Loading...
HomeMy WebLinkAboutRESOLUTION 1987-18Suggested by: Administration CITY OFKBJfl~ IBBOhUT2:ONMO, $7-$8 A ~SOL~TZON OF T~ CO~CZL OF T~E CZTY OF ~AZ, AW~J~DZNG A CO--CT FOR ~GI~ZNG DBSZGN ~Z~, CONS~UCTZON ~AG~, C~ATZON, 8~ZNG, ~ ~8PECTZON S~VZCB8 Hl~ TA~IAI~, P.E. FOR ~ PR~BCT ~ZTL~ '~ZUBS~, BASIN VZ~, ~S, B~~, ~ ~GLBR DRX~" FOR A ~0~ OF 844,310. ~S, ~he C$~y o~ Kena~ Fe~eSved p~o~sals ~Fom ~he ~ollowSng ~$m on ApF~1 7, 1987: HSke T~uriaSnen, HcL~e and Asooc~ation8, Inc. ~nce-Cor th,~l 1-Bryson ~S, ~he ~,~lic Works Depar~ent ~eels that it is in the best ~ntere~ ~ the C~ty sE Kenei to award this pro, eat to Hike Teu~einen, P.E.; and ~R~S, the award includee e design review end construction management, coordination, surveying, and inspection; ~d ~S, su~E~c~ent ~ds are appropriated. NOW, ~FO~, BE IT RESOLED BY ~g CO~CZL OF ~ Cl~ OF ~AI, ~S~, 2hat a contract be awarded ~or Engineering Des~ Review, Construction Management, Coordination, Surveying, InspectLon Services ~or ~he pro~ect entitled "Gul~ueeen, Basin View, ~es, Bar~ara, and ~gler Drive~ EoF · not-to-exee~ ~o~t o~ 844,310. PASSED BY ~E CO~CIL OF ~E CI~ OF ~AI, ~AS~, this 25th day sE April, 1~87. n, City Clerk rpp roved. by_ F.~9~nc.e.: ~ ~.tten Dy FUD~LC L. F' FROll ** DATE: CITY OF KENAI . Keith Korne'lie, Public Workp Director LaSher, City Engineer ~ April 10, 1987 SUBJECT: JABBA - PROPOSALS FOR A DESIGN REVIEW, CONSTRUCTION I~NAGEI~NT, INSPECTION, AND SURVKYZNG. The following engineers submitted proposals for the referenced project April 9th. Hike Tauriainen, P.E. Wm. J. Nelson & Associates Xchane & Associates Wince-Corthe11-Bryson $44,310 $45,540 $64,400 $82,s31 Included in the contract will be a design review and some modifications of plans and specs prepared by Oceantech. The extent of needed modifications is still unclear at this point, however, it is my opinion that this work is necessary after reviewing the plans and specs and consi=ering Oceantech*s previous work with the City. The wide spread in fees appears to be a result of each firms* opinion of the work necessary in the review phase, surveying, and differences in hourly fees. The hours figured for inspection of the project appears to be fairly close among the firms. Nike Tauriainen has submitted the lowest fee for the project, and considering that this firm has performed inspection (and redesign) for one of the past Oceantech projects (Cook Inlet View and Lilac) they should have some insight as to the problems to expect. I think everyone concerned should realize that the stipulated fee is very competitive and may not be adequate if problems unforseen at this point, either in design review or construction, should occur, The resolution of award will read Mike Tauriainen, P.E. A representative of this firm will be present at the April 15, 1987, Council meeting. JL/aw PROJECT\JABBA\INSPAWRD.MEM b b