HomeMy WebLinkAboutRESOLUTION 1982-031CITY OF KENAI
RESOLUTION NO. 82-31
A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA,
ACCEPTING A GRANT FROM THE STATE OF ALASKA, DEPARTMENT OF
ENVIRONMENTAL CONSERVATION, IN THE AMOUNT OF $105,565 FOR
THE CONSTRUCTION OF FIRST, BIRCH, AND FOURTH STREETS WATER
AND SEWER.
WHEREAS, the State of Alaska has offered the City of Kenai
a grant for $105,565 for the construction of water and sewer
improvements on First, Birch, and Fourth Streets, and
WHEREAS, the City of Kenai agrees to accept the responsibility
- to operate and maintain the proposed water and sewer improvements
and agrees to the terms and conditions of the grant offer, and
WHEREAS, this grant offer must be formally accepted by the
City of Kenai.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
KENAI, ALASKA, that this grant in the amount of $105,565
from the State of Alaska is hereby accepted for the construction
of First, Birch, Fourth Streets Water and Sewer.
PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, this 7th "
day of April, 1982.
_VINCENT OIREII,Le:,�OR
}
ATTEST:
J t Whelan, City Clerk
'; Approved by Finance:_
F
JAY NAMUR, oavMOR
DEPT. OF ENVIRONMENTAL CONSERVATION
Poaaio - Jiff" MY
February 25, 1982
Mr. William Brighton
City Manager
City of Kenai
Box 580 1�8z
Kenai, AK 99611 r.: c " +crr�T�i•r�
Dear kr. Brighton:
State Grant Offer: First, Birch & Fourth Streets Water & Sewer
In accordance with AS 46.03.030, the Department of Environmental Conservation
offers the City of Kenai a grant of State funds, not to exceed $105,565, to
be applied toward the financing of approximately 685 feet of 6-inch water line
and 1370 feet of 8-inch asbestos concrete sewer, along with numerous taps
for service laterals on Birch and Fourth Streets. This will be carried out
in conjunction with street improvements and storm drainage on First, Birch,
and Fourth Streets.
This grant offer represents fifty percent (50%) of estimated non -federally
funded eligible costs of $211,130.
This offer is expressly conditioned upon the terms and limitations contained
herein, and in 18 AAC 73, and is based upon the estimated eligible project
costs as itemized below:
1. Administrative Expenses
2. Legal Expenses
3. Engineering Design Fees
4. Project Inspection and Surveying
5. Construction
6. Equipment
7. Other
8.
9.
10. Project Contingencies
Total Estimated Eligible
Project Costs
-0-
-0-
2,300
20,480
179,350
-0-
-0-
-0-
-0-
9,000
N
Mr. William Brighton
Page 2
February 25, 1982
11. Total Estimated Eligible Costs 211,130
12. Less: Federal Financing -0-
13. Estimated Non -Federal Eligible Costs 211,130
14. State Grant = 50% of Line 13 105,565
Adjustment of expenditures within the budgeted cost items is allowed,
however, if actual project costs exceed the total estimated eligible
costs, a revised grant application must be submitted before additional
funding can be committed. If actual project costs are less than the
estimated costs, the grant will be reduced to the extent necessary to
comply with the percentage limitation set forth in this offer. Grant
payments. will be made in accordance with the enclosed payment schedule.
All requests for payment must be submitted on the enclosed "Request for
Payment" form.
By accepting this grant offer the City of Kenai agrees to comply with
the procedures and requirements contained in the Construction Grants
Regulations (18 AAC 73, appended) as well as the following general and
special grant conditions.
GENERAL GRANT CONDITIONS
1) Plan Approval
e grantee agrees to obtain plan and specification approval from the
Department in accordance with 18 AAC 73.020 prior to issuing a notice
to proceed with construction, to a contractor.
2) Contract Award & Contractor Bonding Requirements
a. The grantee agrees to bid construction contracts exceeding
$50,000. Adequate time, not less than 30 days, shall be
allowed between the date of formal advertisement and the date
the bids must be submitted. The grantee agrees that any
contract awarded will be to the lowest responsive responsible.
bidder.
b. The grantee agrees to submit procedures for award of construction
contracts of less than $50,000, to the Department for prior
approval when means other than the competitive bidding process
are proposed.
c. The grantee must require the contractor to furnish performance
and payment bonds in accordance with AS 36.25.010.
d. If local or federal ordinances or regulations also apply to
the contract award or contractor bonding requirements for this
project, the most stringent requirements shall apply.
- e. The grantee agrees to provide ADEC with a summary of itemized
bid tabulations, a copy of the Notice to Proceed, and a copy
of the construction contract.
rO
Mr. William Brighton
Page 3
February 25, 1982
3) Change Orders
The grantee agrees that all project change orders will be submitted
to the Department for approval in accordance with 18 AAC 73.020(e).
4) Project Completion
e grantee agrees to provide sufficient local funding to match
State and federal grant assistance and to ensure the completion of
a properly functioning project, in accordance with 18 AAC 73.020 {j).
5) 0 eration and Maintenance
The grantee agrees to operate and maintain the completed project.
6) Titles and Easements
The grantee agrees to obtain all titles and easements necessary to
provide clear title or authority to construct and maintain the
proposed project.
7) Eligibility
The grantee acknowledges that disbursement of progress payments by
the State does not constitute acceptance of any item as an eligible
project cost until all project costs are audited and determined to
be eligible.
8) Inspection
The grantee agrees to allow State inspections of all project work
and audits of related records and data for which this grant is
offered, at any reasonable time.
9) Records
The -grantee agrees to maintain project accounts and records which
verify the grant eligibility of project expenditures. These
accounts and records shall be kept apart from non -grant -eligible
local records and from those records maintained for the purpose
of other State or federal grant programs involved in the project.
10) Progress Reports
e grantee agrees to submit periodic progress reports on the
proposed project with each payment request.
11) Subcontracts
The grantee agrees to submit project subcontracts over $10,000 and
all changes to these subcontracts for Departmental approval.
12) Damages
e grantee acknowledges that the State is serving only as a funding
source for this project and as such is to be held harmless by the
grantee from any claims or damages arising during or as a result
of this grant assisted project.
13) Municipal Bond
e municipal official having custody of the construction account
must be bonded as authorized in AS 29.23.520.
Mr. William Brighton
Page 4
February 25, 1982
14) Grant Cancellation
e grantee acknowledges the right of the State to rescind the grant
and seek recovery of payments already made on the proposed project
if the grant application is found to contain incorrect or misleading
information or if a condition contained herein, or in 18 AAC 73 is
violated.
SPECIAL GRANT CONDITIONS
None
Please carefully review this grant offer, the related grant conditions, and
the enclosed regulations. If satisfactory, sign and return the original
along with a formal resolution accepting the grant enacted by the Kenai
City Council.
In the resolution, the municipality must agree to accept responsibility
to operate and maintain the proposed water, sewerage or solid waste utility
improvement and agree to the terms and conditions of this grant offer.
Acceptance of the grant is required within six months to prevent revocation
of the offer. No progress payments can be made until the grant offer is
accepted. Nothing in this offer, whether or not accepted, may be deemed
to constitute a contractual obligation on the part of the State until a
resolution of acceptance has been submitted to the Department.
The City is to be congratulated on its effort to provide this important
community improvement.
4, Si nc
ueller
Commissioner
Enclosures
Accepted on behalf of the
Typed Name Title Date
Signature
by: