description WWTP Chlorine Contact Basin Repairs 1 $80,000 $80,000 $0 Replace corroded gates and appurtenances within the cholorine contact chamber Lift Station Renovations To Be Identied 2 $400,000 $400,000 $0 Major maintenance on existing lift stations Drainage Repairs at WWTP Clariers 3 $50,000 $50,000 $0 Provide safer access for operators Total $530,000 $530,000 $0 FY2023  Project Name Project No. Total Cost City Funding Grant Funding Description Lift Station Renovations To Be Identied 4 $400,000 $400,000 $0 Major maintenance on existing lift stations WTP Pump House Design 5 $250,000 $250,000 $0 Design water distribution pump house project WWTP - Digestor Blowers Construction 6 $2,500,000 $0 $2,500,000 Replace 40-year-old equipment, piping and controls WWTP, W&S Electronic Access Gate & Controls 7 $100,000 $100,000 $0 Provide restricted electronic access Total $3,250,000 $750,000 $2,500,000 FY2024 Project Name Project No. Total Cost City Funding Grant Funding Description Lift Station Renovations To Be Identied 8 $400,000 $400,000 $0 Major maintenance on existing lift stations WTP Pump House - Construction 9 $1,250,000 $400,000 $0 Construct water treatment pump house Total $1,720,000 $1,720,000 $0 WATER & SEWER FUND 28 | WATER & SEWER FUND CITY OF KENAI CAPITAL IMPROVEMENT PLAN FY2022 - 2026 FY2025  Project Name Project No. Total Cost City Funding Grant Funding Description WWTP Rotary Screen Replacement 10 $1,750,000 $0 $1,750,000 Replace 40-year-old equipment and controls Total $1,750,000 $00,000 $1,750,000 FY2026  Project Name Project No. Total Cost City Funding Grant Funding Description WWTP Inuent Pump Station 11 $1,000,000 $0 $1,000,000 Provide for surge protection and grit capture Facility Fencing Improvements 12 $200,000 $200,000 $0 Security improvements to 40-year- old fence Total $1,200,000 $200,000 $1,000,000 TOTAL PROJECTS: $8,380,000 GRANT FUNDING: $5,250,000 CITY FUNDING: $3,130,000 WATER & SEWER FUND PROJECTS 29 | WATER & SEWER FUND WWTP CHLORINE CONTACT BASIN REPAIRS 01 Department: Public Works - Water & Sewer Total Project Cost: $80,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact Details: This project will replace existing chlorine contact basin gates, valves, and appurtenances at the Waste Water Treatment Plant, which are rusted and beyond repair. YEAR: 2022 2023 2024 2025 2026 COST: $80,000 LIFT STATION RENOVATIONS - TO BE IDENTIFIED 02 Department: Public Works - Water & Sewer Total Project Cost: $400,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact YEAR: 2022 2023 2024 2025 2026 COST: $400,000 Details: This project provides for major maintenance on existing lift stations to include access, structural, and security and safety upgrades. WATER & SEWER FUND PROJECTS DRAINAGE REPAIRS AT WWTP CLARIFIERS 03 Department: Public Works - Water & Sewer Total Project Cost: $50,000 Project Phased: Yes Project Type: Building Improvement / Infrastructure Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Slight Decrease Details: This project will provide safer access for operators. 30 | WATER & SEWER FUND YEAR: 2022 2023 2024 2025 2026 COST: $50,000 LIFT STATION RENOVATIONS - TO BE IDENTIFIED 04 Department: Public Works - Water & Sewer Total Project Cost: $400,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact Details: This project provides for major maintenance on existing lift stations to include access, structural and security and safety upgrades. YEAR: 2022 2023 2024 2025 2026 COST: $400,000 WATER & SEWER FUND PROJECTS 31 | WATER & SEWER FUND YEAR: 2022 2023 2024 2025 2026 COST: $2,500,000 WWTP - DIGESTER BLOWERS CONSTRUCTION 06 Department: Public Works - Water & Sewer Total Project Cost: $2,500,000 Project Phased: No Project Type: New Building & Equipment Funding Source(s): Grant Dependent Potential Grant Identified: None Operating Budget Impact: Slight Decrease Details: This project will replace two 40-year-old blowers and install blowers in an approximately 24 x 24 square foot prefab metal building located adjacent to the existing digester tank. WATER DISTRIBUTION PUMP HOUSE DESIGN 05 Department: Public Works - Water & Sewer Total Project Cost: $250,000 Project Phased: Yes Project Type: Building Improvement / Infrastructure Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Slight Decrease Details: This project will complete design of the Water Distribution Pump House structure (foundation and building). YEAR: 2022 2023 2024 2025 2026 COST: $250,000 WATER & SEWER FUND PROJECTS 32 | WATER & SEWER FUND WWTP ELECTRONIC ACCESS GATE & CONTROLS 07 Department: Public Works - Water & Sewer Total Project Cost: $100,000 Project Phased: No Project Type: Technology Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact YEAR: 2022 2023 2024 2025 2026 COST: $100,000 Details: This project will provide restricted electronic access control to the Wastewater Treatment Plant entrance for safety and security. LIFT STATION RENOVATIONS - TO BE IDENTIFIED 08 Department: Public Works - Water & Sewer Total Project Cost: $400,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact YEAR: 2022 2023 2024 2025 2026 COST: $400,000 Details: This project provides for major maintenance on existing lift stations to include access, structural, and security and safety upgrades. WATER & SEWER FUND PROJECTS 33 | WATER & SEWER FUND WATER DISTRIBUTION PUMP HOUSE CONSTRUCTION 09 Department: Public Works - Water & Sewer Total Project Cost: $1,250,000 Project Phased: Yes Project Type: Equipment Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact Details: This project provides for completion of Phase II of the Water Distribution Pump House Project (piping 16-inch tie in, pump setup, and controls). YEAR: 2022 2023 2024 2025 2026 COST: $1,250,000 WWTP ROTARY SCREEN REPLACEMENT 10 Department: Public Works - Water & Sewer Total Project Cost: $1,750,000 Project Phased: Yes Project Type: Equipment Funding Source(s): Grant Dependent Potential Grant Identified: None Operating Budget Impact: Slight Decrease Details: This project will replace 40-year old equipment with new technology and controls. This is an integral part of the treatment process. Effectively screening the influent safe guards pumps and controls downstream, allowing operators the ability to more effectively manage the treatment process. YEAR: 2022 2023 2024 2025 2026 COST: $1,750,000 WATER & SEWER FUND PROJECTS 34 | WATER & SEWER FUND WWTP INFLUENT PUMP STATION 11 Department: Public Works - Water & Sewer Total Project Cost: $1,000,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Grant Dependent Potential Grant Identified: None Operating Budget Impact: Slight Decrease Details: This project will replace the existing influent station and install a new pump station to provide surge protection storage and grit capture. This will allow for more balanced incoming flows into the plant. YEAR: 2022 2023 2024 2025 2026 COST: $1,000,000 FACILITY FENCING IMPROVEMENTS 12 Department: Public Works - Water & Sewer Total Project Cost: $200,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Slight Decrease Details: This project will replace 40-year-old fencing and improve site security. YEAR: 2022 2023 2024 2025 2026 COST: 200,000 SENIOR CITIZENS FUND 35 | SENIOR CITIZENS FUND CITY OF KENAI CAPITAL IMPROVEMENT PLAN FY2022 - 2026 FY2022  Project Name Project No. Total Project Cost City Funding Grant Funding Description Senior Center HVAC and DDC Control 1 $48,000 $48,000 $0 Provide improved air quality and air balancing at the Senior Center Front Entry Modications 2 $75,000 $40,000 $35,000 Expand entry way to the exterior of the building Total $123,000 $88,000 $35,000 FY2023 - FY2024 Project Name Project No. Total Project Cost City Funding Grant Funding Description No data available in table Total $0 $0 $0 FY2025  Project Name Project No. Total Project Cost City Funding Grant Funding Description Senior Center Landscaping Project Phase I 3 $40,000 $0 $40,000 Landscape the south lawn of the Senior Center to a level area Total $40,000 $0 $40,000 FY2026  Project Name Project No. Total Project Cost City Funding Grant Funding Description Senior Center Landscaping Project Phase II 4 $35,000 $0 $35,000 Create a community re pit area with memorial benches Total $35,000 $0 $35,000 TOTAL PROJECTS:   $198,000 GRANT FUNDING: $110,000 CITY FUNDING: $88,000 SENIOR CITIZENS FUND PROJECTS SENIOR CENTER HVAC AND DDC CONTROL 01 Department: Public Works Total Project Cost: $48,000 Project Phased: No Project Type: Building Improvement Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact SENIOR CENTER FRONT ENTRY MODIFICATIONS 02 Details: This project provides improved air quality and air balancing at the Senior Center in the main dining area, kitchen, offices, restrooms, and entrance hall. The kitchen tends to overheat the space when in use. Heating zones may be adjusted to provide more accurate control along with new thermostats and zone sensors. 