Loading...
HomeMy WebLinkAboutRESOLUTION 1991-35Suggested by: Administration C~ITY OF K~I/kZ RBSOZ, UTION NO. A RESOLUTION OF THE COUNCIL OF' THE CITY OF KENAI, ALASKA, AWARDING coNs uc o RDZNATION~ QU~ITY CONTROL~ S~VEYING~ TESTING ~. QU~TITY COllATIONS ~D ~NSPE~ION SERVICES TO WINCE, COR~E~, BRYSON, FOR THE PROJECT ~TITL~ T~ING BAY RO~ ~D G~ITE POI~ S~ET FOR A NOT-TO-EXCEED ~O~T OF $49,000.00. WHEREAS, the City of Kenai received the attached proposal from Wince, Corthell, Bryson for this work; and WHEREAS, the coordination, computations, award includes project construction management, quality control, surveying, testing, quantity and inspection services; and WHEREAS, sufficient funds are appropriated; and WHEREAS, the Kenai City Council feels that it is in the best interest of the City of Kenai to award this contract to Wince, Corthe11, Bryson. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OFT HE CITY OF KENAI, ALASKA, that a contract be awarded for Engineering Project Construction Management, Coordination, Quality COntrol,' Surveying,. Testing, Quantity computations, and Inspection Services to Wince, Corthe11, Bryson for the project entitled Trading Bay Road and Granite Point Street for a not to exceed amount of $49,000.00. PASSED BY THE COUNCIL OF THE' CITY' OF' KI~Ai" Ai~SKA, 'this-5th' day Of June, 1991. .... Carol Fre& , Cty C erk Approved by Finance: ~qW _. Written by Public Work-~.- ~ WINCE · CORTHELL * BRYSON CONSULTING ENGINEERS P O Bmc 1041 907-283-4672 KENAI, ALASKA 99611 31, 199! City of Kena~ 210 Fidalgo Street Kenai, Alaska 99611 Attention: Jack LaShot, P.E. Subject.- R~vised Proposal for Construction Management Services City of Kenai 1991 Street Improvements Trading Bay Road and Granite Point Street .~., In accordance wi~h your verbal request, we herewith submit' this proposal to provide Inspect/on,Surveying, Quality Control Test- ing, and Project Management Services for the Subject Project. We propose to utilize the following Subcontractors in ~rovidinq the services required as part of this Contract: Surveying Testing Integrity Surveys McLane's and-AsSoc. It is our intention to have Mark Blanning, assisted by Dave Monnie, provide the Inspection and Project ~anagement Services as Contractors, activities dictate. We estimate that the following Engineering Services will necessary to adequately inspect the Subject Project: be Engineer VI 200 hrs Enqr. Tech. 400 hfs Mark Blanning P.E. Dave Monnie 1 .Phfflp W er~on p E Alan N Corthell P E ' ' Frank W Wince p E SURVEYING BASZC BZD $15,400.00 3,000.00 $11,000.00 $29,400.00 ALT. Z 3,780.00 1,500,00 3,000°00 8,280°00 ALT. ~l 1,680.00 300.00 0.00 1,980.00 ALT. ZIZ 1',680.00 300.00 0-00 1,980.00' ALT. ZV 2,100.00' 200.00 1,100.00 3,400.00 ALT. V 1,680.00 300.00 0.00 1,980.00 ALT. VI 1,680.00 300.00 0.00 1,980,00 49,000.00 We propose to provide the aforementioned services for ~he SUbject Pro~ect in an a~ount not to exceed the total o£ the Basic Bid plus those Alternates determined by ~he council tO be tn the best interesks of~ the city. We propose to provide these Services in accordance Standard List of Rates and Charqes, a copy o£ which is 'If you have any questions, please earliest convenience. with our attached. contact our o£ftce at your ..~ Very truly yours, WZNCE-CORTHELL-BRYSON 2 WINCE-CORTHELL-BRYSON CONSULTING ENGINEERS' BOX 1041 KENAI, ALASKA SCHEDULE OF RATES AND CHARGES FOR ENGINEERING SERVICES EFFECTIVE JANUARY 1, 1991 ENGINEERING* Engineering VII Engineering VI Engineering IV Engineer III Engineer Technician Draftsman Typist (reports & specifications onlY) CAD System (in addition to operator) RATE PER HOUR ** $80.00 $70,00 $5s.oo $45.00 $35.00 $35.00 $35.00 $z5.oo SUBCONSULTANTS= Subcontract cost Engineering,Surveying,Drafting, plus 10% etc. ADDITIONAL CHARGES= ( 1. Automobile travel for trips to points in excess of five from office, at the rate of $0.40 per mile both ways. miles 2. Actual cost of airline, charter,train, bus or cab fare or auto rental. .., 3. Actual cost of subsistence and lodging. 4. Actual cost of long distance telephone calls, telegrams, freight and express charges, and postage other then ordinary first-class. 5. Actual cost of materials required for the Job and used in surveying, print£~g and reproduction costs. 6. Actual cost of special tests and services for special consultants. To the tqtal amount of Items 2 through Item 6 above, an amount of ten percent (10%) shall be added for administrative and overhead costs. * Engineering classifications shown correspond to ASCE grades. ** Rates for projects whick require 120 hours or more of Engineer Classified position time are subject to prior negotiation. Special rates shall apply only if negotiated prior to the start of the pro- ject.