Loading...
HomeMy WebLinkAboutRESOLUTION 1993-55 CITY OF iCI~AI RBSO~ON 93-~$ A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA, AwARD.IN(I. A CONTRACT FOR THE ARCHITECT/ENGINEERING SCHEMATIC DESIGNAND DESIGN DEVELOPMENT PHASES ON THE PROJECT ENTITLED ImNAI SIIEL~ TO KLUGE AND ASSOCIATES FOR TH]~ NOT-TO-EXCEED AMOUNT OF'.' WItEREAS, the first two phases of Kluge and Associate's proposal dated July I, 1993, is.·. approved by the City, and WHE~S, the cost for their services is as follows: II. IH. Schematic Design Phase ......... ... ........ $ 9,400 Design Development Services ....... . ......... 14, I00 Construction Documents Services ............... ~ Total ..... ..... ...................... $48,800 WHEREAS, sufficient funds have been appropriated to award the above first two phases of this project, and WHEREAS, it is understood that the third 0r~) phase of construction documents services, in. the' amount of $25,300, which was included in the Architects proposal, is not to be started until'the,.' funds are appropriated and they are given written approval by the City, and Wt~~, the recommendation of the Public Works Department is to award the contract to ".'. Kluge and Associates, and WItEREAS, the Council of the City of Kenai has determined that award to this firm would be in the best interest of the City, and NOW, THEREFORE, BE IT RF~OLVED BY THE COUNCIL OF THE CITY OF ICENAI, ALASKA, that the contract for the Architect/Engineering Schematic Design and Design Development Phases of the project entitled Kenai Animal Shelter be awarded to Kluge.and Associates for the not-to-ex~ amount of $23,500. PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA ATI'F~T: Carol L. Freas, City Clerk Approved by Finance: ~ Written by Public Works: /kv/7/1/93 ~ 1993. TO: FROM: Mayor Williams and C0Un~ Members., Keith Kornelis, Public Works DATE: luly 1, 1993 SUBJECT: sci.mmic OesiSn & Design Devdopmmt lqew Kemi ~ ~ Attached is Resolution 93-55 which awards .the first two phases of the new Kenai Animal Shelter' The'City has. some one sheet ske~hes.Of 'fi~. plan..,u~gestiOns that might help in oUr;'th°Ught. ,.-. process of what.is, needed. At this Point we. feel. that 'the Shelter'~.~ be,enlarged by about twice what it is now. .. . .. .. '" " Due to the uncertainty of funds, we are 'having .the architect design .the building So.that it can be reduced, should, we not receive enough money .from the legislnmm tO. complete.the en".tire b_~..,..ding as designed', we will have a much better idea of what is needed and its COst after the design development services phase. These first two phases do not include design ready plans. That. is what is accomplished in the third phase, COnstruction document services. ? eflal · July 1, 1993. Keith Komelis, Public Works Director '.'.. City of Kenai 2t0 Fidalgo, Suite 200 Kenai, AK 99611 ANIMAL CONTROL SHELTER ARCHITECTURAL SERVICES Dear Mr. Komelis: As requested, we have developed a professional fee for providing Architectural services on the referenced project. It is our understanding that the scope of work is as follows: Meet with City Administration personnel to discuss program of proposed facility and." develop diagrammatic sketches. · Develop a Schematic Design for the facility based on results of our initial meeting. · Prep~e presentation Schematic· Drawings.consisting of site plan, floor plan, exterior elevauons and building sections. ' '~' ' · ·Prepare an in-house schematic. estimate based. on schematic drawings .and 'oUr lOCal · construction experience, -., .. · Present Schematic Design package to the City Council, noting'critique comments. ' · Incorporate schematic comments into Design Development Phase of service~ - - · Prepare Design DeveloPment documents to include drawings that set forth in detail Architectural, Structural, Mechanical and Electrical systems. In. addition, a set of outhne specifications will be prepared. · Prepare a three dimensional rendering of the proposed building's exterior. Prepare a Design Development level professional estimate. · Present the Design Development package to the City Council, noting critique comments. · Upon notice .to proceed with project, continue with preparing Contract Documents 'fOr We .are an,t. icipating and have included in our services, designing this. facility to accOmmodate the neeos, outhned by the CitY/Shelter Administration. Allowances shall bc made in the design to permlt phased construction and future kennel space. Our Schematic and Design Development design w,ork shall provide for 4,500 to 5., .0~.~ ~ square foot of building with the flexibility to phas~ construcuon of 2,500-3,000 square feet mmally. July 1, 1993 Animal Control Shelter Proposal Page 2 of 2 Our fee for the proposed facility is broken down by phases to allow for determination of conslruction funds available prior to preparing bid documents. We propose to provide serVices, aS.` follows: Schematic Design Phase Design Development Services Contract Documents Services Total Fee $9,400 14,100 25.300 $48,800 The above fee includes all reimbursables with the exception of printing presentation/review drawings. We have excluded Bidding Phase and Contract Administration services. These services may be negotiated at a later date. If you have questions or need more information please feel free to call. Sincerely, KLUGE & ASSOCIATES Bill Kluge, Principal Architect BK:tw