RESOLUTION N0. 85-99
.. .
A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA,
AWARDING THE BID FOR 1985 CONTRACT SNOW REMOVAL FOR VIP
SUBDIVISION, EAST KENAI, AND BEAVER LOOP TO FOSTER CONSTRUCTION.
WHEREAS, the following bids were received for the above services
on October 10, 1985.
BIDDER EQUIPMENT FLAT RATE HOURLY
RATE
Foster Construction Caterpillar 12 F $1,424.00 $ 75.00
Coonrod Construction Champion 565DT $1,470.00 $100.D0
DJ's Snow Removal Dodge 3/4 Ton Truck $1,000.00 $ 50.00
Dodge 1 Ton Truck
WHEREAS, the recommendation from the Public Works Department is
to award the bid to Foster Construction for the flat rate of
$1,424.00 per job or $75.00/hour as per specifications, and
WHEREAS, sufficient monies are available, and
WHEREAS, the Council of the City of Kenai has determined that
awarding this contract to Foster Construction for the flat rate
of $1,424.00 per job or $75.DD/hour as per specifications is in
the best interest of the City.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY nF
KENAI, ALASKA, that the bid for Contract Snow Removal - 1985 for
VIP Subdivision, East Kenai, and Beaver Loop be awarded to Foster
Construction for the flat rate of $1,424.00 per job or
$75.00/hour as per specifications.
PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, this 16th day
of October, 1985.
~~(~a
TO , 0
ATTEST:
e elan, Ci y Cler
Approved by Finance: z q
Authorized by PW:
r
~..~ -- ...:.rte:
_- ---__
CITY OF KENAI
~, "Oil G'a~o~l o~ ~~~„
_ _ 210 FIDALQO KENAI, ALASKA 1Ha811
TELEPHONE283-7536
MEMORANDUM
T0: Keith Kornelis, PW Director
FROM: Jack La Shot, City Engineer ~~
DATE: October 10, 1985
SUBJECT: SNOW REMOVAL
The following bids were received October 10, 1985:
BIDDER EQUIPMENT FLAT RATE HOURLY
RATE
foster Construction Caterpillar 12 F $1,424.00 $75.00
Coonrod Construction Champion 565DT $1,470.00 $100.00
DJ's Snow Removal Bodge 3/4 Ton Truck $1,000.00 $50.00
Dodge 1 Ton Truck
The Iow bidder, DJ's Snow Removal, proposes to use 4-wheel drive
pickup trucks with blade attachments. Mark Johansen, Street
Foreman, and I recommend that this bid not be accepted for the
following reasons.
1. It is doubtful whether snow could be removed to the width
needed without help from the City. The City would have to
"wing-back" snow berms periodically during the winter,
offsetting any cost savings.
2. The low bidder says to adequately remove the snow he wo~~ld
have to travel 20 mph at all times. This would cause a
safety hazard in residential areas, especially at
intersections.
3. This method would permit snow and ice to build up on the
streets more rapidly than graders.
4. Generally, I don't think as good s job can be done using
this method.
The specifications allow the City some discretion in the award of
the bid regarding the type of equipment to be used.
JL/sw
~,