CITY OF KENAI
RESOLUTION NO. 79-132
A RESOLUTIQN OF THE COUNCIL OF THE CIT'Y OF KENAI, ALASKA
AUTHORIZING THE ADMINISTRATION TO GO OUT FOR FORMAL BIDS
FOR A WARM STORAGE BUILDING.
WHEREAS, it has been determined that additional warm storage
is necessary due to the requisition of additional snow re~:oval
equipment, and
WHEREAS, the City has received informal proposals for the
construction of the Warm Storag~ Building, and
WHEREAS, the City is desirous of receiving formal bids.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY
OF RENAI, ALASKA that the Administration is hereby u::~horized
to proceed with obtaining formal bids to construct a Warm
Storage Building on the site of the present shop complex
and as per specifications as outlined in the letter of March 30,
1979 which is attached. •
PASSED BY THE COUNCIL OF THE CZTY KENAI, ALASKA this 19th
day of September. 1979. _ ~ _ ~ _, /
C
;~~
ATTE
,>,2 ~• \.~~,~~/.~~ :
ue C". Peter, City Clerk
,
. ~ ~ ~_ ~~ . . _ _ r ~.` _~ T._ /~~- T
~ LfTTE'R ~ ~
~
CITY OF KENAI
„a~ e~~ ~ ~~~„
r. O. iOX S/G KpJAI, AlASKA 9~i11
TQ.EPNOWE ~3 • 7535
Dear Sir:
As a follo~a up to our previous telc~,:~ne conversation, the City
of Kenai would like your company to submit a proposal for
construction of a warm storage building in our shop yard. Site
work other than foundation excavation at this location will be
minimal and need not be included in your proposal.
Dlinimum requirements are as follows:
1. S" concrete slab with 6 x 6#6/6 reinforcement
2. 60' x 100' steel building
3. 16' eave height
4. 3' girt @ ~aalls
S. 42" foundation - insulated and moisture protected
6. 4 ea. 14' x 14' overhead cargo doors - insulated
7. 2 ea. 3' x 7' steel personnel doors - insulated
8. lighting package'
9. 2 ea. 110V receptacles
10. natural gas heating package
11. 20 psf wind loading; seismic zone 4
12. 40 psf live loading
13. 4" fiberglass insulation with vapor barrier
24. factory applied, painted roof (white)
15. factory applied, painted wall (color)
16. 5-year guarante~e on roof construction
This project ~aill require complete construction dra~aings, stamped
by a registered Engineer/Architect licensed to practice Civil
Engineering/Architecture in the State of Alaska. Appropriate
bonding as well as project inspection will be rrquired.
After receipt o£ your proposal, the City of Kenai will be able to
appropriate money for this project and int~ite formal bids for same.
Thank you for your assistance.
Sincerely,
Bill :~elson, Cit~~ I:ngineer
BV/jet
~- -
rfarch 30, 1979