RESOLUTION N0. 81-74
A RESOLUTION OF THE COUNCIL OF THE CITY OF RENAI, ALASKA,
AOTHORIZING THE CONTRACT FUR ARCHITECTURAL/ENGINEERING DESIGN P.ND
INSPECTION FOR RENOVATIuN OF T8E RENAI MUNICIPAL AIRPORT TERI4INAL
BUILDING BETWEEN THE CITY OF RE2JAI AND CARMEN V. GINTOLI,
ARCHITECT.
WHEREAS, the City of Kenai received eight proposals for this
project, and
WHEREAS, this project is funded with 1981-82 State Legislature
funds, and
WHEREAS, this contract will not be executed until these funds are
available, and
WHEREAS, this
project has been authorized by the Council of the
City of Renai, and
WHEREAS, the proposals from all eight firms were given
consideration and study by the Public Works Committee of Council,
and
WHEREAS, the Public Works Committee of Council recommends to the
Council as a whole that the contract for this project be awarded
to Carmen V. Gintoli, Architect, and
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
RENAI, ALASKA, that Carmen V. Gintoli, Architect be awarded the
project of the Architectual/Engineering Design and Inspection for
the Renovation and Expansion of the Renai Municipal Airport
Terminal Building for a lump sum figure of $190,250, subject to
receipt of the grant and appropriation of monies.
PASSED BY THE COUNCIL OF THE CITY OF RENAI, ALASKA, this 19th day
of August, 1981.
~.--„~--
VINCENT O'REILy3, YOR
ATTESTS C
3 et Whelan, City Clerk
carmen virrcer~t gintoli, architect -
~ox 3aQ4 p~ofe~ional building suite 210
enai, a aska 9966117
~JO7 283.7732
July 31, 1981
' City of Kenai -
~ Post Office Box 580
Kenai, Alaska 99611
Attention Mr. Ketth Kornelis, Director
Public Works Department
Dear Ke1th:
•, Per our telephone conversation this day, we are pleased to offer the
following tee schedule.- ~
Our fee is based on a "Services Rendered" schedule rather than
percentage of contract. The fee-will be the Lump Sum amount of
' 5190,250.00.
- t•!e will take the protect beginning with Schematic Designs, through
the bidding phase and provide a full-time on-site individual during
the course of construction, assuming ~ twelve month construction period.
. Please refer to the enclosed copy of. the proposal submitted on June 24th,
1981. Specifically Items 1 through,lO for the outline of specific
services to be provided.
_ Please do not hesitate in calling us should you have furtf~er questions.
We will be pleased to meet with you at your convenience to negotiate a
contract. .
Sincerely, -
~• ca ~~ vlncent gint li, architect - ~ -
t~
Carmen V. Gtntoli -
- CVG:sb ~ •
Enc. •
/~
carr~sen vincent Gintoli, architect
box 3504 proles Tonal building suite 210
kena~, ataska 9Jf1~
907 283.7732
„itv F;ena~
:';:St :if f I CE 7Y iQJ
r:e~ai, Flasks 99611
Attention -`.r. Y.eitt. t:or.^.elis, G:recTCr
G~;,artmert o` Public YJ~rks
RE: 1981 Airport Terminal Renovations and Er.;..ansio.^.s Proposal for
Architectural Services
PROPOSAL
1. Carmen Vincent Gintoli, Architect
Kenai Professional 9uilding Suite 210
Post Office Sox 3504
Kenai, P.laska 99611
283-7732
2. Established in Y.enoi April 24, 1978 •
Previous Address - 5 Hioh Street, Medford, Massachusetts
February 5, 1976 tc January I, 1978
3. Qualified for General Practice of Architecture
4. Principal;
Carmen V. 6~ntofi, Registered Architect in Alaska and Massachusetts
N.C.A.R.B. Certificate in Process
5. -• Key Personnel:
Y.enneth 6. Leader, A l f;, Ren i stered Architect i n P, l aska
• Certified by N.C.A.~.5.
See enclosed resume for experience •
6. Staff available: Carmen V. Gintoli
Kenneth B. Leader •• ,
Both will be directly involved in design •and_production of
contract documents.'
Additional Staffing as required for project.
7. Consultants:
Airport - Howard Nsedles Tamm?n and Bergendoff, Sea~tle office•
'a ~ .
• '+[ ,
? Consultants (contin~Ed)
• ,CIVI I, SOIIS, and .~,truCtUrtlt LnOtneerlnc - 4,'Ince C7rt~~F•II Cr}'SOn, F.E''.ci
Surveyinc - 'alone Surveyin5, Y.enai
';echanicel - Jan t:. Ha~,sen F.~. Anc`~cra?c-
Electrical - David _. Olscr. P.L. hnchorace
~. ~I; er rn e~~S. ~v'c c-•,~i.~~- ~jl• 1O.'.~
.O~ ~~;; i
G Lu,^rPcT Frc ~ ': ~ 5 • ~'' Car one I I ^.e5 1 ~enCE ~ i n~', ~~:)/
Pit*s K~.si~ence ?.IGC~,OJ~~
~.+_ ~_ Fethod:
10. va~a uctherinc
?hysica! - On site inspection cf e>:is~`inc conCitions, whicF, CUE to -
' our past invotvment or, t~~-eE :,ro,iects at the facility
'(Two Schematics, and Contract Documents for Arctic coyer),
_ puts us in a unique.position of familiarity with the
StructurE. E~camination of existing condition drawings
which will be verified by physical measurement of existinc
Structure.
S*~ace Design - ConTa~t wilt be made with ALL Commuter Airlines ~..^.d
Carriers bet t, present, and these who have applied for space
i.e. Sr:ien, Alaska Air Lines, P..A.1., South Central, Sea
Air, etc. '
Information will be gathered from: the users regarding special
requirements and number of passengers present and anticipated.
We wilt also meet with Rental Car Agencies and around trans-
portation agencies to determine their requirements for terminal
space and parking space. ,
Data gathered from these meetings wilt be assimitated in
Report form.
11. Evaluation: Data Report will be given to the City of Kenai for Review
and Comment. Our team wilt meet with City of Kenai Officials -
as required for Data Report Review and Recommendations.' Review
results ~ti~ill be coordinated with various users.
Schematic Design Phase: After Uata Report is revie~red and approved, t:~c
information will b~ put in schematic desi~r~ form an~ presente~
to the City of Y.enai and to the users for review and comment.
Presentations for Public Hearings will be made as required by
the C i ty of Kenai .
Ait information gathered from various presentations will be
assimilated and revisions to the Schematics will be made if
required.
Preliminary Design: Upon final acceptance of ii~e Schematic Designs, we
will proceed tcs the Preliminary Design phase.
_ Preliminary Designs will bs presented to the City of t:enai and
the users for review.
Public Presentation will be made as required by the City.
1
,. ,,,~
• _~... _ ~r.. -
J?sJgn :J~•.el;,:,,r.ent/Cofilract UG=u•'ibr~TS: :•:iOr~ eCCepTOnCE Of the
'rre l i rc~ nary Ges i ohs, the Des i ar Deve l cpr~ent /Cor,tracT
DocurlenT phase will begin. rerricdie presentations will
be rr,adE tc the City of Y.e;~ai durino this phase. Sai~
presentations wilt bE made at L: percent completion,
5~ acres^t coma, I et io-, anC 7: percent coma: I eT 1 on. r Ina I
.•~G %~'~~'a~ I Cfl w I I i be C.a.^. ~: u&f ore P I L'u I nc "r0~8~Ur&.
D~rirl~ alf phases of desicr,,'O;ficials of the City c` ~:Rnai
are er~rouraoec tc v i s i t our c" i ces for aro~-ess u;: c~~es.
13iddinc: Y:e v.•ill assist the City as rec;:irea dJring the Eieding
Phase ir: Bid Tabulation anc ir~Terpreta'ior~.
Construction Phes?- ?rovide a full tir:e an site individual to:
1. Observe construction and report variations from
the Contract Documents.
• 2. Review and approve 311 submittals.
3. Review and approve for consideration by City of
all Pay Requests.
4. Perform a{I duties required of a Froject lnspettor.
The proposal includes, but is not timlted to, all of~the above.