HomeMy WebLinkAbout2022-11-16 Council Packet - Joint Work Session• / Kenai City Council Joint Work Session - FY2024-2028 Capital Improvement Plan November 16, 2022 — 4:45 PM KEN A I Kenai City Council Chambers 210 Fidalgo Avenue, Kenai, Alaska "Telephonic/Virtual Information Below** www.kenai.city Agenda A. CALL TO ORDER B. INTRODUCTION — City Manager Ostrander C. DISCUSSION ITEM 1. City of Kenai Fiscal Year 2024-2028 Capital Improvement Plan D. PUBLIC COMMENTS E. ADJOURNMENT Join Zoom Meeting https://us02web.zoom. us/i/89664559311 Meeting ID: 896 6455 9311 Passcode: 290589 OR Dial In: (253) 215-8782 or (301) 715-8592 Meeting ID: 896 6455 9311 Passcode: 290589 Kenai City Council Joint Work Session - Page 1 of 1 FY2024-2028 Capital Improvement Plan November 16, 2022 1 L I000, City of Kenai MEMORANDUM K E N 4 210 Fidalgo Ave, Kenai, AK 99611-7794 1907.283.75351 www.kenai.city TO: Mayor Gabriel and Council Members THROUGH: Paul Ostrander, City Manager FROM: Scott Curtin, Director of Public Works DATE: November 9, 2022 SUBJECT: Capital Improvement Plan 2024-2028 The purpose of this memo is to introduce Council to the draft copy of the Updated Capital Improvement Plan 2024-2028. This document summarizes the coordination between all departments and commissions in an effort to identify priority projects for Council consideration. The spreadsheet identifies projects which the department is seeking grant assistance for, and the likely corresponding City share that would be required. These projects are highlighted in green. Council can expect to see the more formal document with photos and detailed project descriptions presented at the Special Work Session as a laydown. The document remains a work in progress as of the date of this memo. I will be available at the Work Session and Council Meeting to address any questions or concerns Council may have. Council's review and consideration of the plan is respectfully requested. K 4 KE N A I' FISCAL YEARS The Best Place To ALASKA V HM[piravemain TR((n:93)hn 2024 City of Kenai City Hall I 210 Fidalgo Avenue Kenai, AK 99611 Paul Ostrander 2028 City Manager POSTRAN DER@ KENAI.CITY 907.283.8222 **Draft Copy for Review November 8, 2022** Scott Curtin Public Works Director SCURTIN@KENAI.CITY 907.283.8236 3 City- Dept. Wide Fund Project Priority Priority Priority No. No. No. Project Name FY2024 FY20251FY2027 FTY28 Total Expense Airport Fund Grant City Grant City Grant City Grant City Grant City Runway 2L/20R (Rehabilitation/Reconstruction) $22,299,052 $1,486,603 $ 23,785,655 Terminal Elevator Major Maintenance $50,000 $ 50,000 ARFT Elevator Major Maintenance $50,000 $ 50,000 Airport Master Plan Update $703,125 $46,875 750,000 Taxiways A, C, K, L (Rehabilitation/Reconstruction) $10,489,089 $699,273 $ 11,188,362 Aircraft Rescue Firefighting Vehicle (15 yr. MUL) $937,500 $62,500 $ 1,000,000 TWY J and Willow St. Extension (EA/Survey/Design) $1,406,250 $93,750 $ 1,500,000 TWY J and Willow St. Extension (Construction) $9,375,000 $625,000 $ 10,000,000 Terminal Road and Parking Lot Improvements $3,250,000 $3,250,000 $ 6,500,000 ARFT Fire Training Apparatus Repairs $100,000 $ 100,000 Float Plane Basin Phase 1 $4,687,500 $312,500 5,000,000 Total Airport Fund $24,635,655 $13,688,362 $10,000,000 $6,600,000 $5,000,000 $59,924,017 Total Grant Share $23,002,177 $12,832,839 $9,375,000 $3,250,000 $4,687,500 $53,147,516 Total City Share $1,633,478 $855,523 $625,000 $3,350,000 $312,500 $6,776,501 City- Dept. Wide Fund Project Priority Priority Priority Project Name FY20241 126 FY2027 FTY28 Total• General Fund Grant City Grant City Grant City Grant City Grant City AD Bluff Stabilization Construction $32,750,000 $2,250,000 $ 35,000,000 CL Clerks Office Records Vault $80,000 80,000 PW Lilac Street Rehabilitation - Design $100,000 $ 100,000 PW City Hall Elevator Major Maintenance $50,000 $ 50,000 PR Softball Green Strip Play Equipment Replacement $68,000 $17,000 $ 85,000 PR Shelter #3 Replacement at Municipal Park $75,000 $ 75,000 PR Convert Multi -Purpose Facility & Rec Center to LED Light $100,000 $ 100,000 PR Hazardous Tree Removal - various park areas $200,000 $50,000 $ 250,000 PR Repair & Refinish of Rec Ceenter Gym Floors $75,000 $ 75,000 PW Aliak Storm water and paving repair - Design $80,000 $ 80,000 PW Public Mainwalk Replacements & ADA Warning - Design $42,400 $10,600 $ 53,000 PW Roadway Crack Sealing & Traffic Markings $370,400 $92,600 $ 463,000 PW Youth Corridor Pedestrian & Roadway Improvements - Des $440,000 $110,000 $ 550,000 PW Public Mainwalk Replacements & ADA Warning - Constr. $488,000 $122,000 $ 610,000 PW Youth Corridor Pedestrian & Roadway Improvements - Con $4,930,000 $870,000 $ 5,800,000 PW Lilac Street Rehabilitation - Construction $700,000 $ 700,000 PW Aliak Storm water and paving repair - Construction $400,000 $ 400,000 PW Storm water CCTV Inspections $80,000 $ 80,000 City- Dept. Wide Fund Project Priority Priority Priority No. No. No. Project Name FY2024 FY2025 FY2026 FY2027 FTY28 Total Expense General Fund Continued Grant City Grant City Grant City Grant City Grant City PW Flight Services RTU Replacements $350,000 $ 350,000 LB Library Siding Improvements $90,000 $ 90,000 PR Old Town Playground Equipment Replacement $100,000 $25,000 $ 125,000 PR Replace Green Strip Pavilion $175,000 $ 175,000 PR Parking Lot and ADA accessible sidewalks at green strip $150,000 $ 150,000 PW Street Lighting Improvements - Design $90,000 $ 90,000 PW Street Lighting Improvements - Construction $400,000 $ 400,000 PW Future Stormwater Improvements $120,000 $ 120,000 PR Scout Park Construct New Pavilion $50,000 50,000 PR Beaver Creek Replace Pavilion $50,000 $ 50,000 PD/FD Emergency Services Facility Improvement - Design $150,000 $ 150,000 PD/FD Emergency Services Facility Improvement - Construction $800,000 $200,000 $ 1,000,000 PW Facility Improvements to be identified $500,000 $ 500,000 PW Future Road Repairs $500,000 $ 500,000 PW Future Stormwater Improvements $120,000 $ 120,000 PW Facility Improvements to be identified $500,000 $ 500,000 PW Future Road Repairs $500,000 $ 500,000 PR Relocation of Parks & Rec to Daubenspeck $2,400,000 $600,000 $ 3,000,000 $ - Total General Fund $36,961,000 $8,570,000 $770,000 $2,120,000 $4,000,000 $52,421,000 Total Grant Share $33,870,800 $5,518,000 $0 $800,000 $2,400,000 $42,588,800 Total City Share $3,090,200 $3,052,000 $770,000 $1,320,000 $1,600,000 $9,832,200 City- Dept. Wide Fund Project Priority Priority Priority No. No. No. Project Name FY2024 FY2025 FY2026 FY2027 FTY28 Total Expense Water & Sewer Fund Grant City Grant City Grant City Grant City Grant City Water / WTP WTP Pumphouse Construct $ 960,000.00 $ 240,000.00 $ 1,200,000 Airport Res Pump House Improvements Design $ 300,000.00 $ 300,000 Disinfectant Generation Equipment Design $ 50,000.00 $ 50,000 Service Body Operators Truck (Split between W&S) $ 75,000.00 $ 75,000 Utility Manager Truck 1/2 Ton (Split between W&S) $ 35,000.00 $ 35,000 Wheel Loader & Attachments (Split between W&S) $ 100,000.00 $ 100,000 Airport Res Pump House Improvements Construct $ 960,000.00 $ 240,000.00 $ 1,200,000 Disinfectant Generation Equipment Construct $ 250,000.00 $ 250,000 Operators Truck 1/2 Ton (Split between W&S) $ 30,000.00 $ 30,000 GIS Mapping Improvements $ 100,000.00 $ 100,000 City- Dept. Wide Fund Project Priority Priority Priority No. No. No. Project Name FY2024 FY2025 FY2026 FY2027 FTY28 Total Expense Water & Sewer Fund Continued Grant City Grant City Grant City Grant City Grant City WTP Fencing Improvements $ 100,000.00 $ 100,000 Operators Truck 3/4 Ton Plow (Split between W&S) $ 40,000.00 $ 40,000 Water Main Valve Replacements 1 $ 160,000.00 $ 160,000 Water Main Line Improvements 1 $ 250,000.00 $ 250,000 Water Meter / Software Equipment $ 100,000.00 $ 100,000 Airport Reservoir Tank Exterior Assessment $ 30,000.00 $ 30,000 Major Wellhead Maintenance 1 $ 100,000.00 $ 100,000 Airport Reservoir Tank Exterior Repair $ 270,000.00 $ 270,000 Water Main Valve Replacements 11 $ 160,000.00 $ 160,000 Sewer / WWTP $ - Digestor Blower Construction $ 2,900,000.00 $ - $ 2,900,000 Broad Street Lift Station Renovation $ 480,000.00 $ 120,000.00 $ 600,000 WWTP Operations Bldg Renovations Design $ 300,000.00 $ 300,000 Disinfectant Generation Equipment Design $ 50,000.00 $ 50,000 Service Body Operators Truck (Split between W&S) $ 75,000.00 $ 75,000 Utility Manager Truck 1/2 Ton (Split between W&S) $ 35,000.00 $ 35,000 Wheel Loader & Attachments (Split between W&S) $ 100,000.00 $ 100,000 WWTP Operations Bldg Renovations Construct $ 1,824,000.00 $ 456,000.00 $ 2,280,000 Disinfectant Generation Equipment Construct $ 250,000.00 $ 250,000 Major Lift Station Renovations $ 400,000.00 $ 400,000 Standby Power Upgrades $ 200,000.00 $ 200,000 WWTP Rotary Screen Replacement Design $ 300,000.00 $ 300,000 Operators Truck 1/2 Ton (Split between W&S) $ 30,000.00 $ 30,000 WWTP Rotary Screen Replacement Construct $ 1,160,000.00 $ 290,000.00 $ 1,450,000 WWTP Fencing Improvements $ 100,000.00 $ 100,000 WWTP SCADA Integration $ 500,000.00 $ 500,000 WWTP Effluent Flow Monitoring / Auto Dosing $ 225,000.00 $ 225,000 Operators Truck 3/4 Ton Plow (Split between W&S) $ 40,000.00 $ 40,000 GIS Mapping Improvements $ 100,000.00 $ 100,000 WWTP Influent Pump Station $ 800,000.00 $ 200,000.00 $ 1,000,000 CCTV Equipment $ 75,000.00 $ 75,000 Vac Truck $ 500,000.00 $ 500,000 $ - Total Water Sewer Fund $5,820,000 $4,940,000 $2,815,000 $1,555,000 $930,000 $16,060,000 Total Grant Share $4,340,000 $2,784,000 $1,160,000 $800,000 $0 $9,084,000 Total City Share $1,480,000 $2,156,000 $1,655,000 $755,000 $930,000 $6,976,000 City- Dept. Wide Fund Project Priority Priority Priority No. No. No. Project Name FY2024 FY2025 FY2026 FY2027 FTY28 Total Expense Senior Citizens Fund Grant City Grant City Grant City Grant City Grant City Senior Center Landscaping Project Phase 1 $40,000 $ 40,000 Senior Center Landscaping Project Phase II $35,000 $ 35,000 Total Senior Citizens Fund $0 $40,000 $35,000 $0 $0 $75,000 Total Grant Share $0 $0 $0 $0 $0 $0 Total City Share $0 $40,000 $35,000 $0 $0 $75,000 Congregate Housing Grant City Grant City Grant City Grant City Grant City Apartment Kitchen and Bathroom Remodel $100,000 $100,000 $100,000 $ 300,000 Vintage Point Backup Generator $100,000 $ 100,000 Vintage Point Elevator Major Maint. $50,000 $ 50,000 Total Congregate Housing Fund $150,000 $100,000 $100,000 $100,000 $0 $450,000 Total Grant Share $0 $0 $0 $0 $0 $0 Total City share $150,000 $100,000 $100,000 $100,000 $0 $450,000 PU Fishery Fund Grant City Grant City Grant City Grant City Grant City Boat Ramp Concrete Repairs $135,000 $ 135,000 $ Total PU Fishery Fund $135,000 $0 $0 $0 $0 $135,000 Total Grant Share $135,000 $0 $0 $0 $0 $135,000 Total City Share $0 $0 $0 $0 $0 $0 Summary Total of All Funds $67,701,655 $27,338,362 $13,720,000 $10,375,000 $9,930,000 129,065,017 Total of All Grant Shares $61,347,977 $21,134,839 $10,535,000 $4,850,000 $7,087,500 $104,955,316 Total of All City Shares $6,353,678 $6,203,523 $3,185,000 $5,525,000 $2,842,500 $24,109,701 NOVEMBER 16, 2022 CITY COUNCIL WORK SESSION ADDITIONAL MATERIAL/REVISIONS REQUESTED ADDITIONS TO THE PACKET: ACTION ITEM REQUESTED BY Add to item C.1. City of Kenai Fiscal Year 2024-2028 Capital Improvement Plan • Draft FY2024-2028 Capital Improvement Administration Plan K N AI Ttie Best Place To aLas Kn �I(I(Il��llj`(i]� `III(L�UllLI!� 'L��;II11 FISCAL YEARS 2024 - 2028 CITY OF KENAI PAUL OSTRANDER SCOTT CURTIN CITY HALL CITY MANAGER PUBLIC WORKS DIRECTOR 210 FIDALGO AVENUE POSTRANDER@KENAI.CITY SCURTIN@KENAI.CITY KENAI, AK 99611 907-283-8222 907-283-8236 ***DRAFT COPYNOVEMBER 15, 2022*** Page 1 of 63 TABLE OF CONTENTS Page 3 INTRODUCTION Page 5 AIRPORT FUND Page 13 GENERAL FUND Page 31 WATER & SEWER FUND Page 51 SENIOR CITIZENS FUND Page 55 CONGREGATE HOUSING FUND Page 59 PERSONAL USE FISHERY FUND Page 2 of 63 INTRODUCTION The City of Kenai's five-year Capital Improvement Plan (CIP) is developed by the Public Works Department in coordination with City departments, Administration, Boards and Commissions, and the City Council for the purpose of long-range capital improvement planning and budgeting. A capital improvement project is typically a one-time expenditure, usually, in excess of $35,000, that has a useful life exceeding one year or is a major project such as a comprehensive or master plan. Capital projects on existing assets are included in the CIP, provided they meet the definition of a capital project. Projects can focus on immediate needs or anticipate future needs before critical failures and are developed based on an internal process that determines funding availability and infrastructure needs. The CIP is divided into six parts based on the City Fund for which the project would be accounted. These include the Airport Fund, General Fund, Water & Sewer Fund, Senior Citizens Fund, Congregate Housing Enterprise Fund, and Personal Use Fishery Fund. Projects are not necessarily listed in priority order for each Fund by fiscal year. Active projects that have been funded in prior years are not included in the Plan. Projects that are identified in the CIP are included for planning purposes and to recognize a need. Not all projects receive the necessary funding to accomplish them in a projected year, which is why the list is updated annually. Many projects are dependent on non -City funding sources, which the City can expect to seek, but are not guaranteed. The availability of outside funds can vary with local, state, and federal economies, and the City's needs can, and do, change frequently. Page 3 of 63 Blank Page 4 of 63 Airport Fund FY2024 No ProjectGrant Runway 2L/20R Rehabilitation .. Project1 $23,785,655 $22,299,052 $1,486,603 2 Terminal Elevator Major Maintenance $50,000 $50,000 3 ARFT Elevator Major Maintenance $50,000 $50,000 4 Airport Master Plan Update $750,000 $703,125 $46,875 Totals $24,635,655 $23,002,177 $1,633,478 FY2025 No ProjectGrant .. Project Funding 5 Taxiways A, C, K, L Rehabilitation $11,188,362 $10,489,089 $699,273 Aircraft Rescue Firefighting Vehicle 6 (15 yr. MUL) $1,000,000 $937,500 $62,500 TWY J and Willow St. Extension 7 (EA/Survey/Design) $1,500,000 $1,406,250 $93,750 Totals $13,688,362 $12,832,839 $855,523 IW, ►KIM FY2027 Page 5 of 63 FY2028 Page 6 of 63 AIRPORT FUND PROJECTS RUNWAY 2L/20R REHABILITATION :i Department: Airport Total Project Cost: $23,785,655 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Grant Dependent Potential Grant Identified: Federal Aviation Administration Operating Budget Impact: Slight Decrease 0 L YEAR: 2024 2025 2026 2027� 2028 • Details: This project will rehabilitate Runway 2L/20R to current standards. The project will reduce crack sealing maintenance costs and bring the oldest pavement in the Airport up to the recommended Pavement Condition Index. TERMINAL ELEVATOR MAJOR MAINTENANCE Department: Airport Total Project Cost: $50,000 Project Phased: No Project Type: Building Improvement Funding Source(s): Grant Dependent Potential Grant Identified: Federal Aviation Admin Operating Budget Impact: Minimal or No Impact MAINTENANCE IN PROGRESS Details: Provide major maintenance on the existing Airport Terminal Elevator. This maintenance will replace 30-plus-year-old components for safety reasons while providing minor cosmetic improvements. Page 7 of 63 AIRPORT FUND PROJECTS ALASKA REGIONAL FIRE TRAINING (ARFT) ELEVATOR MAJOR MAINTENANCE Department: Airport Total Project Cost: $50,000 Project Phased: No Project Type: Building Improvement Funding Source(s): Airport Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact CAUTION MAINTENANCE IN