HomeMy WebLinkAbout2021-02-04 Beautification Packet - Special MeetingKENAI PARKS & RECREATION COMMISSION
BEAUTIFICATION COMMITTEE
JOINT SPECIAL MEETING
FEBRUARY 4, 2021 – 6:00 P.M.
KENAI CITY COUNCIL CHAMBERS
210 FIDALGO AVE., KENAI, AK 99611
*Telephonic/Virtual Information Below*
www.kenai.city
1. CALL TO ORDER
a. Pledge of Allegiance
b. Roll Call
c. Agenda Approval
2. UNSCHEDULED PUBLIC COMMENT (Public comment limited to three (3) minutes
per speaker; thirty (30) minutes aggregated)
3. NEW BUSINESS
a. Discussion/Recommendation – FY21-FY25 Capital Improvement Plan
4. COMMISSION QUESTIONS AND COMMENTS
5. ADDITIONAL PUBLIC COMMENT
6. INFORMATION ITEMS
7. ADJOURNMENT
Join Zoom Meeting https://us02web.zoom.us/j/89008610544
Meeting ID: 890 0861 0544 Passcode: 714782 OR Dial in by your Location: (253) 215-8782 or (301) 715-8592 Meeting ID: 890 0861 0544 Passcode: 714782
1
MEMORANDUM
TO: Parks & Recreation Commission
Beautification Committee
FROM: Robert J. Frates, Parks & Recreation Director
DATE: January 28, 2021
SUBJECT: Parks, Rec. & Beautification - FY21-FY25 Capital Improvement Program
The purpose of this correspondence is to request your review of the Parks & Recreation
Department’s 5-year Capital Improvement Program.
This document provides a summary of all the projects that were included in the FY21 annual
budget and approved by the Kenai City Council. Again, these are projected future projects
greater than $35,000 and not all projects, for various reasons, receive the necessary funding for
the projected year.
Please review the Parks & Recreation section of the Capital Improvement Plan for discussion
and recommendation at our February 4, 2021 Joint Special Meeting.
Thank you and please let me know if you have any questions.
Attachment
2
GENERAL FUND
FV2021
Pro ject
COST No.
KENAI BLUFF 01 $1,000,000
STABILIZATION'
MUL Tl-PURPOSE FACILITY 02 $75,000
EXHAUST FAN
MUL Tl -PURPOSE FACILITY 0 3 $80,000
RUST REMEDIATION
$1 ,155,000
FY2022
Project
COS T No.
KENAI BLUFF 01 $17,5 0 0,0 0 0
STABILIZATION •
WILDWOOD DRIVE • 0 4 $290 ,00 0
FIRST STREET REPAIRS 0 5 $60 ,00 0
DISPATCH RADIO 0 6 $250,000
REPLACEMENT •
LIBRARY DDC CONTROLS 0 7 $58,000
VISITOR CENTER DDC 08 $62,0 00 CONTROLS
INLET WOODS STORM 09 $120,000
WATER IMPROVEMENTS
REC CENTER WATER 10 $60,000
HEATER REPLACEMENT
BRIDGE ACCESS PEDESTR IAN
TRAIL•
II $2,3 98,229
CITY OF KENAI TENT/ 12 $446,21 0
VEHICLE CAMPGROUND •
PHASE I: RFID TAGGING O F 13 $132,000 LIBRARY COLLECTION•
NETWORK ACCESS
CONTROL• 14 $60,000
IT MASTER PLANN ING 15 $35,0 00
CITY HAL L AIR HANDLER 16 $210 ,0 00
REPLACEMENT
VISITOR CENTER ROOF 17 $120,000
REPLACEMENT
$21 ,801,439
CITY OF KENAI I
CAPITAL IMPROVEME T P LAN
FY2021-2025
DESCRIPTION
Stabilize a one-mile area on the northern
bank of 1·he Kenai River
Install large exhaust fan ventilation sysl·em
Install rust reformer spray on strudural
steel elements
)) $155 ,000 GENERAL FUND
$1 ,000,000 GRANT/OTHER
D ESC RI PTIO N
Stabilize a one-mile area on the northern
bank of the Kenai River
Reconstrud 2,318 foot of roadway
Remove and replace damaged roadway
Replace outdated dispatch radios a nd
recording equipment
Improvements to Library HVAC controls
Maintenance and recommission of
mechanical systems & direct digital controls
Drainage improvements to prevent street
flooding
Remove and replace existing water heaters
Construct JO-foot wide, 1.3 mile pav ed and
separated pathway on Bridge Acce ss Road
Design and construct a campground with
20-30 accessible spots
Provide RFID technology to tag items in the
Library collection
Provide physical access control for City -
owned network infrastructure
Analyze City's need for updating existing or
new compu t er and network infrastructure
Replace exist ing roof top unit air handler
Complete replacement of asphalt shingle
roofing with new
)} $1,086,560 GENERAL FU l'-lD
. $20,714,879 G RAN T/O THER
*Projects marked with an asterisk denote project is dependent on grant funding 13 I GEN E
1
RA L FUND
3
GENERAL FUND
FV2023
Pro ject
COST N o.
KENAI BLUFF 01 $17,500,000
ST ABILIZATJON*
WILLOW STREET REPAIRS 18 $420 ,0 00
REC CENTER RTU HVAC 19 $280,000
REPLACEMENTS
POLICE MOBILE RADIO 20 $100,000
REPLACEMENT*
OUTDOOR EVENT PARK 2 1 $35,0 00
DESIGN AND FEASIBILITY
PHASE II: RFID TAGGING OF 22 $35,000
LIBRARY COLLECTION'
KENAI NORDIC TRAIL 23 $200,000
LIGHTING -DESIGN &
CONSTRUCTION"
MUNICIPAL PARK TRAIL 24 $85,0 0 0
BO AR DWAL K
PHASE II : KENAI CElv1ETERY 25 $260 ,000
EXPANSION
M UL Tl-FACTOR 26 $50 ,000
AUTHENTICATION (MFA)
$18,965;000
FV2024
Project
COST No.
LILAC STREET REPAIRS 27 $393,000
CITY HALL ELEVATOR 28 $5 0 ,000
MAJ O R MAINTENANCE
REC CENTER ROOF 29 $756,000
REPLACEMENT
FUTURE ROAD REPAIRS 30 $25 0 ,000
FUT URE ST O RM WATER 31 $80,000
IMPROVEMEN TS
SOFTBALL GREEN STR IP PLAY 3 2 $85,000
EQUIPMENT REPLACEMENT
$1 ,61 4,000
CITY OF KENAI I
CAPITAL IMPROVEMENT PLAN
FY2 021 -2025
DESCRIPTION
Stabilize a one-mile area on the northern
bank of the Kenai River
lv1illing and resurfacing of roadway from
Main Street to Airport Way
Replace Rooftop Unit, including air handlers,
contro l valves, and thermostats
Replace all police vehicle mounted mobile
radios
Provide engineered drawings to construct an
event park
Insta ll self-sorting machines and security
gates
Design and construct lighted Nord ic l·rail
sys1·em at the Kenoi Golf Course
Construct engineered elevoted boardwolk
adjocent to Kenai Little League ballfields
Construct large pavilion, lighted flog poles,
storage building, and columbarium
Purchase and install software and hardware
to implement multi-factor authentication
)) $1,13 0 ,000 GENERA L FU ND
$17,835,000 GRANT/OTHER
DESCRIPTION
Replace failed concref·e curb, re-stabilize sub-
base, and provide new aspha lt surface
Rep lace 30+ year-old components
Replace existing built-up roof with new
membrane roof system
Major repairs to correct settlement and fai ling
asphalt areas
Major repairs to storm water conveyance
system including culverts and catch basins
Replace children's playground equipment
)) $1,614,0 0 0 GENERAL FUND
$0 GRANT/OTHER
•projects marked with an asterisk denote project is dependen t on grant funding 14 I GENERAL FUND
4
GENERAL FUND
*Projects marked with an asterisk denote project is dependent on grant funding
CITVi OF KENAI I
CAPITAL IMPROV EME NT PLAN
FY202 1-2025
5
GENERAL FUND PROJECT
BLUFF STABILIZATION
Department: Administration I Public Works
Total Project Cost: $36,000,000
Project Phased: Yes
Project Type: Infrastructure
Funding Source(s): Grant Dependent I Bonding
