HomeMy WebLinkAboutRESOLUTION 1978-107~~
7 "~
~ '- ~ ~ ~
CITY OF KENAI
RESOLUTION N0. 78-107
A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA AiVARDING
THE CONTRACT FOR THE REPAIR OF CITY OF KENAI STREET LIGHTING TO
INLET INSTRUI~NTS AND CONTROLS.
j WHEREAS, the City of Kenai did approach three electrical contractors
for proposals to repair City of Kenai street lighting, and
WHEREAS, Inlet Instruments and Controls was the only company that
submitted a proposal, and
WHEREAS, their rates seem reasonable and fair.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Kenai,
Alaska that a contract be awarded for the repairs that are presently
needed on the City of Kenai street lighting to Inlet Instruments
and Controls as specified by their letter of June 23, 1978 and
incorporated herein by reference.
PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA this 29th day
of June, 1978.
EDWARD AMBARIAN, COUNCILMAN
ATTEST:
C~
ue eter, ity er
_ _ - ~ __ '~
~-- - ~ ~ - --- - - - - -- - - - - T - - -- - - - - -- - - - - ---
.j --~--- - ~ _ --r
INLET INSTRUMENTS f~ CONTROLS
DRAWER 1387, SOLDOTNA, ALASKA 99669
907-262-4952
907-262-5275
~~
i =•
June 23, 1978
City of Kenai
P.O. Bxo 580
Kenai, Alaska 99611
Attention: Mr. Kieth Kornellis
Subject: Repair of City of Kenai Street Lighting
Dear Sir:
Further to our conversation, I have broken this proposal down to three
separate categories: (a) Repair of defective street lights ~i 17,19,28,
37,70,69,74, Beaver Loop and Bridge access. (b) Installation of new poles
and fixtures ~ 21,23. (c) Installation of new pole and fixture ~~ 58.
Considering these individually:
(a) Estimate on per fixture basis - not possible to give definite
on material. Prices quoted are for standard replacement items.
Electrician: 2 men 4 hrs @ 27.50/hr $ 220,00
Mobile crane/basket @ 65.00/hr 260.00
Material: Ballasts @ 137.50
Lamps @ 27.50/ea
Vehicle @ 25.00/day 12.50
(b) Pole ll 21 2,707.00
Repair concrete base, repair cable, install
(1) new anchor bolt, new anchor plate, pole,
1000 Watt flg fixture
Pole l~ 23 2,675.00
Repair concrete base, install (1) new anchor
bolt, new anchor plate, pole, 1000 Watt Hg
fixture replace socket.
.bC (c) Pole 58 2,825.00
Repair concrete base, repair cable, install
(2) new anchor bolts, new anchor plate, pole,
replace broken cable, 1000 Watt Hg fixture
~_ .
~. Ik ~~ s
C ~ ,° ~. ,
City of Kenai
June 23, 1978
Page 2
The fixtures have a three week delivery schedule and the poles cannot
be shipped before 8-11-78 (San Fransico)
Thank you for your interest iu Inlet Instruments b Controls
Yours truly,
M. Thomas Dwinnell
Ei r_losure (Rate Sheet)
'~ 7~i S ~~ Po c E
'75 F'Ra ~b«r ~ ~
~~~q~'~
^S~'S ~~xiuRi*
G ~1~40~ 24~YS~Po~~
n
--• _ . .
---
• ~
_
--- - - _ - - - ---- --r.~.~
~
INLET INSTRUMENTS f~ CONTROLS
DIFAWER 1387, SOLDOTNA, ALASKA 99669
907-262-4952
907-262-5275
LABOR b SERVICE RATES
Instrument Service Engineers - Rate $ 32.50
Job Classification: Engineering and design of new installations and systems;
engineering and design modifications in existing installations; all vibration
related work; supervisory capacity.
Journeyman Instrument Technician/Electrician - Rate $ 27.50
Job Classification: Maintenance and repair on controls (electrical and
I pneumatic); stress relieving; communications repair; shop repair work.
Above Rates Include:
(1) All Rand Toole
Note
(1) When job site is located in an area accessible only by air or boat,
transportation will be provided by contracting company cr will be provided
~ by Inlet Instruments b Controls at local air taxi rates. Lodging, when
i required, will also be provided by contracting company.
(2) Regular work week hours are Monday through Friday, 8 hours per day with
starting times dependent on customer requirements. All others constitute
overtime at one and one half the regular rate except for Sunday and
National Holidays which will be paid at double time rate.
(3) Work Day to start at job site when job is 20 miles or less from Soldotna,
'7 otherwise work day will begin on departure from Soldotna.
(4) Test equipment and construction equipment per attached rental rate sheet.
(5) Gauge Repair - $ 15.50 per gauge plus parts $ 25.00 per liquid filled gauge
(6) Magneto Repair - Fairbanks Morse LTR $ 100.00; Fairbanks Morse SCSA $ 200.00
(7) When Company vehicles are required to transport equipment, material and
personnel to and from and on the job site, a rate of $ 25.00 per day per
vzhicle will apply. This does not apply to offshore work.
(B) A 157. Service Charge will be applied to all materials perchased by Inlet
~ Instruments ~ Controls.
(9) A minimum charge of 6 hours will be made for any time up to 4 hours.
------------f-- T _ _ _ ~ ~ _._- - .- --~ _
,:
. ~~ ~^ ~
INLET INSTRUINEIVTS fs CONTROLS
DRA1f~ER 1387, SOLDO'1'NA, ALASKA 99669
' ~ 907-262-4952
907-262-5275
i
i
j EQUIPMENT RENTAL RATES
I
MV Portable Potentiometer Unit $ 7.00 / day
Wallace Tiernan Pneumatic Calibration Unit 7.00
Cable Puller 10.00
Electric Conduit Bender 10.00
Electric/Hydraulic Bender 10.00
Vacuum Fish Tape 9.00
Hydraulic Knock-Out 8.50
Power Head 7.50
2-4" Threader attached for above 5.00
Cutters, dies 3.00
Extension Ladder 10.00
Generator 3KW 25.50
10' Ladder 5.00
• Tri Stands 3.50
Electric Drill 8.00
Porta Band Saw 8.00
Sawzall 8.00
Megger 5.00
Vibration Analysis Equipment
Spectrum Analyzer and xy Recorder 75.00
' Manual Vector Phase Filter 25.00
Vibration Filter Meter 20.00
F.M. Tape Recorder 45.00 '
~~ Digital Vector Phase Filter 75.00
Stress Relieving Equipment
~+ Temperature Recorder 10.00
_. Temperature Controller 20.00
~' Rope Heater 35.00 / heat
E
t _ t - - - - _ __ __ _