CITY OF KENAI
RESOLUTION N0. 81-88
~ ;,
A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA AWARDING A
CONTRACT FOR THE CONSTRUCTION OF MAIN STREET LOOP, BARNACLE WAY
TO Doyle Construction Company
WHEREAS, Attachment A is a summary of the bids received and the method
of award.
WHEREAS, the recommendation from Wince, Corthell, 3ryson, and Freas,
the project design engineer, is to award the contract to
Doyle L'OriStTUCtlori company
WHEREAS, Doyle Construction Company 's bid is the lowest
responsible bid and award to this bidder would be to the best interest
of the City, and
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF KENAI,
ALASKA, that the contract for the construction of 1981 Main Street
Loop, Barnacle Way be awarded to Doyle Construction Company
in the amount of $ 744,179.26-- which includes
Schedules A, B . C . D, and F
PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, this 15th day
of September, 1981.
/L' may,.
VINCENT O'REILLY~1 R
ATTEST:
J• t tJhelan, City Clerk
ITaS.:s-"- -
P1A 1 \ TRIi[:'1' LuOP
' I .
a riling l , ALASKA
BID SII;SPIARY
A1'TAC}iF1ENT A
~~ ~ M ~ r
Basic Bid -Main Street Loop/Barnacle Way
- tdest of Willow Att ust 31 1581 iloyle
Constr.
- Spruce
Constr. Quality
Asphalt
Schedule A tdater Systems 1w4,718.19 53,190,50 150,81b,0
Schedule B Sanitary Sewer Systems 119,036,71 11 ,752. G0 20,464.5
schedule C Storm Drain Systems 11u,235.45 08,288.00 97,315.0
Schedule D Streer T,,,Nrovements 329,126.41 50,20u.5G 00,249.00 407,287 ,00 04,200.50
Schedule E Electrical Improvements 99,128.26 94,220.50 95,770.00 103,650.50 01,750.00
Schedule F Sidewalk 35,Ou2.s0 34,440.00 34,000.00 35,689.00 36,190.00
Schedule G Landscaping 59,047.90 74,525.00 23,085.0 113,700.50 116,650.00
ADDITIVE ALTERNATE 1-Main Street Loop
_~ .,,,, _
~~hedule C-AAI Stow.: Drain Systems 52,x60.00 49,323,0 53,742.0 53,235.0 58,551.0
Schedule D-AII Street Improvements 187,027.35 187,972.7 182,775.0 234,040.4 236,387,0
Schedule E-AAI Electrical Improvements
METHOD OF AWARD
Schedules A, B, C, D, or 709 116 6 2 0 7 $ 8 5 3 -
Schedules A, B, C, D, G, or 768 164.6 797.962.0 791 929.5 907 272.3 898 894.0
Schedules A, B, C, D, F, G, or 803,227.16 832,402.0 826,529.5 942,961.3 935,084.6
Schedules A, B, C, D, E, F, G, or 902,55.3 926,6L2.5 922,299.5 ,046,611.8 ,036,834.0
Schedules A, B, C, D, C, F, G, C-AAI, D-AAI, or ,141,842.7 ,163,918.2 1,158,816.5 1,333,887.2 1,331,772.0
Schedules A, B, C, D, F., F, G, C-AAI, D-AAI, E-AAI .183,399.9 ,205,447,2 ,206,856.5 1,377,488.2 1,372,622.0
/~
eoxe3, $p~ppTW.ALM.XA~Y3GEa9 CONSULTING ENGINEER ,9o~,<8~-45z~
~~~~ ~ •~•
August 28, 1981
Keith Kornelis
Public Works Director
City of Kenai
Bax 580
Kenai, Alaska 99611
Subject: Lawton, Tinker, Walker, Rogers
Keith:
We have checked all bids and corrected any extension a~ addition
errors. Zhe bids are in order and a bid tabulation is attached.
Quality Asphalt Paving submitted the low Basic bid of $616,199.50.
Quality is also low bidder on combined Basic + Alternate #1 at
$928,1w7.o5 and Basic + Alternate #1 and 2 dt $1,226,873.80.
We recam~ci award of contract to Quality Asphalt Paving as the
lowest responsible bidder.