HomeMy WebLinkAboutRESOLUTION 1982-077J
A-.
CITY OF KENAI
RESOLUTION NO. 82 - 77
A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA, AWARDING A
CONTRACT FOR THE CONSTRUCTION OF THE RENOVATION AND EXPANSION OF THE
KENAI MUNICPAL AIRPORT TERMINAL BUILDING TO H. HALVORSON, INC.
WHEREAS, the following bids were received on July 29, 1982, for the
above referenced project:
CONTRACTOR
BASIC BID
AA2 - AA6
TOTAL BID
Wick Construction Company
$1,378,320
$3SS,800
$1,734,120
Strand, Inc.
1,377.000
510,497
1,887,497
Gwinn Construction Co.
1,460,827
263,383
1,724,210
Veco, Inc./Nana Constr.
1,673,000
298,300
1,971,300
Vern Hickel Construction
1,379,890
61S,938
1,995,828
H. Halvorson, Inc.
1,329,800
267,800
1,597,600
L. B. Anderson Constr.
1,552,000
336,000
1,888,000
Architect's Estimate
1,650,000
745,000
2,395,000
WHEREAS, Additive Alternate
No. 1 is included in Additive
Alternate
No. 2 and therefore not necessary if Additive Alternate
No. 2 is
chosen, and
WHEREAS, a description of Additive Alternates 2 through 6 follows:
AA2 - 30 additional feet to lobby, offices,and baggage. (This includes AA1)
AA3 - Toilet Addition to Lounge.
AA4 - Re -roof and re -insulate existing terminal.
AA5 - Cabinets and finishing to ticketing Lobby and airline offices.
AA6 - Baggage conveying system in ticketing area.
WHEREAS, the recommendation from the Architect, Carmen Gintoli, and the
Public Works Administration is to award a contract for the basic bid
plus Additive Alternates 2 through 6 for the total cost of $1,597,600
to H. Halvorson, Inc.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA,
that the contract for the construction of the Renovation and Expansion of
the Kenai Municipal Airport Terminal Building be awarded to H. Halvorson, Inc.
for the Basic Bid plus Additive Alternates 2 through 6 for the total cost of
$1,597,600.
PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALA , this 4th day of
August, 1982.
ATTEST:
-7 Al VIN0
Zet Whelan, City Clerk
roved by Finance: Ecia
carmen vincent gintoll, architect
box 4625 professional building suite 110
-7732
907283
11~~�������������
�
°U~°"v
���
�y�,��«~~
City of Kenai
Box 580
Kenai, 8K 99611
Attention Mr. Jack LwShut, City Engineer
RE Kenai Municipal Airport
Terminal Renovation and Expansion project
Qmmr Mr. LwShot
We have n**lmwed the
Bid Tabulation Form submitted this day for the
above referenced prpjeof. The apparent low bidder is H. Halvorson, Inc
whose bid tabulates
as follows:
Base Bid
$1,339,800
A|+ #2
105,500 30 additional feet to Lobby, Offices and Baggage.
(This Includes Additive Alt. #1)
Alt #3
54,000 Toilet, Addition to the Lounge
Alt #4
58,000 Re -roof and re -insulate existing terminal
8|+ #5
17,300 Cabne+s and finishing to ticketing Lobby
and airline mfflowy.
Alt #6,
35,000 Baggage conveying system In ticketing area.
TOTAL
$1,597,600
Their bid appears to
be In order, with all required attachments.
We feel the additional time required to complete the alternates Is warranted.
The project budget Is as follows: Construction $1,045,000
Contingency 108,612
TOTAL $1,753,612
By awarding the Base
Bid plus alternates 2 thru O- the contingency remaining
will be *150,012, or
approximately Ayercenf of ;the budget. We feet this Is
o
July 29 1982
C{ty of Kenai
page two
Our recommendation is to award the Base Bid plus Additive Alternates 2 thru
6 to H. Halvorson, Inc for the total amount of $1,597,600.