36 | SENIOR CITIZEN FUND Department: Senior Center Total Project Cost: $75,000 Project Phased: No Project Type: Building Improvement Funding Source(s): General Fund/ Grant Potential Grant Identified: No Operating Budget Impact: Slight Decrease YEAR: 2022 2023 2024 2025 2026 COST: $75,000 Details: Currently, the Center has two sets of double doors with automatic handicapped access on one side. This project installs sliding interior and exterior doors, along with providing a heated space in between. The second part of the project would involve adding a card swipe locking system to five entryway doors at the Senior Center. This will improve access to the building for those with disabilities and assist with reduce heating issues caused by the current entry. YEAR: 2022 2023 2024 2025 2026 COST: $48,000 SENIOR CITIZENS FUND PROJECTS SENIOR CENTER LANDSCAPING - PHASE II 04 Department: Senior Center Total Project Cost: $35,000 Project Phased: Yes Project Type: Land Improvement Funding Source(s): Grant/ Donation Dependent Potential Grant Identified: State Operating Budget Impact: Minimal or No Impact Details: This project would create a community fire pit area with wooden all-weather park benches for easy access for seniors and private rentals. Memorial benches and greenery provide an opportunity to generate revenue and celebrate individuals in the community. The project would be contingent on the construction of the Bluff Stabilization Project. 37 | SENIOR CITIZENS FUND YEAR: 2022 2023 2024 2025 2026 COST: $35,000 SENIOR CENTER LANDSCAPING - PHASE I 03 Department: Senior Center Total Project Cost: $40,000 Project Phased: Yes Project Type: Land Improvement Funding Source(s): Grant/ Donation Dependent Potential Grant Identified: State Operating Budget Impact: Minimal or No Impact YEAR: 2022 2023 2024 2025 2026 COST: $40,000 Details: This project would landscape the south lawn of the Senior Center to level the area, which now contains sunken areas which prohibit safe access, and replant grass and trees as well as construct walkways for easy and safe maneuvering. This would improve lost access to the perimeter of the building, yard, and bluff areas for private rentals and the public, including wheelchair access. The project would be contingent on the construction of the Bluff Stabilization Project. CONGREGATE HOUSING FUND 38 | CONGREGATE HOUSING FUND CITY OF KENAI CAPITAL IMPROVEMENT PLAN FY2022 - 2026 FY2022  Project Name Project No. Total Cost City Funding Grant Funding Description Vintage Pointe Fire Alarm Upgrade Supplemental 1 $40,000 $40,000 $0 Replacement of outdated equipment with new Apartment Kitchen and Bathroom Remodel 2 $100,000 $100,000 $0 Remodel the kitchen and bathrooms in 3-6 apartments Total FY2023  Project Name Project No. Total Cost City Funding Grant Funding Description Apartment Kitchen and Bathroom Remodel 2 $100,000 $100,000 $0 Remodel the kitchen and bathrooms in 3-6 apartments Total $100,000 $100,000 $0 FY2024  Project Name Project No. Total Cost City Funding Grant Funding Description Apartment Kitchen and Bathroom Remodel 2 $100,000 $100,000 $0 Remodel the kitchen and bathrooms in 3-6 apartments Vintage Pointe Elevator Major Maintenance 3 $50,000 $50,000 $0 Major elevator maintenance to allow for continued safe operation Total $150,000 $150,000 $0 FY2025  Project Name Project No. Total Cost City Funding Grant Funding Description Apartment Kitchen and Bathroom Remodel 2 $100,000 $100,000 $0 Remodel the kitchen and bathrooms in 3-6 apartments Total $100,000 $100,000 $0 FY2026  Project Name Project No. Total Cost City Funding Grant Funding Description Apartment Kitchen and Bathroom Remodel 2 $100,000 $100,000 $0 Remodel the kitchen and bathrooms in 3-6 apartments Total $100,000 $100,000 $0 $140,000 $140,000 $0 CONGREGATE HOUSING FUND PROJECTS VINTAGE POINTE FIRE ALARM UPGRADE SUPPLEMENTAL 01 Department: Public Works Total Project Cost: $40,000 Project Phased: Yes Project Type: Building Improvement Funding Source(s): Congregate Housing Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact APARTMENT KITCHEN AND BATHROOM REMODEL 02 Details: This project replaces outdated fire alarm equipment with new fire alarm equipment. 39 | CONGREGATE HOUSING FUND Department: Senior Center Total Project Cost: $500,000 Project Phased: Yes Project Type: Building Improvement Funding Source(s): Congregate Housing Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact YEAR: 2022 2023 2024 2025 2026 COST: $100,000 $100,000 $100,000 $100,000 $100,000 Details: This project remodels the kitchen and bathrooms in three to six apartments each year at Vintage Pointe. The project would replace original (1993) tile flooring, cabinetry, countertops, and fixtures in kitchens and bathrooms to bring apartments into compliance with the Americans with Disabilities Act. This project is not eligible for low-income housing grants. YEAR: 2022 2023 2024 2025 2026 COST: $40,000 CONGREGATE HOUSING FUND PROJECTS VINTAGE POINTE ELEVATOR MAJOR MAINTENANCE 03 Department: Public Works Total Project Cost: $50,000 Project Phased: Yes Project Type: Building Improvement Funding Source(s): Congregate Housing Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact Details: This project will provide for major maintenance of the Vintage Pointe elevator to allow for the continued safe operation of the City's most used elevator. The Vintage Pointe Senior Housing was constructed in 1993 and is approximately 40,450 square feet. 40 | CONGREGATE HOUSING FUND YEAR: 2022 2023 2024 2025 2026 COST: $50,000 CITY OF KENAI CAPITAL IMPROVEMENT PLAN FY2022 - 2026 FY2022  Project Name Project No. Total Cost City Funding Grant Funding Description Personal Use Fishery Float Replacements 1 $50,000 $50,000 $0 Purchase ten new oats at the City Dock Boat Ramp Concrete Repairs 2 $125,000 $0 $125,000 Replace concrete ramps at the City Dock PERSONAL USE FISHERY FUND 41 | PERSONAL USE FISHERY FUND Total $175,000 $50,000 $125,000 FY2023   Project Name Project No. Total Cost City Funding Grant Funding Description Personal Use Fishery Float Replacements 1 $50,000 $50,000 $0 Purchase ten new oats at the City Dock Total $50,000 $50,000 $0 FY2024  Project Name Project No. Total Cost City Funding Grant Funding Description No data available in table Total $0 $0 $0 FY2025  Project Name Project No. Total Cost City Funding Grant Funding Description Boat Ramp Concrete Repairs 2 $135,000 $135,000 $0 Replace concrete ramps at the City Dock Total $135,000 $135,000 $0 FY2026  Project Name Project No. Total Cost City Funding Grant Funding Description No data available in table Total $0 $0 $0 PERSONAL USE FISHERY FUND PROJECTS PERSONAL USE FISHERY FLOAT REPLACEMENT 01 Department: Public Works Total Project Cost: $150,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Personal Use Fishery Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact CITY DOCK BOAT RAMP CONCRETE REPAIRS 02 Details: This project, which began in FY2021 purchases ten new floats at the City Dock and Boat Ramp to replace existing floats. There are currently 22 float sections in total for the ramp and another eight for the front of the trestle. 42 | PERSONAL USE FISHERY FUND Department: Public Works Total Project Cost: $260,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Personal Use Fishery Fund/ State Grant Potential Grant Identified: State Operating Budget Impact: Minimal or No Impact YEAR: 2022 2023 2024 2025 2026 COST: $125.000 $135,000 Details: This project will replace the concrete ramps at the City Dock in FY2022 and FY2025. The FY2022 portion of the project will be funded with the State of Alaska North and South Beach Improvement Grant. YEAR: 2022 2023 2024 2025 2026 COST: $50,000 $50,000