HomeMy WebLinkAboutRESOLUTION 1989-39Suggested by: Administration
CITY OF KENAI
RESOLUTION NO. 89-39
A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA, AWARDING
A CONTRACT TO WINCE. CORTNELL.' BRYSON FOR PROJECT,CONSTRUCTION
MANAGEMENT, COORDINATION, AND INSPECTION SERVICES FOR A NOT-TO-
EXCEED AMOUNT OF $29,800 AND" TO MCH~_&_AssoCIAT~.S."FOR'PROJECT
DESIGN REVIEW, SURVEYING, QUANTITY COMPUTATIONS, QUALITY CONTROL
AND TESTING FOR A NOT-TO-EXCEED AMOUNT OF $34,308 FOR THE PROJECT
ENTITILED TIP SUBDIVISION S_TREtT.IM_P_ROVENRNTS~
WHEREAS, the City of Kenai
Wince, Corthe11, Bryson and
and
received the attached proposals from
McLane and Associates for this work~
WHEREAS, the award includes design review, project construction
management, coordination, quality control, surveying, testing,
quantity computations, and inspection servicesl and
WHEREAS, sufficient funds are appropriated; and
WHEREAS,
interest
Corthe11,
the Kenai City Council feels that it is in the best
o£ the City of Kenai to award this contract to Wince,
Bryson and Mchane and Associates.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF KENAI,
ALASKA, that a contract be awarded to Wince. Corthe11, B~vsgn-'for
Project Construction Management, Coordination, and Inspection
Services for a not-to-exceed amount of $29,800 and to MoLane.
Associate~ for Pro~ect Design Review, Surveying, Quantity
computations, Quality control, and Testing for a not-to-exceed
amount o£ $3~,308.
PASSED BY THE -COUNCIL OF THE-CITY OF KENAI, -ALASKA-,- this'3rd day
of May 1989. ,
Ja~t Ruotsala-, City Clerk
Approved by Finance: ~
Written by-'Public Works:
e IATEI
April 20, 1989
M&A 89-4007B
Mr. Keith Kornelis, Director
Public Works Department
City of Kenai
210 Fidalgo St.
Kenai, Alaska 99611
VIP SUBDIVISION STREET IMPROVEMENTS
CONSTRUCTION PHASE CONSULTANT SERVICES
Dear Keith:
McLane and Associates is requesting that the Cify of Kenai
consider a joint proposal from our firm and Wince Corthel Bryson
to provide consultant services on the above mentioned project.
We have reviewed anticipated work loads and schedules for both
firms in the upcoming construction season. A joint effort will
provide project staffing by well qualified local personnel who
have permanent positions with the firms.
Specific services are as follows:
Wince Corthel Bryson:
Contract Administration
Construction Inspection
McLane and Associates:
Construction Surveying and Quantity
Computations
Quality Control and Material Testing
The City will be required to execute two contracts for services
on the project utilizing this method. Benefits to the City
include elimination of the normal cost plus percentage manner of
charging for subcontract services and that each firm will
provide the required liability insurance resulting in twice the
coverage for professional liabilty. We feel that this is a cost
effective approach for the project. A few years back, street
improvements in Valhalla Subdivision were done this way with
satisfactory results for the City.
p.O. BOX 4B8 IEIO OTNA, AK t 11 1 it 9 I07-2EI ,21EI
Page 2
VIP Subdivision Street Imp.
Detailed proposals from each firm are attached. Manpower
requirements, key personnel and cost estimates are shown.
Should you have any questions on the concept or the individual
proposals, please contact Sam McLane at 283-4218 or Phil Bryson
at 283-4672.
Thankyou for the opportunity to submit this proposal.
Sincerely,
S. A. McLane
encl
14 Z NC:E-CORTHELL.-BRYBON
CONBUL.T ]:NB ENBZNEE~
P.O. BI:IX 104:1~ KEN;:IZ~
City of Nenai
410 Fidal9o Street
Kenai~ Alaska 99611
Attnm Jac~k Lashot:~ P.E.
April 13~ 1989
Subject= Proposa! for~ Construction Hanagement Services
1988 Street Ir~ppovemsnts- V.I.P. EarthWork and Paving
We have been requested by the Ppo3ect Design f'irm, HcLane and
Associates, to submit a joint pPoposal with them for the Subject
Project in which we would provide Hanal]ement and Inspection
Services, and HcLanes would provide 8urvey~ Hatepials TestinB~
Volume Determir~tions, Pre-construction Work ~ith Utility Owneps~
and Final Record Drawings.
to HcLanes generally providing Sect ion 3. 05, and
corpesponcl;
W.C.'B. the
It is cup intention to have ~laek Blanning and
provide the In,peet ion and Project Hanage=ent
Contractor act ivit is= dictate.