Should you require additional information, please do not hesitate in
calling.
Sincerely,
7rmen
n vincent gintoli, architect
V. Gin o{1
cvg/dbm
= 11
1.1.!L51 !II1',ICII•'.1. :.II<I•nl'1 I�.h'tl'.�I. 1:U11.UI'.t�
r.l
^I
hl.:rrl':1I Ire.': AN LXI'A';%Iri':
C0%JRACTOR
`
a
Itid tlpeniny! Date 9/82 at 2 P.M. r•nai City Ilan
leach member of a
,j
eJ
=
r
L)
Add 127S sf
Add ZSSn til
Add Stll sf
Insulate i,
Cabinetwirl,
Belt con•rer
-----_—
ioint venture mus
lace appropriate
o`
x
=
-1
J.
nets constr.
new constr.
Hera constr.
re roof exist,F,
finisheti
r,rs at
licenses and honJl
�-
_
^3
E
lndudesAta
I
6ni1.1ing,
to tiCtc•tin;
and jCirr:
tiCl(•tin{;
=
BASIC RID
AA
AA)
AA3
A,54
A�,
A;,6
TnTAt. (sift
Ck 8co1jiricfi
✓�
>
✓
✓
/ j7C,;�C',l-('
/l7,Gl.l;(!:
/j%'/GG,CG
1 ,000•.CC•
✓G,'/GG.GG
/% 4,,G',
C,t,(
Add !! days
Add ( day,
Add 6 days
Add U days
Add (, days
Add days
70.00
r
��rCr('.(!, 1/)�,
✓
J✓
rc
/37�CG4,[C
/(7�l'1.GC'
43 %.1l,GG
4/!•,�i�/,GC'
.'�,?Gl.lc•
?,/'//Sl/;
Add /Y days
Add w'/ day-
Add C. days
Add (' days
Add (. days
Add /: days
�rd
G<<'/nr)i'C/%5�r.
✓•�
✓n�
yt-', 7u'
�S�vS,cC
'fECS•CC
%'�,z3i,r_•c
�ii;000•C•r.
/yiii:c./
'/JCCC•Cr
nC.
Add lC days
Add .',(•day.
Add :'C days
Add (- days
Add (. days
Add & days
�'%��• 1/Q•GG
k
/
� c', � yC �
✓
✓
c. •
, 73, eclr, c(
5�lC o. c c
,
/iG, cc•o. l'c
S Gcc, lc
L� 1 �� , C c•
/5, 3cc, c c•
: Gu•. u
.1C
A14AA (7(-L . 7.t'.
Add G days
Add f day.
Add (• days
Add � days
Add (' days
Add days
�aV.�t,
r a IlIcke
✓
�.379,�>C,(C
Y,'i251.CC•
//// W, CC
G2,'C7y.(.(
34, 3X/,CC
ze,6•76"CC
�tr)s1r. C?o.
Add -,<' days
Add =C day
Add `(,• days
Add ?,Cdays
Add_(., days
Add _',C days
/, 99�, k-Z9,C'c
/V //,-,lvorscn
'20.C(.
-- �
L/
�91299CC,C(,
66�'/G'C.4 -'C
/G'S
•Jr'S;C'GG',UU
.>(,6GG,C-C
/7 3CC•.C.r•
Add_2( day-
Add iC day.
Add C' days
Add=C days
Add (_days
Add ( days
/iJad,00
c,.C•.cC.
/1/(�•(•./
%/�:�-::/(:
�l,cc•c•((•
,c.r...
—days
Add�days
Add
Addydays
Add days
Add day-
Add=days
��
•'/c;cu.cc
%. �
y� c •'/� l.c.
;;c./, ,,c,
i:�c l<<..-c,
�; �._'.r,C'a
<,flll'1C<�C
Add days
Add days
Add days
Add days
Add days
Add days