Loading...
HomeMy WebLinkAboutRESOLUTION 1993-84 C~ZTY OF TJM~.Z ~JBOZ, OTXON NO. , g3-84 ~ ~ ~ CO~CT. FOR ~E ~~ CO~THOUSE CO~ZN~TED SOZLS PR0~E~ ~. G~CZ~' .~IRO~~. S~VZCES INC. FOR ~-TOT~ PRO3ECT ~0~ OF $425,015.00. ~~S, the follovtnq b/dB were recelved on O~OB~ 12, i993' ~or the' above reEerenced project: Glacier Env. Fertech Sound Env. Tuboscope Soil Services Alaska Road. Oil Spill 425,015.00 430,.000.00 608,145.00 6~0,520.00 622,801.80 1,059,430.00 non-responsive WHEREAS, the following is a description of the total project: Basic: Design, Remediation, Testing and Disposal of Contaminated. Soils, and WHEREAS, Oil Spill Consultant's bid has been declared non-responsive. because they did not submit a proposal as required in...the...Bid Specifications, and ..' WHEREAS, the recommendation from the Public Works Department is tO. award the contract to Glacier Environmental Services Incorporated for the total project cost of $425.015.00, and WHEREAS, the Council of the City of Kenai has determined. that Glacier Environmental Services Incorporated's bid for $425,.015.00 is the lowest responsible bid and award to this bidder would be in the best interest of the City, and WHEREAS, sufficient monies are appropriated. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, that the contract for the Alaska Courthouse Contaminated Soils Project be awarded to Glacier Environmental Services Incorporated for the total project amount of $425,015.00. From: CITY OF KENAI' 210 FIDALGO AVE., SUITE 200 KENAI, ALASKA 99611-TTe4 TELEPHONE 907'28,1-75:3S FAX g07-2S3-3014 'MEMORANDUM Rachel Clark, Engineering Technician Kelth Komelis, Public Works Director SubJe~: Alaska Courthouse Contamirmted Sells Bid Proposals Enclosed is a preliminary evaluation of the three lowest bidders for the above mentioned project. The proposal of the apparent Iow bidder, Glacier Environmental, appears to be complete. At this point, I would tentatively recommend that the project be awarded to them. The City Engineer concurs with this recommendation. I am still in the process of verifying references. I will let you know by Tuesday if any information given by the references changes my recommendation. Some things to be aware of: 1. This soil i.s. going to follow us around forever if it is not cleaned up properly. Neither bioremedlation nor soil-washing has quite as good a track record as thermoremediation. However, the thermoremedlation bid was quite a bit higher than either of these methods. 2. The City will still be considered the responsible party until, and even after the soil has been released for final disposal. Any problems i,vith the workplan, Contractor, or cleanup level will be addessed to us. 3. None of these contractors is likely to start work this year. All of them propose to be finished by September 1, 1994. If council chooses not to Award the project to any of these bidders, I will start work on the next three: Tuboscope Vetco, Inc.- soil washing Soil Services Inc. - thermoremedtation Alaska Roadbuilders- thermoremediation to asphalt Let me know if you have any questions. ' GlaCier Environmental ':Mukfltao, WashingtOn. Segmoationf$Oil Washing' · . .~'..that. test bel0w.'the'.01ean,up level':Will, be' dlS~ :..of (no 'specific .:~tl0n -.. .'for dispose!-is tno!uded), .piles. above the ,'Clee,h Up:-IeVel will:be chemically washed on-site,. After confirmation testing,., the 'cleaned .SOil will be.'.:..,. .. disposed .in..an ADEC. approved location.:.' -Wash'. water wlllbe recycled Schedule: QAPp: yes. Approximately 2 months for a bench sc, ale.study, 2 weeks for segregation, and 2 months for washing. Total with disposal is approximately 5 months. Expeden~e: Extensive in Washington, limited in Alaska. . Largest Project - 20,000 cy ' (transportation, excavation), 3,000.oy for. remedtation....Largest Alaska .. project $i00,000:00' '" ," - ' One'mgulato~.. agency ssid that.this :Contractor; ~h' a: project pri~..' to..:...",' 'receiVing aP~0Vdl from ADEC. ,one refer~ sai. dthat the:~ .had never'. known' this OontraOtor to have,' a pm~. with rt~tulatom. .. ~ This ContraCtOr has never submitted a workplan for review in AlaSka.. Bid Clarification!.. On item t~9 of the 'Bid PrOpOSal,' this .COntractor Wrote the words "fifteen dollars even" under.the unit priCe,.:but wrOte the nUmbers '$15,000.00" under the Total. Bid'price.. AOCordingto Bid SPecs, discrepancies between words and numbers are resolved .in. favor of words. The contractor has' stated that he will not declare-a mistake on this item, and' will accept a bldPdce of $16.00.. His Total Bid Was · recalculated from $440,~.00 'tO $425,015.00. "' .Fertech Enviro Systems, Inc. Moberly, Missouri Work plan: · , * SC:hedule: Enhanced blommedlation A bi°remedlation Cell Will 'be constructed off,site; andlcontamlnated .sOil "(both above'.' and. b~0w ground)' Will be'transported there for treatment. Atter.o°nfirmetion t~ting, cont~lnated ~olls wilt be tandflll~l blt .Ar~tech 3-4.'mOnths:for mmedlation. (ADEC's~ests that'this would be, Unrealistic for a non.enhanCed Uoremedlation)' This Contractor does not currently have an approved QAPP, nor was the ability.to get one mentioned In their subm~tal (as requested in the Bid Specs), .They have told me verbalS/that they am in the process of'.. getting one. Experience: No work has been performed in Alaska. Largest project to date is 2000 cy....Largest ccet$56,000. ..~. This Contmctor'mlStakenlY identmad himseff.as responsible for testing. and. analysis. '.'This'.is..not allOwed per. ADEC regu!atims. An .' ' independent, third party must dOrConfirmetion, testing. ' and analYSiS, No testing for DieSel Range Organics was Identified (the primary contaminant in this soil). Offsite remedlation could require public notice by' ADEC. Have not had a WOrkplan approved by ADEC yet. are in the process of. having one reviewed, As of. yet, no blommedlation project has ever been bonded in the' State of Alaska, however, this Contractor has assured .me verbally that he will be able to get 'one. · Sound Environmental Anohorage, Alaska Bid: $608,145.00 Method: Work Plan: Chemical Stabilization The contaminated soil (both above ground and below) will be ohemleallY treated on.site to a clay-tike mixture. The mixture would .be tri~nsp0rted; to the Kenai Munloipal Airport or other approved site and spread prepared subgrade, and capped to form a parking lot and airplane tie, down. The bidder estimates he will be able to cover approximately ..' 90,000 square feet of surface, the City Engineer estimates the equiValent paved area would be worth a maximum of $100,000.00. Schedule: Approximately 3-4 months from start to final disposal. yes- by third party Experlem=e: Extensive experience in Alaska. Other: Largest project listed in Alaska - 6,500 cy. Largest cost for remediation in Alaska is 2.0M. The Bid Spars did not make City property available for disposal in this' manne~ .:. Similar (but not Identical) workplans have been previously approved for.. this Contr~otor by ADEC. Bid Clarification: On item #12 of the Bid Proposal, this Contractor wrote the words 'forty-eight and 41/100' under unit cost, for a Total Bid Price of $48.41. He did not multiply the unit cost by the quantity, 3000 Cy: .... The actual Total Bid Price for this item is $145,230.00..His Total Bid- was recalculated from $462,963.41 to $608,145.00.