Loading...
HomeMy WebLinkAboutRESOLUTION 1984-06~, ^ r Suggested by: Adm~niettration CITY OF KENAI RESOLUTION N0. 84-6 A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA, AWARDING A CONTRACT FOR THE DESIGN AND PREPARATION OF PLANS AND SPECIFICATIJNS FOR THE LIBRARY EXPANSION AND EXPANSION AND RENOVATION OF THE POLICE DEPARTMENT TO CARMEN V. GINTOLI, ARCHITECT. WHEREAS, the following proposals were submitted: FIRM 1. Lane ~ Knorr do Plunkett 2. Carmen Gintoli, Architect 3. S A S Engineers, Inc. PAVA Design, Inc. Fryer Pressley Engineering, Inc. WHEREAS, funds are available, and WHEREAS, the recommendation from the Public Works Department and the Police Department is to award one contract to Carmen V. Gintoli, Architect for both projects, and NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, that Carmen V. Gintoli, Architect be awarded one contract for the Architect/Engineer Design and Preparation of Contract Plans and Specifications on the Library Expansion and Police Station Renovation and Expansion for the lump sum of $71,424. PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, this 18th day of January, 1984. R ATTEST: ~ /+ ane a an, i y ler Approved by Finance: t ~-r The third proposal submitted is frorn a group of firms, of which, S A S Engineers, Isic. has an office in Sold atna. This group could provide a local project manager. All things considered, Carmen Gintoli. is my recommendation for a contract to design both projects. With a combined contract, the City could reduce administrative duties and save money on the entire contract. I will point out some of the possible combinations: 1. Entire Design Contract to Gintoli: $~71 424 Add Contract Administration: 14,500* Total A/E Services - Both Contracts: $ 85,924 (lowest) 2. Library Design to LKP: $ 53,750 Police Dept. Design to Gintoli: 35,500 Total Design: $ 89,250 (+$17,826) 3. Library Contract Admin. to LKP: $ 34,250* Police Dept. Contract Admin. Gintoli: 6,900* Total Contract Admin. 41,150 (+$26,650) Total A/E Services $130,400 (+$44,476) Entire Design Contract to LKP: Add C t t Ad i $101 000 (+$29,576) on rac m n. S Total $153,500 (+$67,576) *Contract Administration is based upon funding being obtained this summer. JL/jet ccs Mayor and Council of the City of Kenai Wm. J. Brighton, City Manager Gintoli Lane b Knorr ~ Plurkett DESIGN INSPECTION DESIGN INSPECTION Police $35,500 $ 6,y00 $ 56,000 $35,000 Library 38,900 7,600 53,750 34,250 Sub Total w/discount 71,424 14,500 101,000 52,500 Grand Total $85,924 $153,500 i r ,-. .-~ C13'Y OF KENAI -. O. LOX St0 KENAI, ALASKA 99~I1 -- TEtE-NONE Z{~ • 7335 January 12, 1984 T0: Keith Kornelis, Director of Public Works FROM: Jack La Shot, City Engineer SUBJECT: Architect Selection for Library and Police Department Projects The City received the following three proposals for Architect/Engineer Services for the referenced projects. 1. Lane do Knorr ~ Plunkett 2. Carmen Gintoli, Architect 3. S do S Engineers, Inc. PAVA Design, Inc. Fryer Pressley EnginEering, Inc. The Mayor and all Council Members should have copies in their packets. The firm of Lane ~ Knorr do Plunkett offers two major advantages: 1. They are familiar with the existing buildings of both projects. 2. They are a very experienced firm. To select Carmen Gintoli, Architect would offer the following advantages. 1. A local firm that has a proven track record with the City. 2. Availability and responsiveness. 3. He has been involved in schematics preparation of both projects and is somewhat familiar with both. 4. A substantial cost savings, especially during construction.