Loading...
HomeMy WebLinkAboutRESOLUTION 1978-107~~ 7 "~ ~ '- ~ ~ ~ CITY OF KENAI RESOLUTION N0. 78-107 A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA AiVARDING THE CONTRACT FOR THE REPAIR OF CITY OF KENAI STREET LIGHTING TO INLET INSTRUI~NTS AND CONTROLS. j WHEREAS, the City of Kenai did approach three electrical contractors for proposals to repair City of Kenai street lighting, and WHEREAS, Inlet Instruments and Controls was the only company that submitted a proposal, and WHEREAS, their rates seem reasonable and fair. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Kenai, Alaska that a contract be awarded for the repairs that are presently needed on the City of Kenai street lighting to Inlet Instruments and Controls as specified by their letter of June 23, 1978 and incorporated herein by reference. PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA this 29th day of June, 1978. EDWARD AMBARIAN, COUNCILMAN ATTEST: C~ ue eter, ity er _ _ - ~ __ '~ ~-- - ~ ~ - --- - - - - -- - - - - T - - -- - - - - -- - - - - --- .j --~--- - ~ _ --r INLET INSTRUMENTS f~ CONTROLS DRAWER 1387, SOLDOTNA, ALASKA 99669 907-262-4952 907-262-5275 ~~ i =• June 23, 1978 City of Kenai P.O. Bxo 580 Kenai, Alaska 99611 Attention: Mr. Kieth Kornellis Subject: Repair of City of Kenai Street Lighting Dear Sir: Further to our conversation, I have broken this proposal down to three separate categories: (a) Repair of defective street lights ~i 17,19,28, 37,70,69,74, Beaver Loop and Bridge access. (b) Installation of new poles and fixtures ~ 21,23. (c) Installation of new pole and fixture ~~ 58. Considering these individually: (a) Estimate on per fixture basis - not possible to give definite on material. Prices quoted are for standard replacement items. Electrician: 2 men 4 hrs @ 27.50/hr $ 220,00 Mobile crane/basket @ 65.00/hr 260.00 Material: Ballasts @ 137.50 Lamps @ 27.50/ea Vehicle @ 25.00/day 12.50 (b) Pole ll 21 2,707.00 Repair concrete base, repair cable, install (1) new anchor bolt, new anchor plate, pole, 1000 Watt flg fixture Pole l~ 23 2,675.00 Repair concrete base, install (1) new anchor bolt, new anchor plate, pole, 1000 Watt Hg fixture replace socket. .bC (c) Pole 58 2,825.00 Repair concrete base, repair cable, install (2) new anchor bolts, new anchor plate, pole, replace broken cable, 1000 Watt Hg fixture ~_ . ~. Ik ~~ s C ~ ,° ~. , City of Kenai June 23, 1978 Page 2 The fixtures have a three week delivery schedule and the poles cannot be shipped before 8-11-78 (San Fransico) Thank you for your interest iu Inlet Instruments b Controls Yours truly, M. Thomas Dwinnell Ei r_losure (Rate Sheet) '~ 7~i S ~~ Po c E '75 F'Ra ~b«r ~ ~ ~~~q~'~ ^S~'S ~~xiuRi* G ~1~40~ 24~YS~Po~~ n --• _ . . --- • ~ _ --- - - _ - - - ---- --r.~.~ ~ INLET INSTRUMENTS f~ CONTROLS DIFAWER 1387, SOLDOTNA, ALASKA 99669 907-262-4952 907-262-5275 LABOR b SERVICE RATES Instrument Service Engineers - Rate $ 32.50 Job Classification: Engineering and design of new installations and systems; engineering and design modifications in existing installations; all vibration related work; supervisory capacity. Journeyman Instrument Technician/Electrician - Rate $ 27.50 Job Classification: Maintenance and repair on controls (electrical and I pneumatic); stress relieving; communications repair; shop repair work. Above Rates Include: (1) All Rand Toole Note (1) When job site is located in an area accessible only by air or boat, transportation will be provided by contracting company cr will be provided ~ by Inlet Instruments b Controls at local air taxi rates. Lodging, when i required, will also be provided by contracting company. (2) Regular work week hours are Monday through Friday, 8 hours per day with starting times dependent on customer requirements. All others constitute overtime at one and one half the regular rate except for Sunday and National Holidays which will be paid at double time rate. (3) Work Day to start at job site when job is 20 miles or less from Soldotna, '7 otherwise work day will begin on departure from Soldotna. (4) Test equipment and construction equipment per attached rental rate sheet. (5) Gauge Repair - $ 15.50 per gauge plus parts $ 25.00 per liquid filled gauge (6) Magneto Repair - Fairbanks Morse LTR $ 100.00; Fairbanks Morse SCSA $ 200.00 (7) When Company vehicles are required to transport equipment, material and personnel to and from and on the job site, a rate of $ 25.00 per day per vzhicle will apply. This does not apply to offshore work. (B) A 157. Service Charge will be applied to all materials perchased by Inlet ~ Instruments ~ Controls. (9) A minimum charge of 6 hours will be made for any time up to 4 hours. ------------f-- T _ _ _ ~ ~ _._- - .- --~ _ ,: . ~~ ~^ ~ INLET INSTRUINEIVTS fs CONTROLS DRA1f~ER 1387, SOLDO'1'NA, ALASKA 99669 ' ~ 907-262-4952 907-262-5275 i i j EQUIPMENT RENTAL RATES I MV Portable Potentiometer Unit $ 7.00 / day Wallace Tiernan Pneumatic Calibration Unit 7.00 Cable Puller 10.00 Electric Conduit Bender 10.00 Electric/Hydraulic Bender 10.00 Vacuum Fish Tape 9.00 Hydraulic Knock-Out 8.50 Power Head 7.50 2-4" Threader attached for above 5.00 Cutters, dies 3.00 Extension Ladder 10.00 Generator 3KW 25.50 10' Ladder 5.00 • Tri Stands 3.50 Electric Drill 8.00 Porta Band Saw 8.00 Sawzall 8.00 Megger 5.00 Vibration Analysis Equipment Spectrum Analyzer and xy Recorder 75.00 ' Manual Vector Phase Filter 25.00 Vibration Filter Meter 20.00 F.M. Tape Recorder 45.00 ' ~~ Digital Vector Phase Filter 75.00 Stress Relieving Equipment ~+ Temperature Recorder 10.00 _. Temperature Controller 20.00 ~' Rope Heater 35.00 / heat E t _ t - - - - _ __ __ _