Potential Grant Identified: State Capital Project
Submission and Federal Grants To Be Identified
Operating Budget Impact: Slight Decrease .. 2021 2022 2023
COST: $1,000,000 $17,500,000 $17,500,000
Details:
01
2024
The City of Kenai in coordination with the Army Corp of Engineers Bluff Erosion Control
Project is intended to stabilize an area on the northern bank of the Kenai River from near
the river's mouth below Historic Old Town extending upriver approximately one mile
toward the first cannery just below Bluff Overlook Park at the end of Spur View Dr:ive.
MUL Tl-PURPOSE FACILITY EXHAUST FAN
Department: Public Works
Total Project Cost: $75,000
Project Phased: No
Project Type: Building Improvement
Funding Source(s): General Fund
Potential Grant Identified: None
Operating Budget Impact:
Slight Increase .. 2021 2022
COST: $75,000
Details:
2023
02
2024
This project will install a large exhaust fan ventilation system with humidistatic controls to
prevent continued moisture issues within the Multi-Purpose Facility. Summer ice is the
largest contributing factor to excessive humidity; however, this system will be beneficial
year-round.
16 I GENERAL FUND
6
GENERAL FUND PROJECT
MULTI-PURPOSE FACILITY RUST REMEDIATION
Department: Public Works
Total Project Cost: $80,000
Project Phased: No
Project Type: Building Improvement
Funding Source(s): General Fund
Potential Grant Identified: None
Operating Budget Impact:
Minimal or No Impact .. 2021 2022
COST: $80,000
Details:
2023 2025
This project will remove rust and algae at the Multi-Purpose Facility by power washing
and then sealing parts of the Facility with a rust inhibitor spray coating to ensure the
Facility will be usable for years to come. Excessive moisture issues at the Facility have
created an environment for rust and algae to grow on elements of the interior roof
structure.
WILDWOOD DRIVE
Department: Public Works
Total Project Cost: $290,000
Project Phased: No
Project Type: Infrastructure
Funding Source(s): General Fund I Other
Potential Grant Identified: State Capital Project
Submission I Department of Corrections
Operating Budget Impact: Slight Decrease
2021 2022
COST: $290,000
Details:
2024
04
This project will reconstruct 2,318-foot of roadway, widen it to 24 feet, provide drainage
ditching, remove existing deteriorating asphalt, stabilize sub-base, compact, and pave.
Wildwood drive provides access to the Wildwood Correctional Facility, and the City
requires ownership and site control prior to proceeding with upgrades, which have Been
needed for at least 40 years. The City is currently working with the Kenai Native
Association to gain site control for the road the City has maintained for decades. The City
will pursue shared funding for this project with the Department of Corrections.
17 I GENERAL FUND
7
GENERAL FUND PROJECT
FIRST STREET REPAIRS
Department: Public Works
Total Project Cost: $60,000
Project Phased: No
Project Type: Infrastructure
Funding Source(s): General Fund
Potential Grant Identified: State Capital Project
Submission
Operating Budget Impact: Minimal or No Impact .. .. 2021 2022 2023
COST: $60,000
Details:
2024
OS
This project removes and replaces approximately 250 feet of damaged roadway and curb
on First Street.
DISPATCH RADIO REPLACEMENT
Department: Police
Total Project Cost: $250,000
Project Phased: No
Project Type: Equipment
Funding Source(s): Grant Dependent
Potential Grant Identified: State Capital Project
Submission I Department of Homeland Security
Operating Budget Impact: Slight Increase .. 2021 2022 2023
COST: $250,000
Details:
2025
This project is a critical replacement of outdated dispatch radios and recording
equipment. Grants have been applied for multiple years for this replacement.
06
18 I GENERAL FUND
8
GENERAL FUND PROJECT S
LIBRARY DOC CONTROLS
Department: Public Works
Total Project Cost: $58,000
Project Phased: No
Project Type: Building Improvement
Funding Source(s): General Fund
Potential Grant Identified: None
Operating Budget Impact:
Slight Decrease .. 2021 2022
COST: $58,000
Details:
07
2023 2024 I 2025
This project replaces older control components with new, as well as recommissions existing
heating, ventilation, and air conditioning (HVAC) controls system. The Library had major
improvements completed approximately 10 years ago, and older areas of the library
continue to struggle with maintaining set-point temperatures.
VISITOR CENTER DOC CONTROLS
Department: Public Works
Total Project Cost: $62,000
Project Phased: No
Project Type: Building Improvement
Funding Source{s): General Fund
Potential Grant Identified: None
Operating Budget Impact:
Slight Decrease .. 2021 2022
COST: $6'2,000
Details:
08
~·
!
2023 2024 2025
The Kenai Visitor and Cultural Center's mechanical systems and existing Direct Digital
Control (DDC) systems are in need of major maintenance and recommissioning. S veral
areas of the facility are not operating correctly. This project will identify the components
which are failing and provide for their replacements.
19 I GENERAL FUND
9
GENERAL FUND PROJECT
INLET WOODS STORM WATER IMPROVEMENTS
Department: Public Works
Total Project Cost: $120,000
Project Phased: No
Project Type: Infrastructure
Funding Source(s): General Fund
Potential Grant Identified: None
Operating Budget Impact:
Slight Decrease .. 2021 2022
COST: $120,000
Details:
2023 2024
This project will improve catch basin conveyance and capacity to resolve several
areas within the Inlet Woods Subdivision that experience flooding of the roadways
due to insufficient storm water infrastructure.
REC CENTER WATER HEATER REPLACEMENTS
Department: Public Works
Total Project Cost: $60,000
Project Phased: No
Project Type: Building Improvement
Funding Source(s): General Fund
Potential Grant Identified: None
Operating Budget Impact:
Minimal or No Impact
2021 2022
COST: $60,000
Details:
09
10
This project will remove and replace the existing water heaters with new comparably-sized
equipment. The Kenai Recreation Center water heaters are beyond their useful lifo and
have been requiring extensive maintenance to remain operational.
'20 I GENERAL FUND
10
GENERAL FUND PROJECT
BRIDGE ACCESS PEDESTRIAN TRAIL
Department: Parks & Recreation
Total Project Cost: $2,398,229
Project Phased: No
Project Type: Infrastructure
Funding Source(s): Grant Dependent ($2,181,669)
General Fund ($216,560)
Grant Identified: Department of Transportation
Operating Budget Impact: Slight Increase .. 2021 2022 2023
COST: $2,398,229
Details:
2024
This project constructs a 10-foot-wide 1.3 mile paved and separated pathway along the
east side of Bridge Access Road from its intersection with Beaver Loop Road to its
intersection with the Kenai Spur Highway. The final finished surface consists of a 2-inch
layer of asphalt.
CITY OF KENAI TENT/ VEHICLE CAMPGROUND
Department: Parks & Recreation
Total Project Cost: $446,210
Project Phased: No
Project Type: Infrastructure
Funding Source(s): Grant Dependent
Grant Identified: State of Alaska
Operating Budget Impact:
Slight Increase
2021 2022
COST: $446,210
Details:
2023 2024 2025
This project designs and constructs a campground with approximately 20-30 accessible
spots, restroom with showers, a small play area, and a pavilion . After the closure of the
City's last campground in the early 2000s and the more recent closures of private
campgrounds, the City is without a campground.