PROGRESS Details: Provide major maintenance on the existing Alaska Regional Fire Training Facility's elevator. The facility is currently primarily occupied by Beacon. The facility was constructed in 1997, and while the elevator sees relatively minimal use, this project will provide for the continued safe operation of the unit. AIRPORT MASTER PLAN UPDATE Department: Airport Total Project Cost: $750,000 Project Phased: No Project Type: Funding Source(s): Airport Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact Details: Airport Master Plans are typically updated every 5-7 years, with ENA's current Master Plan finalized in 2017. This document is a requirement from the Federal Aviation Administration (FAA) to support the continued growth and operation of the Airport. It is a planning document that assists the City and FAA with project development. Page 8 of 63 AIRPORT FUND PROJECTS TAXIWAYS A,C,K, & L REHABILITATE--= - Department: Airport = Total Project Cost: $11,188,362 Project Phased: Yes Project Type: Infrastructure— Funding Source(s): Grant Dependent Potential Grant Identified: Federal Aviation Admin Operating Budget Impact: Slight Decrease = _ f YEAR: 2024 2025 2026 2027 J_ 2028 • Details: This project will rehabilitate Runway taxiways A, C, K, and L to current standards. The project will reduce crack sealing maintenance costs and bring the oldest pavement in the Airport up to the recommended Pavement Condition Index. AIRCRAFT RESCUE FIREFIGHTING VEHICLE REPLACEMENT Department: Airport Total Project Cost: $1,000,000 Project Phased: No Project Type: Equipment r Funding Source(s): Grant Dependent Potential Grant Identified: Federal Aviation Admin Operating Budget Impact: Minimal or No Impact Details: This project will replace an existing 1992 model year Oshkosh TA1500 unit to allow for continued efficient airfield operations and safety standards. Page 9 of 63 AIRPORT FUND PROJECTS TAXIWAY J AND WILLOW STREET EXTENSION (EA/Survey/Design) Department: Airport Total Project Cost: $1,500,000 Project Phased: No Project Type: Land Improvement/ Infrastructure Funding Source(s): Grant Dependent Potential Grant Identified: Federal Aviation Administration Operating Budget Impact: Slight Increase KA YEAR: 2024 2025 2026 J 2027 J 2028 •$1,500,000 Details: This project would extend the apron taxiway 600 feet for lease lots and Willow Street Extension (road and utilities) as well as provide for lease lot development (five acres). Lease lot development is assumed to be 100% City -funded. The City General Fund portion of the project is reflected in the General Fund section. TAXIWAY J AND WILLOW STREET EXTENSION (Construction) Department: Airport Total Project Cost: $10,000,000 Project Phased: No Project Type: Land Improvement/ Infrastructure Funding Source(s): Grant Dependent Potential Grant Identified: Federal Aviation Administration Operating Budget Impact: Slight Increase Details: This project would extend the apron taxiway 600 feet for lease lots and Willow Street Extension (road and utilities) as well as provide for lease lot development (five acres). Lease lot development is assumed to be 100% City -funded. The City General Fund portion of the project is reflected in the General Fund section. Page 10 of 63 AIRPORT FUND PROJECTS TERMINAL ROAD AND PARKING LOT IMPROVEMENTS Department: Airport Total Project Cost: $6,500,000 Project Phased: No Project Type: Infrastructure Funding Source(s): Grant Dependent Potential Grant Identified: Federal Aviation Admin Operating Budget Impact: Slight Increase Details: This project rehabilitates the access road, provides for parking lot expansion to the south, and installs new lighting poles at the Kenai Municipal Airport Terminal parking lot. ALASKA REGIONAL FIRE TRAINING (ARFT) APPARATUS REPAIRS Department: Airport Total Project Cost: $100,000 Project Phased: No Project Type: Technology Funding Source(s): Airport Fund Potential Grant Identified: None Operating Budget Impact: Minimal Details: Planned maintenance to provide for the continued operation of the trainers. This equipment resides in very volatile conditions, with exposure to extreme cold and heat. As a result, many components require preventive maintenance to provide reliable use. Page 11 of 63 AIRPORT FUND PROJECTS FLOAT PLANE BASIN PHASE 1 Department: Airport Total Project Cost: $5,000,000 Project Phased: No Project Type: Technology Funding Source(s): Airport Fund Potential Grant Identified: None Operating Budget Impact: Minimal Details: The development of the Kenai Municipal Airport (ENA) Seaplane Base (SPB) is critical to the growth of the airport. The SPB is fundamental to de -conflicting General Aviation (GA) operations and Commercial Aircraft Operations, it allows for the continued growth of GA to the west and frees up prime commercial aviation property on the east side of the airport and South Airpark. The $5-million project will establish the foundation for the continued growth of the SPB by appropriately connecting the SPB to the main runway, and making several plots available for hangar, tie -down, and other GA services development. Page 12 of 63 General Fund FY2024 No Project Name Bluff Stabilization Construction TotalProject1 $35,000,000 $32,750,000 $2,250,000 2 Clerk's Office Records Vault $80,000 $80,000 3 Lilac Street Rehabilitation - Design $100,000 $100,000 4 City Hall Elevator Major Maintenance $50,000 $50,000 5 Softball Green Strip Playground Equipment Replacement $85,000 $68,000 $17,000 6 Shelter #3 Replacement at Municipal Park $75,000 $75,000 7 Convert Multi -Purpose Facility & Rec Center to LED Light $100,000 $100,000 8 Hazardous Tree Removal - various park areas $250,000 $200,000 $50,000 9 Repair & Refinish of Rec Center Gym Floors $75,000 $75,000 10 Aliak Stormwater and paving repair - Design $80,000 $80,000 11 Public Mainwalk Replacements & ADA Warning - Design $53,000 $42,400 $10,600 12 Roadway Crack Sealing & Traffic Markings $463,000 $370,400 $92,600 13 Youth Corridor Pedestrian & Roadway Improvements - Design $550,000 $440,000 $110,000 Totals $36,961,000 $33,870,800 $3,090,200 FY2025 14 Public Mainwalk Replacements & ADA Warning - Construction $610,000 $488,000 $122,000 15 Youth Corridor Pedestrian & Roadway Improvements - Construction $5,800,000 $4,930,000 $870,000 16 Lilac Street Rehabilitation - Construction $700,000 $700,000 17 Aliak Stormwater and paving repair - Const. $400,000 $400,000 18 Stormwater CCTV Inspections $80,000 $80,000 19 Flight Services RTU Replacements $350,000 $350,000 20 Library Siding Improvements $90,000 $90,000 21 Old Town Playground Equipment Replacements $125,000 $100,000 $25,000 22 Replace Green Strip Pavilion $175,000 $175,000 23 Parking Lot and ADA-accessible sidewalks at green strip $150,000 $150,000 24 Street Lighting Improvements - Design $90,000 $90,000 Page 13 of 63 Orproject Name M��� ■ •$8,570,000 $5,518,000 $3,052,000 FY2026 No 25 Project Name Street Lighting Improvements - Construction Total Project Cost $400,000 Funding City Funding $400,000 26 Future Stormwater Improvements $120,000 $120,000 27 Scout Park Construct New Pavilion $50,000 $50,000 28 Beaver Creek Replace Pavilion $50,000 $50,000 29 Emergency Services Facility Improvement - Design $150,000 $150,000 Totals $770,000 $0 $770,000 FY2027 or 30 ProjectI Emergency Services Facility Improvement - Construction $1,000,000 Grant $800,000 w $200,000 31 Facility Improvements to be identified $500,000 $500,000 32 Future Road Repairs $500,000 $500,000 33 Future Stormwater Improvements $120,000 $120,000 Totals $2,120,000 $800,000 $1,600,000 FY2028 Page 14 of 63 GENERAL FUND PROJECTS BLUFF STABILIZATION Department: Administration I Public Works Total Project Cost: $35,000,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Grant Dependent I Bonding Potential Grant Identified: State Capital Project Submission and Federal Grants To Be Identified Operating Budget Impact: Slight Increase COST: $35,000,000 Details: The City of Kenai in coordination with the Army Corp of Engineers Bluff Erosion Control Project is intended to stabilize an area on the northern bank of the Kenai River from near the river's mouth below Historic Old Town extending upriver approximately one mile toward the first cannery just below Bluff Overlook Park at the end of Spur View Drive. CLERK'S OFFICE RECORDS VAULT Department: Clerks Office Total Project Cost: $80,000 Project Phased: No Project Type: Building Improvement Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: Minimal Details: This project will provide long term file storage solutions for the Clerk's Office at City Hall by optimizing existing file storage space while providing improved file security. Page 15 of 63 GENERAL FUND PROJECTS LILAC STREET REHABILITATION (DESIGN) Department: Public Works - ;s Total Project Cost: $100,000 - �— Project Phased: Yes Project Type: Infrastructure Funding Source(s): General Fund Potential Grant Identified: None' Operating Budget Impact: Slight Increase AR: 24 JIM5 .�6 Details: This project replaces the failed concrete curb in affected areas, re -stabilizes settled subbase areas, and provides a new asphalt surface course along approximately 1600 linear feet of 30-foot wide roadway. Lilac Lane is located off the Spur Highway and Cook Inlet View Drive on the north side of Kenai. The roadway and concrete curb and gutter are suffering from the severe settlement in multiple areas. CITY HALL ELEVATOR MAJOR MAINTENANCE Department: Public Works Total Project Cost: $50,000 Project Phased: No Project Type: Building Improvement Funding Source(s): General Fund Operating Budget Impact: Minimal or No Impact WEARW��� EW2026 2027 202 • • eI Details: This project provides major maintenance on the existing City Hall Elevator. This will replace 30+-year-old components for safety purposes while providing minor cosmetic improvements. Page 16 of 63 GENERAL FUND PROJECTS SOFTBALL GREEN STRIP PLAYGROUND EQUIPMENT REPLACEMENT Department: Parks and Recreation Total Project Cost: $85,000 Project Phased: No Project Type: Equipment Funding Source(s): Grant Dependant / General Fund Potential Grand Identified: None Operating Budget Impact: Minimal or No Impact we COST: $85,000 Details: This project replaces an aging and obsolete children's playground located at one of the most heavily used outdoor locations. This area is near the adult softball fields and adjacent to a large green strip with a shelter and