HomeMy WebLinkAboutRESOLUTION 1991-35Suggested by: Administration
C~ITY OF K~I/kZ
RBSOZ, UTION NO.
A RESOLUTION OF THE COUNCIL OF' THE CITY OF KENAI, ALASKA, AWARDING
coNs uc o
RDZNATION~ QU~ITY CONTROL~ S~VEYING~ TESTING ~. QU~TITY
COllATIONS ~D ~NSPE~ION SERVICES TO WINCE, COR~E~, BRYSON,
FOR THE PROJECT ~TITL~ T~ING BAY RO~ ~D G~ITE POI~ S~ET
FOR A NOT-TO-EXCEED ~O~T OF $49,000.00.
WHEREAS, the City of Kenai received the attached proposal from
Wince, Corthell, Bryson for this work; and
WHEREAS, the
coordination,
computations,
award includes project construction management,
quality control, surveying, testing, quantity
and inspection services; and
WHEREAS, sufficient funds are appropriated; and
WHEREAS, the Kenai City Council feels that it is in the best
interest of the City of Kenai to award this contract to Wince,
Corthe11, Bryson.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OFT HE CITY OF KENAI,
ALASKA, that a contract be awarded for Engineering Project
Construction Management, Coordination, Quality COntrol,' Surveying,.
Testing, Quantity computations, and Inspection Services to Wince,
Corthe11, Bryson for the project entitled Trading Bay Road and
Granite Point Street for a not to exceed amount of $49,000.00.
PASSED BY THE COUNCIL OF THE' CITY' OF' KI~Ai" Ai~SKA, 'this-5th' day Of
June, 1991. ....
Carol Fre& , Cty C erk
Approved by Finance: ~qW _.
Written by Public Work-~.- ~
WINCE · CORTHELL * BRYSON
CONSULTING ENGINEERS
P O Bmc 1041 907-283-4672
KENAI, ALASKA
99611
31, 199!
City of Kena~
210 Fidalgo Street
Kenai, Alaska 99611
Attention:
Jack LaShot, P.E.
Subject.-
R~vised Proposal for Construction Management Services
City of Kenai
1991 Street Improvements
Trading Bay Road and Granite Point Street .~.,
In accordance wi~h your verbal request, we herewith submit' this
proposal to provide Inspect/on,Surveying, Quality Control Test-
ing, and Project Management Services for the Subject Project.
We propose to utilize the following Subcontractors in ~rovidinq
the services required as part of this Contract:
Surveying
Testing
Integrity Surveys
McLane's and-AsSoc.
It is our intention to have Mark Blanning, assisted by Dave
Monnie, provide the Inspection and Project ~anagement Services as
Contractors, activities dictate.
We estimate that the following Engineering Services will
necessary to adequately inspect the Subject Project:
be
Engineer VI 200 hrs
Enqr. Tech. 400 hfs
Mark Blanning P.E.
Dave Monnie
1
.Phfflp W er~on p E
Alan N Corthell P E ' ' Frank W Wince p E
SURVEYING
BASZC BZD $15,400.00 3,000.00 $11,000.00 $29,400.00
ALT. Z 3,780.00 1,500,00 3,000°00 8,280°00
ALT. ~l 1,680.00 300.00 0.00 1,980.00
ALT. ZIZ 1',680.00 300.00 0-00 1,980.00'
ALT. ZV 2,100.00' 200.00 1,100.00 3,400.00
ALT. V 1,680.00 300.00 0.00 1,980.00
ALT. VI 1,680.00 300.00 0.00 1,980,00
49,000.00
We propose to provide the aforementioned services for ~he SUbject
Pro~ect in an a~ount not to exceed the total o£ the Basic Bid
plus those Alternates determined by ~he council tO be tn the best
interesks of~ the city.
We propose to provide these Services in accordance
Standard List of Rates and Charqes, a copy o£ which is
'If you have any questions, please
earliest convenience.
with our
attached.
contact our o£ftce at your ..~
Very truly yours,
WZNCE-CORTHELL-BRYSON
2
WINCE-CORTHELL-BRYSON
CONSULTING ENGINEERS'
BOX 1041
KENAI, ALASKA
SCHEDULE OF RATES AND CHARGES FOR ENGINEERING SERVICES
EFFECTIVE JANUARY 1, 1991
ENGINEERING*
Engineering VII
Engineering VI
Engineering IV
Engineer III
Engineer Technician
Draftsman
Typist (reports & specifications onlY)
CAD System (in addition to operator)
RATE PER HOUR **
$80.00
$70,00
$5s.oo
$45.00
$35.00
$35.00
$35.00
$z5.oo
SUBCONSULTANTS=
Subcontract cost
Engineering,Surveying,Drafting,
plus 10%
etc.
ADDITIONAL CHARGES= (
1. Automobile travel for trips to points in excess of five
from office, at the rate of $0.40 per mile both ways.
miles
2. Actual cost of airline, charter,train, bus or cab fare or auto
rental. ..,
3. Actual cost of subsistence and lodging.
4. Actual cost of long distance telephone calls, telegrams, freight
and express charges, and postage other then ordinary first-class.
5. Actual cost of materials required for the Job and used in
surveying, print£~g and reproduction costs.
6. Actual cost of special tests and services for special consultants.
To the tqtal amount of Items 2 through Item 6 above, an amount of ten
percent (10%) shall be added for administrative and overhead costs.
* Engineering classifications shown correspond to ASCE grades.
** Rates for projects whick require 120 hours or more of Engineer
Classified position time are subject to prior negotiation. Special
rates shall apply only if negotiated prior to the start of the pro-
ject.