12
21 I GENERAL FUND
11
GENERAL FUND PROJECT
PHASE I: RFID TAGGING OF LIBRARY COLLECTION
Department: Library
Total Project Cost: $132,000
Project Phased: Yes
Project Type: Technology
Funding Source{s): Grant Dependent
Potential Grant Identified: Rasmuson Tier 2
Operating Budget Impact:
Slight Decrease .. 2021 2022 2023
COST: $132,000
Details:
2024
13
This project would tag every item in the Library collection with a machine-readable tag
and include four new staff stations for check out and in of material. Currently staff check
each item out one at a time. The use of Radio-frequency Identification (RFID) technology
would reduce staff and customer error in checking items in and out which would result in
efficiencies. The automatic sorters would reduce the amount of staff work and time.
NETWORK ACCESS CONTROL
Department: Finance -Information Technology
Total Project Cost: $60,000
Project Phased: No
Project Type: Technology
Funding Source(s): Grant Dependent
Potential Grant Identified: Department of
Homeland Security
Operating Budget Impact: Minor or No Impact .. 2021
I
'
2022 2023
COST: $60,000
Details:
14
2024
The project provides physical access control for all City-owned network infrastructure. The
National Cybersecurity Review (NCSR) lists physical access to network equipment as a
serious threat to cybersecurity. This project would secure all network equipment in a
locking enclosure. It will also consolidate wiring locations at the Senior Center from three
to one.
22 I GENERAL FUND
12
GENERAL FUND PROJECTS
IT MASTER PLANNING
Department: Finance -Information Technology
Total Project Cost: $35,000
Project Phased: No
Project Type: Technology
Funding Source(s): General Fund
Potential Grant Identified: None
Operating Budget Impact:
Slight Decrease .. 2021 2022 2023
COST: $35,000
Details:
15
This project analyzes the City's needs for updating existing or new computer and network
infrastructure as well as the need to update or acquire new software to increase the
efficiency, transparency and effectiveness of City departments in performing their daily
tasks and activities.
CITY HALL AIR HANDLER REPLACEMENT
Department: Public Works
Total Project Cost: $2.10,000
Project Phased: No
Project Type: Building Improvement
Funding Source(s): General Fund
Potential Grant Identified: None
Operating Budget Impact:
Slight Decrease .. 2021 202!2
COST: $210,000
Details:
!2023
16
2024
This project replaces the existing roof top unit air handler at City Hall, which was imstalled
in 1980. The Facility is approximately 9,588 square feet, and this project includes Direct
Digital Controls (DDC) for operational efficiency.
!23 J GENERAL FUND
13
GENERAL FUND PROJECTS
VISITOR CENTER ROOF REPLACEMENT
Department: Public Works
Total Project Cost: $120,000
Project Phased: No
Project Type: Building Improvement
Funding Source(s): General Fund
Potential Grant Identified: None
Operating Budget Impact:
Minimal or No Impact .. 2021 2022
COST: $120,000
Details:
2023
.
2024 2025
17
This project removes and replaces the roof at the Kenai Visitor and Cultural Center and
includes new ice and water shield. The existing Asphalt Shingle Roof has reached the end
of its useful life. Leaks are occurring more often over the last few years. The existing roof
is approximately 30 years old.
WILLOW STREET REPAIRS
Department: Public Works
Total Project Cost: $420,000
Project Phased: No
Project Type: Infrastructure
Funding Source(s): General Fund
Potential Grant Identified: None
Operating Budget Impact:
Slight Decrease
COST:
Details:
2021
I
2022 2023 2024
$420,000
This project includes milling and repaving of asphalt roadway approximately 40 feet in
width and 1,950 feet in length between Main Street and Airport Way.
18
'24 I GENERAL FUND
14
GENERAL FUND PROJECTS
KENAI RECREATION CENTER RTU HVAC REPLACEMENTS
Department: Public Works
Total Project Cost: $280,000
Project Phased: No
Project Type: Building Improvement
Funding Source(s): General Fund
Potential Grant Identified: None
Operating Budget Impact:
Minimal or No Impact .. '20'21 '20'2'2
COST:
Details:
'20'23 '20'24
$280,000
'20'25
19
This project will replace the oldest equipment first, including air handlers, control valves,
and thermostats. The Kenai Recreation Center was constructed in 1980 with an addition
added in 1982. Many of the mechanical systems are now 40 years old and require
extensive maintenance to maintain operation.
MOBILE RADIO REPLACEMENT
Department: Police
Total Project Cost: $100,000
Project Phased: No
Project Type: Equipment
Funding Source(s): Grant Dependent
Potential Grant Identified: Department of
Homeland Security
Operating Budget Impact: Minimal or No Impact .. 20'21 20'2'2 '20'23
COST: $100,000
Details:
'20'25
This project will replace all vehicle mounted mobile radios that will be beyond their
service life, with newer P-25 compliant radios.
20
'25 I GENERAL FUND
15
GENERAL FUND PROJECT
OUTDOOR EVENT PARK DESIGN AND FEASIBILITY
Department: Parks & Recreation
Total Project Cost: $35,000
Project Phased: Yes
Project Type: Infrastructure
Funding Source(s): General Fund
Potential Grant Identified: None
Operating Budget Impact:
Slight Increase .. 2021 2022
COST:
Details:
2023 2024
$35,000
21
This project will provide engineered drawings to construct an event park to include a
stage, restrooms, parking lot, and utilities. The phased project would construct an elevated
stage with future phases of the project to include construction of a permanent restroom
with utilities, spectator area, event area, vendor area, and parking lot.
PHASE II: RFID TAGGING OF LIBRARY COLLECTION
Department: Library
Total Project Cost: $35,000
Project Phased: Yes
Project Type: Building Improvement
Funding Source(s): Grant Dependent
Potential Grant Identified: Rasmuson Tier 2
Operating Budget Impact:
Slight Decrease .. 2021 2022 2023
COST: $35,000
Details:
20'24
'
22
2025
This project installs Self-Sorting Machines and Security Gates at the Library to create a
reduction in staff and patron time spent finding items as well as creates additional
security.
26 I GENERAL FUND
16
GENERAL FUND PROJECTS
KENAI NORDIC TRAIL LIGHTING · DESIGN & CONSTRUCTION 23
Department: Parks & Recreation
Total Project Cost: $200,000
Project Phased: No
Project Type: Equipment
Funding Source(s): Grant Dependent
Potential Grant Identified: Land Water
Conservation Fund
Operating Budget Impact: Slight Increase ..
COST:
Details:
2021 I 2022
I
2023 2024
$200,000
This project includes the design and construction of a lighted Nordic trail system a~ the
Kenai Municipal Golf Course. The design will dictate future phases and feasibility, but it
is anticipated that the first phase of trail lighting would focus on the driving range and
central bowl area near the clubhouse.
MUNICIPAL PARK TRAIL BOARDWALK
Department: Parks & Recreation
Total Project Cost: $85,000
Project Phased: Yes
Project Type: Infrastructure
Funding Source(s}: Grant Dependent
Potential Grant Identified: Land Water
Conservation Fund
Operating Budget Impact: Slight Increase
2021 2022
COST:
Details:
I 2023
$85,000
24
2024 2025
This project constructs an engineered elevated boardwalk. The first phase of this project
constructed a new trail extending from the existing Kenai Little League ball fields,
meandering within the wooded area at the top of the ravine, and turns east toward the
parking lot. This project would construct a 150-foot boardwalk to the Shqui T satnu Creek
drainage to connect with the existing trail, connecting the east and west sides of
Municipal Park. Future phases of the project require an easement on the east side 0f the
creek.
27 I GENERAL FUND
17
GENERAL FUND PROJECTS
KENAI CEMETERY EXPANSION · PHASE II
Department: Parks & Recreation
Total Project Cost: $'260,000
Project Phased: Yes
Project Type: Infrastructure
Funding Source(s): General fund
Potential Grant Identified: None
Operating Budget Impact:
Slight Increase .. 2021 2022
COST:
Details:
2023
$260,000
25
2024
This project will provide for a large pavilion, lighted flag poles, storage building,
columbarium, front entry sign and an underground sprinkler system. Phase II includes a
pavilion, flag poles, columbarium, and sprinkler system. Phase Ill {beyond FY'25) includes
additional plots, storage building, and a columbarium, if needed.
MUL Tl-FACTOR AUTHENTICATION
Department: Finance -Information Technology
Total Project Cost: $50,000
Project Phased: Yes
Project Type: Technology
Funding Source(s): Grant Dependent
Potential Grant Identified: Department of
Homeland Security
Operating Budget Impact: Slight Increase .. 2021 2022
COST:
Details:
2023
$50,000
2024
I
This project purchases software and hardware to implement Multi-factor Authentication
(MFA) and includes hiring a consultant to implement the solution. Current Criminal
Justice Information Systems (CJIS) requirements from the FBI require MFA when
accessing secure information outside of the Police Department.
28 I GENERAL FUND
18
GENERAL FUND PROJECT
LILAC STREET REPAIRS
Department: Public Works
Total Project Cost: $393,000
Project Phased: No
Project Type: Infrastructure
Funding Source(s): General fund
Potential Grant Identified: None
Operating Budget Impact:
Slight Decrease .. 2021 2022
COST:
Details:
2023 2024 2025
'
$393,000
'.1.7
This project replaces the failed concrete curb in affected areas, re-stabilizes settled
subbase areas, and provides a new asphalt surface course along approximately 1600
linear feet of 30-foot wide roadway. Lilac Lane is located off the Spur Highway and Cook
Inlet View Drive on the north side of Kenai. The roadway and concrete curb and gutt er
are suffering from severe settlement in multiple areas.
CITY HALL ELEVATOR MAINTENANCE
Department: Public Works
Total Project Cost: $50,000
Project Phased: No
Project Type: Building Improvement
Funding Source(s): General Fund
Potential Grant Identified: None
Operating Budget Impact:
Minimal or No Impact .. 2021 2022
COST:
Details:
2023
'
2024
$50,000
2025
I
This project provides major maintenance on the existing City Hall Elevator. This will
replace 30+ year old components for safety purposes while providing minor cosmetic
improvements.
29 I GENERAL FUND
19
GENERAL FUND PROJECTS
RECREATION CENTER ROOF REPLACEMENT
Department: Public Works
Total Project Cost: $756,000
Project Phased: No
Project Type: Building Improvement
Funding Source(s): General fund
Potential Grant Identified: None
Operating Budget Impact:
Minimal or No Impact .. 2021 2022
COST:
Details:
2023 ! 2024
$756,000
29
This project will replace the roof at the Kenai Recreation Center. In 2019, all penetrations
were hot mopped, and an additional cap sheet was added to a small problem area that
persisted with routine leaks. These recent repairs were to buy some time to put a larger
full replacement project together. The existing 21,020 square foot roof is built-up asphalt
and is roughly 40 years old, well beyond its useful life.
FUTURE ROAD REPAIRS
Department: Public Works
Total Project Cost: $750,000
Project Phased: Yes
Project Type: Infrastructure
Funding Source(s): General Fund
Potential Grant Identified: None
Operating Budget Impact:
Minimal or No Impact .. 2021 2022
COST:
Details:
2023 2024
$250,000
This project will allow Public Works to continue to address roadway surface proble
areas as they arise throughout the City.
