Loading...
HomeMy WebLinkAboutRESOLUTION 1982-109_s SUB ITUTE Suggested by: Administration 0 CITY OF KENAI RESOLUTION N0, 82-109 A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA, AWARDING A CONTRACT FOR THE DESIGN AND CONSTRUCTION OF THE KENAI RECREATION CENTER -- GYMNASIUM ADDITION TO BLAZY CONSTRUCTION FOR A TOTAL COST OF $699,200 INCLUDING ADD AI.T 1,3,4, 4 5 PLUS SOME NEGOTIATED CHANGES, ADDITIONS, AND/OR ALTERATIONS. PROPOSER BASIC ADD 1 ADD 2 ADD 3 ADD 4 ADD 5 Blazy Constr. $625,000 $57,000 $7,500 $77,500 $3,100 $3,500 (raise roof) 14,800 (equipment) Air Tek, Inc. $592,217 $15,000 $3,000 $309600 $3,000 $3,300 Timberline Ind. $621,739 $ 8,469 $29,800 $69,314 $4,986 $3,582 (equipment) 6,430 (striping) WHEREAS, Additive Alternate No. 1 is Additional Game Equipment, and WHEREAS, Additive Alternate No. 2 is Landscaping and Seeding, and WHEREAS, Additive Alternate No. 3 is Asphalt Paving, and WHEREAS, Additive Alternate No. 4 is Installation of Metal Fireplace, and WHEREAS, Additive Alternate No. 5 is Electronic Scoreboard, and WHEREAS, the following changes, additions, and/or alterations were negotiated with Blazy Construction and are recommended to be included by the Public Works Department and the Parks and Recreation Department: BID TOTAL BASIC $625,000 AA 1 $14,800 AA 2 $7,500 JAA 3 $77,500 AA 4 $3,100 AA 5 $3,500 1) Increase from R19 to R30 in wails + 2,800 2j Change from steel siding to wood - 9,000 3. Delete landscaping -7,500 4) Add screen around existing mechanical + 3,500 5) Remove 1st floor west entrance and add storage area - 28,200 6) Remove 2nd floor west entrance (contingent on fire marshall o.k. - 4,700 I RESOLUTION NO. 82-109 Page 2 BID TOTAL 7) Delete some of the PEE WEE basketball striping 81 Reduce slab from 6" to 4" 9 Eliminate curb & gutter except for entrances 10) Eliminate sidewalk on west wall of new construction 11) Add 3/4" plywood behind baskets and place hanging protection mat; 12) Double instead of single door for south entrance 13) Construct racquetball court - shell only --use presently for storage 14) Raise ceiling from 20' to 24' FINAL BID BASIC AA 1 AA 2 AA 3 AA 4 1 AA 5 -1,200 - 5,700 -23,000 - 3,400 +4,000 + 500 L,700 000 $17,600 0 $51,100 $3,100 $3,500 $623,900 WHEREAS, the recommendation from the Parks and Recreation Commission is to award the contract to Blazy Construction for a total project design/construction cost of $699,200 which would include the Basic Bid and Additive Alternates No. 1, 3, 4, and 5 plus some negotiated changes, additions, and/or alterations, and WHEREAS, Blazy Construction's total bid of $699,200 including Additive Alternates No. 1, 3, 4, and 5 plus some negotiated changes, additions, and/or alterations is in the best interest of the City of Kenai, and WHEREAS, sufficient funds are appropriated. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, that the contract for the Design and Construction of the Kenai Recreation Center --Gymnasium Addition be awarded to Blazy Construction, in the amount of $699,200 for the project design and construction cost which includes the Basic Bid and Additive Alternates No. 1, 3, 4, and 5 plus some negotiated changes, additions, and/or alterations. PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, this 6th day of October, 1982. ATTEST: BETT LI ICE -MY R get_ Jajot Whelan, City Clerk Approved by Finance: