Loading...
HomeMy WebLinkAboutRESOLUTION 1977-149_ _ ~_. r~~ '. ~' ~ 10: OF KF1VA2 RES N0. 77-149 Kenai N~ Yn pection Fees?-01-01684 $8,0~ The purpose of this resolution is to transfer funds within the Kenai Water Project to cover inspection fees for the remainder of the project. P SY T4~ ODLRJCIL OF Tk1E CITY OF KENAI, ALASKA, this 2nd day of November, 1977. 0 eter, ty r ° CITY F KEAI ° i ~ ~ (,~ l.(®j. [6K b60 KENAL(pA•t4lAfKA~9J9611 TEl[PNONE 28d - Pddd Actober 19, 1977 MEMO TOs Ross Kinney, Finance Director FR6Ms Keith Kornelis. Bireetor of Fublic caorks ~UBJECTs Improvements to Water Supply and Distribution System, City of Kenai, Alaska, EDA Project f07-O1-01684. Summary Data. The following can be concluded based an the attached mema from Gantt Pehrsort: - 1. The subject projeot has an estimated completion date of November 30, 1377. 2. T:tm F..^»nCe n~°part.~"9.^.t ahay~,lri ftas~re~ ost $3 ,600.Ob ner month Bvrhich is a total of $7,200.00 for Octover and Novemberl plus fringe benefits for engineering inspections. • M _: ~. • . ~ .i f ^ ' ~~ r sober 13, 2977 __a~_ . .,-. .. _......__ ' I?Y F KEN I :. °~ i , O. FOR SEO EENAP, AlA50fA 9YiI1 '~~~ L-•°~•' fFIE/NONE 755 - 5558 TOs Keith Komel3s, Director of Public Works FROMs Garth E. Peterson, Assistant Director of Public *•7orks aq~~'CTa improvements to Water Supply and Disarab„aion System, City of Kenai, Alaska, EDA Project 1107-01-01684. H Data. ~.-; The subject project is rapii9ly drawing to completion. Well #2 is oompleted except for same very minor details and some eoatrol adjustments which actually comes under operating procedure and will have to be corrected over a period of time. Well Bl is open and is now being rehabilitated. As of this date the pump and piping on Well';1 have been pulled from the wells the television inspection of the inner oaring is completed: the roof has been insulated. ; ';;.~ "'~ » . The television inspection demonstrated a very loose fit on the screen-well packer. Harold Galliett was present during the inspection which took place on Sunday, October 9, 1977. The decision, made upon the completion of the television inspection, Mar that the gacker had not been.,properly :wedged and that in order to completely rehabilitate -the wall before development aRd teat gumpinq the gacker must"be'swedged. Evidence indicates that this is the area where the sand has been flowing into the Mell and thereby being pumped -into the storage tank and water distribution system. This constitutes a major repair and will require additional monies to cover it. °: The action decided upon with the packer was based on an analysis of the television pictures and due to the inability of the camera to give us an absolutely clear picture (silt and debris iES the waterH this is the best canciusion that could be made. The :wedging of the packer is not a guarantee that the problem Mill be resolved. However, it is Mr. Galliett°s feeling, and mine also, that this is the problem area and Mr. Galliett feels ,that the awedging has a good possibility of curing the problem. The monies to correct this situation will be investment based on available engineering data tTV camera inspection) but does ' Rot incur any guarantee that this will completely cure the problem. The packer 1n its existing condition shows a poor quality of workmanship and.compietion by the contractor that placed the screen and pipe. This is also a supposition because ---,-_ _- - - -- ~- s-- -- - .. _~ -. --- < ' Otober 13, 1977 page 2 not have enough details from the original contractor or a work to make a complete accusation. The poor quality is ely art analytical conclusion based ort knowledge of what should have been done and the results of the recent television inspection. basic period remainfng for the job will now, of course, have be extended. However, I anticipate that this project will be a leted on or bef®re November 30, 1977. Basically then the pinance Department should figure on two months salary at a imam of thirty-six hundred dollars '($3,600.00) per month (including November and extending to DeFembe~ 1, 1977) plus !fringe benefits for that period of time. I anticipate leaving the project sometime during the month of November as soon as I estimate that my services will no longer be required. There are some technical details which have to be covered on cJell ~1 end as soon as they~are covered I feel that there is a good possibility that I can be released from my obligations on this project. Should you need further data, I will be delighted to furnish it. GEp/pk .... .. ., .. .. a . ,l,w a 1K®T10ATs Motion panned unanimausly by roll call cote. C-3s R lutiolt ?7-I49 -Transfer of Punda - EDA Water praieet 07-01-0%684 M®TIAN: Councilman Whelan moved, aeoonde8 by Councilman Aokerly, for adoption of Resolution 77-149, transfer of funds within. EBA Water Projeet 0?-OI-0%884 in the amount of;8,000 for inspection fees. M®tion passed unanimously by roll call vote. C-4: Resolution 77-150, Aeoeoting bid from Alaska Chrysler for Police Cara Mayor 0°Reilly read Resolution 77-150 by title oniq. "A resolution of the Council oP the City of Renal ecoepttng bid from Alaska Chrysler, Ins. 4or the purchase of two pollee oars at 55,489.90 each rather than at $5,387,80 as provided for by ~_-_e__u__ nn ass