Casey Hadden
Services as
the following Engineering
We estimate that
~e=e~sapy -to adequately"inEpect the Subject' Ppo3ect =
Services will be
We ~'urthee e~tiMate 1:hat the above listed
costs distributed am follow=~
#ill have
PHASE COST
Bags Bid ~41,300
Alt. I 3, 000
Alt. 4 4, 000
Alt. 3 500
Alt. 4 1,000
..be~ng.~ 'Bid ',during the 8p~g. of 1989, ~n.an 'amoun~ no~ to-,
the. C~y:.. : "..
Ne' ~ p~oPO~e . ~o' p~ovtd· .'~he~e. '~e~vi'eeS in". _a~e°~d'aflee . W~h .OU~
If' you have any quest:ions,
ear1 iest" COnvenience, -
~_N~ .~., _E-CORTHELL-BRYBON
Philip W. Bry~ot,'~ P.E.
please Contact'ou~'Office.' at
your . ..
Enell 1989 Ra~es and Charges
GCHEDULE.OF
.. CONGULTXN8 ENGXNEERB "
BOX. 1041.
,...Kenai~ · Alaska 99611
.V,:I, P, Ea~h~oek and PavinD
RATE8 AND'CHaRGES- FOR ENGINEERING
EFFECTIVE 3ANUARY 1~ 1989
Pro3ect
SERVICES
PERSONNEL TYPE
RATES PER HOUR
Engineep VI I
Engineer VI
Engineep V
Dt-aftsman or CAD Operator
Typist (Reports and Gpecifications Only)
Computer-Aided Draft inD (In addition to Operator~)
$75. O0
65. O0
50. O0
35. O0
3a. O0
$15. O0
SUBCONSULTANTS
Subconsultants-shall
ADDITIONAL-CHaRGES
be charged at their- billiv~B Pates plus 10 %
Automobile travel at the ware of $0. 35 pet- mile travel led.
Actual, cost of airlines, charte~, train, bus or cab
auto rental-.
l~tual '=os~ of subsis~en~e_.and' lodging, .
~eei.~h~ e~ppess ~a~ges and postage Other than
~onsU I rant s.
Bluel ine copies, at $0. 35: pe~, S. F.
Xerox ~opie~ at $0.10 pep 8h~.
Nylae copies a~ $3.00 pe~
To the total amount
percent (10~() shal
COSt E~. ' '
be added. ~ow admtntstrat ion and overhead.
Engineering classi~ica.tionS sho~n co~resp°nd to ASCE g-ades
ONAL ENGINEEI~, 5URVEYORS & PLANNERS
~&A 89-4007C
Proposal for Consultant Services
VIP SUBDIVISION STREET IHPROVENTS
Const~¢tio~ Surye¥ing*
Tasks:
A)
B)
C)
D)
E)
F)
Clearing Limits
Slope Stakes
Excavation Cross Sections
Grade Stakes (Type III)
Subbase Stakes (Type I)
Finish Stakes (D-I)
Anticipated crew hours required:
CF3 Three man crew
CF2 Two man crew
CF1 One man crew
* AS 36.05.30 prevailing wage rates
70 hrs
140 hfs
8 hfs
apply
Quantity computations
Tasks: A)
B)
C)
Original ground sections
Excavation volume by neat line template
Excavation volume by after ex cross section
Anticipated personnel hours required:
CT computer technician 42 hfs
Micro-computer** 30 hfs
** Computer system time charged only when used with
ESP 200 engineering software.
Pacsoft
quality Control and Materials Testing
Soils:
U9 ASTM D 155
U1 ASTM C 136
U38 ASTM D 2922
U4 ATM T-4
Compaction Standard
Combined Sieve Analysis
Field Compaction (nuclear)
Fracture Count
BOX 4CB SOLOOTNA, AK
Page 2
VIP Subdivision
Aspha 1 t:
UA2 ASTM D 2172
UA15 ASTM D 4125
UA4 ASTM D 1559
UA7 ASTM D 2950
UA9 ASTM D 3549
Key Personnel
Bitumin Content
Bitumin Content (nuclear)
Marshall Series
Density of Bit. Paving (nuclear)
Thickness (coring)
Project administration:
Construction Surveying:
Quantity Computations:
QC & Material Testing:
Estimated Cost
Sam McLane
Stanley S. McLane, PLS
Glenn E. Tinker, PLS
Michael Johnson
Mary Toll
McLane and Associates will provide the personnel and equipment
necessary to accomplish the above described tasks for a fee not
to exceed $ 34,308.00. Personnel time and material testing will
be charged in accordance with the attached rate schedule.
Mc.Lane and Associates
Date: ~
~IAllB
Technical Feroo~el, Survey Crew & Specialized
Equtpmen~,, Fee Scheduleqo.. K. FFE_CTXVB_ !/~/89.. .
Descr!p~ton. __ ~' - Fer Hour - . Fe~ Hour. ........
:er
(-eer
Tech~e~n X
Draf )erson
ClertcaX
SURVEY ~XELD CRE~S, $~ANDARD
,00 39,00
. .St_raLshc ___· _Overt~me
X~,CL.O. DSS STA~D,ARD EQUXP_~H_ T C_r_ev ~ _ ..... Crev __ -' ~au .
Chte~ of ~arCies (~l, FIO) ............. ~0._0,0 ................. 6~..-00
Field c'~e~. '~-Fe~'s_~_-. ' ::.,(z~2', ' ~ '~o) ~ '-'- 88,00 44,00 _ ' - IX'0,00 55;00
Fietd cre~,: 3,-~e~5_~.'-: ' (F3, :- 17~o):- :-x~'7;'o5" 3-9.'~5' :::: -- :x$~-*0o-:-:--53,o0 --
SURVEY FXELD CP~I~S, TITLii 36* '
(*~hen Applicable) Scraish__~ _ _ 0verc.Lm_e__
!H. CLUDE, S STAHD.A~D, .EOU_X~_ _ C:r_~_~::.. t4an _- ......... _Crew ~- . Nan_ _
?ield, Crew,, ,,1,-F, ers,on., __ (CFX,_ .. CF01): ......,. _S..5.,.0.0 ..........73.00 _
Field Crew, 2-Fete. sm .. .~C~2.,_: cF02) .... 1fo,0_0_ :: _- :5~ . 00 ._ ........ 138.001-..'~9.00"
Fiel;d Cr~w° 3?ersatZ-' '- '- -(CF3,: C~)3):-. :'_ :_ ~62.00 : _S&..00 .... 20_~;.00. -68.00 :
F!.eld: Ct_er° '~' Fer:8'o~ ' ' ' ,{~c~b.p_: _C_F04)_ _ --- 2tp::00 ._:: -$3..00 .......... 268.00_ ::67,00
~,XCSO-COm~ERS,
Ena~__n_.eezins/Drafc~_a ApplteaCione 12,50 per Hour ...........
~ord ~roCess.~ni ' S":~ead Sheets- ...... ~"' :~' b','0'0 - ;at-'Hour" : -
.SUtF.L,,E~H_?A~Y XHF0 _B~AT_X0H
The hourly races are portal Co portal from HcL~e and AooociaCe~, located aC HtXe
Kena~ Spur H~shvay, ·
theodolites, eXecCroni= measur~n8 equt~en~, curs-levels and Hobfle ~'Radtoe. Other
available equt~enC nsc included ~n Chess hourly races are XtoC~ on the
SquLpuenc Fe_~ Schedule_,
Transpor~aCim and subsistence while avay from Kenat whm nsc provided by the elieut,
are billed aC the a~CuaX cooc plus ten Percent (X0Z) overhead. The above races are
accordance vtCh the DeparCmena of Labor requir~Co as per '~ .36.05.0~0 and 'AS 36,0S,030,
Above races inelude insurance eoverase with ~C8 of General
and ~rofeootonaX Liability to $25p,000,00. Ce~fleaCe of Xnbur~ee prov~d~ upon
P. Ch19OX4~SB [3C3LI3C3'r~I~:AKO~SeB OO7-~83-d~18 .:.
HcLane and Associates
Laboratory Fee Snhedule (effective 1/1/09)
~.ABORATORY & FIE~D..T£ST_~II~TH~O,D,.S_EOR SO_ILS
PRICE APPL'ICABLE
CODE __ STANDARDS
TEST DESCR I PT I ON
Ul ASTN C-138
D-II4O
C-Ii7
U2 AST# D-422
U3 AT#
U4 AT# T-4
US
U6
U7
U8
U6
Uti
Ut2
UI3
UI4
U35
U36
U39
NDR
ASTIr D-422
AST# i)-422
ASTfl D-2467
D-2466
D-2216
ASTH D-2216
ASTfl C-127
ASTH C-126
AST# D-a316
AASHTO T9O-gi
ASTfl D-2974
AT# T-J3
AST# D*1657
ASTH D-2022
D-2167
D-i566
ASTfl D-2022
D-2167
D-1656
AST# D-2622
Cosblned Coarse and Fine Sieve
Analysis, unshed
Coarse Sieve Analysis, unvaehed
Fracture Count, plus 14 Sieve
flaterlal
Fracture Count, plus lie Sieve
flaterJal
Hydroleter (30 lin. frost ciasa.)
Hydroleter (full 24 hour readings)
Visual Soil Class., SaBple Grouping,
#oisture Content, Dry Strength
Holsture Content only
Specific Gravity & Absorption
(Coarse Aggregate)
Speaifio Gravity &Absorption
(Pine Aggregate)
Liquid Lisit, Plastic Ltllt,
Plasticity Index
Organic Content of Soil by Lees on
Ignition
Degradation of Aggregates
Compaction Standard (floisture*
Density Relationship of Soils &
Soil Aggregate flixturea)
Field Compaction Test (by Nuclear
Densoneter, Rubber Balloon' or Sand
Cone Hethods) First i)enslty .
Field Coepactlon Test (by NuClear
DensometeT, Rubber Balloon or Sand
Cone Nethods) Add*l. Densities,
same trip '
Nuclear Densoleter Rental (in addition
to technician time)
UNIT
PRWC£ .
J 6O. OO.each.
40,00 each
20.00 each
3O. OO-mach
60.00 each
65.00 each
12.50 each
7.eOn ach
,45.Heach
160.60 each
GO. eOn ach
5O.60each
176.66 each
246.60 each
45.00 each
26.00 each
14.00 hour
HoLane and Associates
laboratory Fee Schedule (effeotive l/I/69)
ASPHALT. nUAI,!TY. CONTROL
Phi .... eST ' "
APPLICABLE T DESCRIPTION
CODE, STANDARDS., .
UAl
UAS
UA3
UAI5
UA4
UA5
UA6
ASTH'D-1666
ASTH D-2172
(flethod A)
ASTII D-2172
(bthod B)
ASTIt D-4126
ASTH D-1559
ATH T-t4
ASTIt D-3549
UAGA ASTfl D-3549
UA? ASTH 0-2950
UA8 ASTlID-2950
UA9 ASTH D-3649
Bltualnoue fils Design by Ibrshll
flethod
BltuaenContent Centrifuge Extrao-
tlon v/Gradatlen& Ash Correotlon
BltunenContent Reflux Extraotion
v/Gradation & Ash Correotion
BltuaenContent Nuolear Gauge
#lth Gradation
Harshall Haslnus Density, Stability,
Floe & Voids (3 lab coapaoted epee.)
Coating & Stripping of 9itueen-
Aggregate #lstures
Thieknese &Density of Coapaoted
Bituainous Paveeent by Coring flethod
(first teat)
Thickness & Density of Conpaeted
Bitunlnous Pavenent by Coring flethod
(add'l. tests, sane trip)
Density of Bltueinous Paveaent in plane
by the Ruolear flethod (first trip)
Density of 9itutinous Pavenent in plaoe
by the Nuolear xethod (add*l. tests,
saab trip)
Thiekness of Bltuninous Pavenent, Corinl
PRICE__ ........
41,766.60 eaoh
' 150.06 eaoh
· 14l. OI eaoh
leO.oo ,ash
16o,0o each
146.60 eaoh
166.60 eaeh
60.00 eaoh
35.00 each
46.60 eaoh
25.60 eaQh
12.00 inch
HeLAM and Associatel
laboratory Fee Schedule (effective 111189)
CONCRETE. QUALI.TY.COHTRO~
PRicE APPLICABLE ~£ST DE$CRIPT'I'oN
CODE. 'eTA#DA#PS
UCI, ASTIJ C-31
C*143
C*173
UC2 AST# C-31
UC3 AST# C-148
UC4 AS?# C-173
UCS AST# C-31
UC6 ASTH Co138
UC7 AST# c-3e
UC8 ASTII C-42
UCO ASTH Various
Field Cast O Cylinders, Test
SluBp, i Air Content
Field Cost O Cylinders only
Additional SlepT est
Additional Air Content
Extra Control Cylinders
Field Yield or Unit Veifht
Cure &Test Compressive Strenlth
of Cylinders, Cubes, Prises or Cores
Concrete Corinf (in addition to
technician tile)
Concrete #ix Deeifn (billed on Time &
aaterials and Unit Price combined)
45.00
16,00 each
IS. el each
IL00 each
20.00 each
lo, se each
12.00 IMh
Laboratory hours are 8:OO AH to 6:eO PR #onday throufh Friday. Overtlle testlnf, field or laboratory tests
porforlend outside reoular hours or on veekends viii be billed at 1,2S times the refulaf fate, Additional test
sentods not listed in this fee schedule viii be billed on STies and #aterlals basis.