RESOLUTION NO. 2022-28
Sponsored by: Administration
A RESOLUTION AUTHORIZING AN AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES
FOR THE ROADWAY CAPITAL IMPROVEMENTS PROJECTS.
WHEREAS, a Request for Proposals was released on March 31, 2022 with Proposals due on April 21,
2022 to provide bid ready construction documents for Roadway Capital Improvements on Wildwood Dr.,
N. Willow St., First Ave., and various other miscellaneous sink hole repairs; and,
WHEREAS, Nelson Engineering was the only respondent to the Request for Proposals; and,
WHEREAS, Nelson Engineering has an extensive work history with the City of Kenai and although they
were the only respondent their proposal was found to be responsive and responsible; and,
WHEREAS, the proposed design fees for the requested projects are as follows:
Wildwood Dr.
$35,252
N. Willow St.
$40,905
First Avenue
$25,509
Misc. Sink Hole Repairs
$25,514
Total
$127,180
and,
WHEREAS, funding for these improvements resides within the Municipal Roadway Improvements Capital
Project Fund and the proposed costs are within budgeted amounts; and,
WHEREAS, completion of this work is a high priority for the Public Works Department as these projects
were identified within previous years Capital Improvement Plans; and,
WHEREAS, completion of this work is in the best interest of the City.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA:
Section 1. That the City Manager is authorized to execute a Professional Services Agreement with
Nelson Engineering in the total amount of $127,180 and to issue a Purchase Order in that same amount
plus an additional $20,000 in contingency, $5,000 per project above, to assist in the processing of
potential amendments.
Section 2. That this Resolution takes effect immediately upon passage.
PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, THIS 4TH DAY MAY, 2022.
Brian Gabriel Sr., Mayor
New Text Underlined, [DELETED TEXT BRACKETED]
I ov
�kv KENAI
City of Kenai 1 210 Fidalgo Ave, Kenai, AK 99611-7794 1907.283.75351 wwwkenaixity
MEMORANDUM
TO: Mayor Gabriel and Council Members
THROUGH: Paul Ostrander, City Manager
FROM: Scott Curtin, Director of Public Works
DATE: April 26, 2022
SUBJECT: Resolution 2022-28 — Roadway Capital Improvements
The purpose of this memo is to request Council's approval to award a Professional Services
Agreement to Nelson Engineering to provide bid ready construction documents for roadway
improvements along Wildwood Dr., N. Willow St., First Ave., as well as various other smaller
project areas. This will be the first extensive roadway improvements conducted by the City since
2015 when VIP and First St. projects were developed.
Wildwood Dr. is one of the older roadways within the City and as such is in the poorest condition.
This project will provide for a complete resurfacing from the Kenai Spur Highway toward the
entrance of Wildwood Correctional. Work will include paving of driveway approaches up to the
edge of right of way and expands on the clearing work the Streets Department conducted last
year.
The N. Willow St. project will extend from Granite St. down toward the Forestry Service lot located
at 525 N. Willow. This project is comprised of milling and repaving of roadway surface as well as
improvements to drainage.
The First Avenue project is located between N. Spruce and Birch St. and is intended to resolve
several areas of roadway where the bases has subsided. These areas will be removed with new
base, new concrete curb and gutter and new asphalt surface being applied. Other areas will
simply be milled and paved.
The misc. sink hole repairs cover a variety of smaller locations where the roadway has settled.
These areas will be removed with the base material restored and new asphalt surfacing applied.
Approximately a dozen of these locations will be addressed with this work.
It is the department's hope and intention to complete Wildwood Dr. and the misc. repairs late this
summer. N. Willow and First Ave will have a completed project design with the intent of bidding
over the winter months with construction taking place starting May/June 2023.
Council can expect engineer's cost estimates for Construction being provided with the bid ready
documents. If it is determined additional funding may be necessary it will be brought forth with
additional legislation at that time.
Council's support for these projects is respectfully requested