30
30 I GENEIRAL FUND
20
GENERAL FUND PROJECTS
FUTURE STORM WATER IMPROVEMENTS
Department: Public Works
Total Project Cost: $240,000
Project Phased: Yes
Project Type: Infrastructure
Funding Source(s): General fund
Potential Grant Identified: None
Operating Budget Impact:
Information Needed
2021 2022
COST:
Details:
2023 2024
$80,000
This project will allow Public Works to continue to address storm water runoff, culvert, and
catch basin issues as they continue to deteriorate throughout the City.
SOFTBALL GREEN STRIP PLAY EQUIPMENT REPLACEMENT
Department: Parks & Recreation
Total Project Cost: $85,000
Project Phased: No
Project Type: Equipment
Funding Source(s): General Fund
Potential Grant Identified: None
Operating Budget Impact:
Minimal or No Impact .. '2021 2022
COST:
Details:
'20'23 '2024 '20'25
$85,000
This project replaces an aging and obsolete children's playground located at one of the
most heavily used outdoor locations. This area is near the adult softball fields and
adjacent to a large green strip with a shelter and restrooms.
31 I GENERAL FUND
21
GENERAL FUND PROJECTS
KENAI MUL Tl-PURPOSE FACILITY PERMANENT LOCKER ROOMS
Department: Parks & Recreation
Total Project Cost: $1,250,000
Project Phased: No
Project Type: Building Improvement
Funding Source(s): Grant Dependent
Potential Grant Identified: State of Alaska
Operating Budget Impact:
Slight Decrease .. 2021 2022
COST:
Details:
'
2023 2024 2025
$1 ,250,000
This project constructs six locker rooms (4-team, 1-female, 1-referee) at the Kenai Multi-
purpose Facility. This would include utilities, bathrooms, shower rooms, and related
appurtenances. Approx. 5,000 SF. The Facility was designed to an ultimate "build -out"
which included locker rooms, enhanced seating, building insulation, and heating systems,
etc. Without locker rooms which include showers and other appurtenances, use o f t he
Facility is limited.
PUBLIC SAFETY FACILITY IMPROVEMENT
Department(s): Public Works I Police I Fire
Total Project Cost: $750,000
Project Phased: No
Project Type: Building Improvement
Funding Source(s): Grant Dependent
Potential Grant Identified: State of Alaska
Operating Budget Impact:
Minimal or No Impact .. 2021 2022
COST:
Details:
2023 2024
I
2025
$750,000
34
This project will begin to address the concerns with abatement of asbestos within
the Public Safety Facility while providing improvements to the Facility floorplan to make
the best use of space.
3'2 I GENERAL FUND
22
PERSONAL USE
FISHERY FUND
CITY OF KENAI I
CAPITAL IMPROVEMENT PLAN
FV2021 -2025
49 I PERSONAL USE FISHERY FUND
23
PERSONAL USE FISHERY
FUND FUND PROJECTS
PERSONAL USE FISHERY FLOAT REPLACEMENT
Department: Public Works
Total Project Cost: $150,000
Project Phased: Yes
Project Type: Infrastructure
Funding Source(s): Personal Use Fishery Fund
Potential Grant Identified: None
Operating Budget Impact:
Minimal or No Impact .. 2021
COST: $50,000
Details:
2025
01
This project purchases ten new floats at the City Dock and Boat Ramp to replace existing
floats. There are currently 22 floa t sections in total for the ramp and another eight for
the front of the trestle.
CITY DOCK BOAT RAMP REPLACEMENT
Department: Public Works
Total Project Cost: $125,000
Project Phased: Yes
Project Type: Infrastructure
Funding Source(s): Personal Use Fishery Fund
Potential Grant Identified: None
Operating Budget Impact:
Min imal or No Impact ..
COST:
Details:
02
2024 2025
This project will replace the concrete ramps at the City Dock.
50 I PERSONAL USE FISHERY FUND
24