Loading...
HomeMy WebLinkAboutRESOLUTION 1983-134Suggested by: Administration CITY OF KENAI RESOLUTION NO. 83-134 A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA, AWARDING A CONTRACT FOR PROJECT MANAGEMENT, COORDINATION, SURVEYING, TESTING, AND ENGINEERING INSPECTION SERVICES TO PROFESSIONAL DESIGN ASSOCIATES ON THE TWO PROJECTS ENTITLED: 1) KENAI AIRPORT PARKING LOT IMPROVEMENTS AND 2) KENAI MUNICIPAL AIRPORT RAMP OVERLAY AND ITINERANT AIRCRAFT PARKING FOR NOT -TO -EXCEED AMOUNTS OF 1)$39,066.80 and 2) $39,837.68 RESPECTIVELY. WHEREAS, the City of Kenai received proposals from Professional Design Associates and Mike Tauriainen, P.E., and WHEREAS, Professional Design Associates and Mike Tauriainen, P.E. are the engineering firms that worked on the design phase of - these two projects and may be somewhat more familiar with these projects, and WHEREAS, the Public Works Department and the Council of the City of Kenai feel that it is in the best interest of the City of Kenai to award this contract to Professional Design Associates, and WHEREAS, sufficient funds have been appropriated. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, that a contract be awarded to Professional Design Associates for Project Management, Coordination, Surveying, Testing, and Engineering Inspection Services on the two projects entitled, 1) Kenai Airport Parking Lot Improvements and 2) Kenai Municipal Airport Ramp Overlay and Itinerant Aircraft Parking for not -to -exceed amounts of 1) $39,066.80 and 2) $39,837.68 respectively subject to approval by FAA. PASSED BY THE COUNCIL OF THE CITY KENAI, ALASKA, this 21st day of September, 1983. RON LD A. MALSTON, MAYOR ATTEST: ' Jallet Whelan, City Clerk - = ipproved by Finance: R '.�FRs'J'--.act .3= j•,t?Mki i.j. • . � rT., . PROFESSIONAL OESIGN ASSOCIATES KENAI PROFESSIONAL BUILDING 255 WILLOW STREET, SUITE 201 MAILING ADDRESS P. O. BOX 4406. KENAI, ALASKA 9%11 TELEPHONE (907) 283 5024 September 15, 1983 Department of Public Works City of Kenai P. O. Box 580 Kenai, Alaska 99611 Attention: Mr. Keith Kornelis, P.E. Director Reference: Proposal for Professional Services Kenai Airport Projects Dear Keith: Professional Design Associates (PDT,) is pleased to submit the following proposal to provide professional services for contract administration of the Kenai Airport Vehicle Parking and the Kenai -Airport Ramp Overlay and Itinerant Aircraft Parking Projects. The proposed projects are well within our company capabilities. We feel that the firm is particularly qualified for this project having accomplished the design portion of the Kenai Airport Vehicle Parking project and we specialize in projects j of this nature. As per your request, the proposal is structured and pre- sented as follows: o Proposed Scope of Work o Proposed Fee Breakdown o Fee Schedule o !resumes of Key Individuals PDA welcomes the opportunity to submit this proposal. If there are any questions please do not hesitate to call on us. Sincerely, i L Jr y J. vers, P.E. Principal W S:kmc E .. t,. ..--•:.-+y: L-'w•ry'. �l1: 4fAG•L'.{�h'M'.h •. iy li � I .5 "F I7` ! r +i:. �. - ,:y: i�:,�.r,.hc�:�A;c•#=•i•.: :r�N' .f:;..?'L•,�� :'ti =!-ti%^,ti:h, w�M•: PROPOSED SCOPE OF SERVICES The project requires the complete contract administration, and inspection for the construction of the Kenai Municipal Airport Vehicle Parking Lots and the Kenai Municipal Airport Ramp Overlay and Itinerant Parking. The construction office will be locazed in our company office at the Kenai Professional Building approximately four(4) blocks from the project area. PDA will provide competant personnel to perform the required functions of the project. Gaiy J. Silvers, P.E. is designated project manager with Chuck Swenor, C.E.T. as project inspector. Tony S. Brown will be available for inspection relief. Additional staff is available should project conditions dictate. We propose to accomplish the project monitoring on a standard five(5) day, 40 hour work week. On site materials testing -will be accomplished as the project dictates. For densities and compaction it is proposed to utilize our inhouse nuclear densometer. Random gradation tests will be accomplished for borrow material both in place and at the source. We propose that the City authorize at least one(1) week ad- vance time to set up the project records system. EXCEPTIONS TO THE PROPOSAL Double shifting of the contractors work force and the occurance of a failure in the field is not included in this proposed Scope of work. If they occur, a revised scope of work will be required. 9 PROPOSED TASK OUTLI14E MJD RELATED FEES Task 1, Project Start -UPL_Attend Pre Construction Meetin Project Manager ig man Day $269:92 Inspector � Man Day 192.80 Geologist h Man Day 269.92 Clerical 2 Man Day 578.16 Subtotal $1,310.80 Task 2. Perform Project Management Provide Construction inspection, soils testing, project surveying, project monitoring, maintain for a 90 day construction contract(s). project records Project Manager 16 Nan Day $8, 637.44 Electrical Inspector 5 Man Day 3, 000. 00 Resident Inspector 65 Man Day 25,064.00 Geologist 10 Man Day 5,398.40 Geotechnical Engineer 15 Man Day 6,940.80 Computations 5 Man Day 3,320.00 Clerical 4 Kan Day 770,88 Subtotal $53,131.52