restrooms. SHELTER #3 REPLACEMENT AT MUNICIPAL PARK Department: Parks and Recreation Total Project Cost: $75,000 Project Phased: No Project Type: Building Funding Source(s): General Fund Potential Grand Identified: None Operating Budget Impact: Minimal or No Impact COST: $75,000 Details: This project will replace a deteriorating existing structure with new. Page 17 of 63 GENERAL FUND PROJECTS CONVERT MULTI -PURPOSE FACILITY & REC CENTER TO LED LIGHTING Department: Parks and Recreation Total Project Cost: $100,000 Project Phased: No Project Type: Building Improvement Funding Source(s): General Fund Operating Budget Impact: Decrease I COST: $100,000 Lighting Details: This project will improve lighting at both facilities with anticipated reductions in utility and maintenance costs. HAZARDOUS TREE REMOVAL IN VARIOUS PARK AREAS Department: Parks and Recreation Total Project Cost: $250,000 Project Phased: No Project Type: Funding Source(s): Grant Dependent I Bonding Potential Grant Identified: State Capital Project Submission and Federal Grants To Be Identified Operating Budget Impact: Minimal to No Impact COST: $250,000 Details: This project will continue with tree hazard mitigation services. Parks & Rec and Public Works staff continue to remove trees in accessible areas, this project will assist the City in higher risk areas. Page 18 of 63 GENERAL FUND PROJECTS REPAIR & REFINISH OF REC CENTER GYM FLOORS Department: Parks and Recreation Total Project Cost: $75,000 Project Phased: No Project Type: Building Improvement Funding Source(s): General Fund Operating Budget Impact: Slight Increase Details: This project will repair water damaged wood plank gym floors, new markings and final sealing of the gym floor. ALIAK STORM WATER & PAVING REPAIR (DESIGN) Department: Public Works Total Project Cost: $80,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: Slight Increase Details: This project will begin to address a failed stormwater line on Aliak Dr. between Candlelight Dr. and Highbush Ln. The galvanized piping has collapsed in several locations which cause the occasional sinkhole to surface after significant runoff. The photo above is from April 2021 shortly after the breakup. The staff has been filling these in with gravel and then patching the asphalt as a short-term solution. This project will require the removal of sections of the roadway and the replacement of existing stormwater piping with new and then resurfacing of the roadway. Page 19 of 63 GENERAL FUND PROJECTS PUBLIC MAIN WALK REPLACEMENTS & ADA WARNING PADS (DESIGN) Department: Public Works Total Project Cost: $53,000 Project Phased: Yes A Project Type: Infrastructure t �` Funding Source(s): Grant Dependent I Bonding Potential Grant Identified: State Capital Project Submission and Federal Grants To Be Identified Operating Budget Impact: None 4 202 2026 2027 Details: This project will begin to address the numerous cracked public mainwalks in various locations around the City. Intersections will receive ADA stamped indicator pads in yellow. ROADWAY CRACK SEALING & TRAFFIC MARKINGS Department: Public Works Total Project Cost: $463,000 Project Phased: No Project Type: Infrastructure Funding Source(s): Grant Dependent I Bonding Potential Grant Identified: State Capital Project Submission and Federal Grants To Be Identified Operating Budget Impact: None COST: $463,000 Details: This project will hire a contractor to place approximately 150,000#s of Deery Super Stretch crack seal material on numerous City streets. This equates to what the Streets Department performs in house over a five to six year period. New crosswalk and stop bar markings will be re-established as well. Page 20 of 63 GENERAL FUND PROJECTS YOUTH CORRIDOR PEDESTRIAN & ROADWAY IMPROVEMENTS (DESIGN) _ 4 Department: Public Works Total Project Cost: $550,000 Project Phased: Yes , Project Type: Infrastructure F Funding Source(s): Grant Dependent I Bonding Potential Grant Identified: State Capital Project - Submission and Federal Grants To Be Identified - Operating Budget Impact: Slight Increase Details: This project seeks to improve safety, visibility & security to families accessing the Kenai Middle School, High School, Challenger Center and Ice Rink. Project extends from the Spur Highway down Tinker Ln. to Lawton Dr. turning west to Walker Ln. Sidewalks, bike lane, Roadway and Street Lighting Improvments are all proposed with the project. PUBLIC MAIN WALK REPLACEMENTS & ADA WARNING PADS (CONSTRUCTION) Department: Public Works Total Project Cost: $610,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Grant Dependent I Bonding Potential Grant Identified: State Capital Project Submission and Federal Grants To Be Identified Operating Budget Impact: Slight Increase Details: This project will begin to address the numerous cracked public mainwalks in various locations around the City. Intersections will receive ADA stamped indicator pads in yellow. Page 21 of 63 GENERAL FUND PROJECTS YOUTH CORRIDOR PEDESTRIAN & ROADWAY IMPROVEMENTS (CONSTRUCTION) Department: Public Works Total Project Cost: $5,800,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Grant Dependent I Bonding Potential Grant Identified: State Capital Project Submission and Federal Grants To Be Identified Operating Budget Impact: Moderate Increase 4 202 2026 2027 qq��� • Details: This project seeks to improve safety, visibility & security to families accessing the Kenai Middle School, High School, Challenger Center and Ice Rink. Project extends from the Spur Highway down Tinker Ln. to Lawton Dr. turning west to Walker Ln. Sidewalks, bike lane, Roadway and Street Lighting Improvments are all proposed with the project. LILAC STREET REHABILITATION (CONSTRUCTION) Department: Public Works Total Project Cost: $700,000 Project Phased: No Project Type: Infrastructure Funding Source(s): General Fund Operating Budget Impact: Moderate Increase WYEARW��� M 2026 2027 IT= • �I We• Details: This project replaces the failed concrete curb in affected areas, re -stabilizes settled subbase areas, and provides a new asphalt surface course along approximately 1600 linear feet of 30-foot wide roadway. Lilac Lane is located off the Spur Highway and Cook Inlet View Drive on the north side of Kenai. The roadway and concrete curb and gutter are suffering from the severe settlement in multiple areas. Page 22 of 63 GENERAL FUND PROJECTS ALIAK STORM WATER & PAVING REPAIR (CONSTRUCTION) Department: Public Works Total Project Cost: $400,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: Slight Decrease COST: $400,000 Details: This project will begin to address a failed stormwater line on Aliak Dr. between Candlelight Dr. and Highbush Ln. The galvanized piping has collapsed in several locations which cause the occasional sinkhole to surface after significant runoff. The photo above is from April 2021 shortly after the breakup. The staff has been filling these in with gravel and then patching the asphalt as a short-term solution. This project will require the removal of sections of the roadway and the replacement of existing stormwater piping with new and then resurfacing of the roadway. STORMWATER CCTV INSPECTIONS Department: Public Works Total Project Cost: $80,000 Project Phased: No Project Type: Infrastructure Funding Source(s): General Fund Operating Budget Impact: None W'YARW��� 2025 2027 20 • :1 off Details: This project is intended to provide insight into the existing condition of forty -fifty -year - old stormwater conveyance piping. The system is currently poorly mapped and multiple areas within the city have experienced issues with rusting and deteriorating piping and pipe connections which result in sinkholes and pipe failures. Information gathered will be used to direct future repair projects. Page 23 of 63 GENERAL FUND PROJECTS FLIGHT SERVICES RTU REPLACEMENTS Department: Public Works Total Project Cost: $350,000 Project Phased: No Project Type: Building Improvement Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: Moderate Increase COST: $350,000 Details: This is a planned replacement project for air handling units reaching the end of their useful life. This work will provide for the efficient and reliable function of HVAC systems at the facility currently being leased by the Federal Aviation Administration (FAA). LIBRARY SIDING IMPROVEMENTS Department: Library Total Project Cost: $90,000 Project Phased: No Project Type: Building Improvement Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: Slight Increase NEW- ��W 2026 2027 2028 90 • •1 f$$ Details: This project is intended to improve the exterior appearance of the older sections of the existing library. Covering up the CMU block to look similar to the newer addition. Page 24 of 63 GENERAL FUND PROJECTS OLD TOWN PLAYGROUND EQUIPMENT REPLACEMENTS Department: Parks and Recreation Total Project Cost: $125,000 Project Phased: No Project Type: Equipment Funding Source(s): Grant Dependent I Bonding Potential Grant Identified: State Capital Project Submission and Federal Grants To Be Identified Operating Budget Impact: Minimal to No Impact 1 6- COST: $125,000 Details: This project will replace aging equipment at the Park on Peninsula Ave adjacent to the Fine Arts Center. The area of Old Town attracts numerous visitors every year. The park is located two blocks from the Visitor's Center and is in close proximity to several large housing complexes providing plenty of children to utilize the park. REPLACE THE GREEN STRIP PAVILION Department: Parks and Recreation Total Project Cost: $175,000 Project Phased: No Project Type: Building Improvement Funding Source(s): General Fund Operating Budget Impact: Slight Increase YEAR: 2026'700005MMMMMM" 2027 202 Details: This pavilion is generally our largest one, capable of holding the most people. As such it is one of the most rented pavilion's generating some income for the Parks Department. This project will provide a new structure, and is expected to be well used by the community. Page 25 of 63 GENERAL FUND PROJECTS PARKING LOT & ADA ACCESSIBLE SIDEWALKS AT GREEN STRIP Department: Parks and Recreation Total Project Cost: $150,000 Project Phased: No Project Type: Infrastructure Funding Source(s): General Fund Operating Budget Impact: Slight Increase R: 4 2025 2027 Details: This project will provide off street parking with ADA Accessible spaces to improve safe access to park facilities. STREET LIGHTING IMPROVEMENTS (DESIGN) Department: Public Works Total Project Cost: $90,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): General Fund Potential Grant Identified: DOT Grant Operating Budget Impact: Slight Decrease Details: This project will identify underserved and problem locations for street lighting to improve safety and security for citizens. New lighting will be LED to reduce energy and maintenance costs. This first project will provide for the design and identification of locations to be served. Page 26 of 63 GENERAL FUND PROJECTS STREET LIGHTING IMPROVEMENTS (CONSTRUCTION) Department: Administration I Public Works Total Project Cost: $400,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): General Fund Potential Grant Identified: DOT Grant Operating Budget Impact: Slight Decrease AR: 4 JEF2025 2026 1 • W11 111 Details: This project will identify underserved and problem locations for street lighting to improve safety and security for citizens. New lighting will be LED to reduce energy and maintenance costs. This first project will provide for the design and identification of locations to be served. FUTURE STORMWATER IMPROVEMENTS Department: Public Works Total Project Cost: $120,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): General Fund Operating Budget Impact: Slight Increase now- 2025 202 2027 2028 • o •f$ Details: This project will allow Public Works to continue to address stormwater runoff, culvert, and catch basin issues as they continue to deteriorate throughout the City. Page 27 of 63 GENERAL FUND PROJECTS SCOUT PARK CONSTRUCT A NEW PAVILION Department: Parks and Recreation Total Project Cost: $50,000 Project Phased: No Project Type: Building Funding Source(s): General Fund Operating Budget Impact: Slight Increase W* 0 V- Fw r � at R: 4 2025 M` 2026 "7��� Details: Construct a new pavilion at the Erik Hansen Scout Park overlooking the bluff and the Kenai River. Park is located on Mission Ave near the Upland St. intersection. BEAVER CREEK PARK REPLACEMENT PAVILION Department: Parks and Recreation Total Project Cost: $50,000 Project Phased: No Project Type: Building Funding Source(s): General Fund Operating Budget Impact: Slight Increase COST: $50,000 Details: Construct a new pavilion at the Beaver Creek Park located just off the Spur Highway on Parkside Dr. Page 28 of 63 GENERAL FUND PROJECTS EMERGENCY SERVICES FACILITY IMPROVEMENT (DESIGN) Department: Police Department/Fire Department Total Project Cost: $150,000 Project Phased: No Project Type: Facility Improvement Funding Source(s): General Fund; Operating Budget Impact: Slight Increase AR: �24 1�5 2026 1 Details: This project will provide much -needed renovations to the facility. The building is known to have asbestos which has limited opportunities for smaller renovations. This project will identify hazards, provide a code assessment of the facility, and make modifications as appropriate. EMERGENCY SERVICES FACILITY IMPROVEMENT (CONSTRUCTION) Department: Police Department/Fire Department Total Project Cost: $1,000,000 Project Phased: No Project Type: Facility Improvement Funding Source(s): Grant Dependant / General Fund Potential Grant Identified: Department of Homeland Security Operating Budget Impact: Minimal COST: $1,000,000 Details: This project will provide much -needed renovations to the facility. The building is known to have asbestos which has limited opportunities for smaller renovations. This project will identify hazards, provide a code assessment of the facility, and make modifications as appropriate. Page 29 of 63 GENERAL FUND PROJECTS FACILITY IMPROVEMENTS TO BE IDENTIFIED Department: Public Works Total Project Cost: $500,000 Project Phased: Yes Project Type: Facility Improvements Funding Source(s): General Fund Potential Grant Identified: TBD Operating Budget Impact: TBD 4 MWM5 ME 2026 M�. 2027 • sell Details: This project provides facility improvements to be identified and based on a facility assessment for City buildings that looks at each part of a building's infrastructure and reports system conditions, code deficiencies, and functional effectiveness. FUTURE ROAD REPAIRS Department: Public Works Total Project Cost: $500,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): General Fund Potential Grant Identified: TBD Operating Budget Impact: TBD RESURFACING WORK IN PROGRESS COST: $500,000 Details: The Public Works Department continues to monitor roadways. Staff continues to utilize the 2009 Roadway Improvement Survey that reviewed and graded all City Roads at that time. Roadway conditions and traffic demand determine which roads receive priority. Funding may be used for capping of existing gravel roadways, replacement of existing asphalt through milling and paving, as well as point repairs for specific smaller areas experiencing sub -base failures. Page 30 of 63 GENERAL FUND PROJECTS FUTURE STORMWATER IMPROVEMENTS Department: Public Works Total Project Cost: $120,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): General Fund Operating Budget Impact: Slight Increase R: -ONE 4 2025 2027 Details: This project will allow Public Works to continue to address stormwater runoff, culvert, and catch basin issues as they continue to deteriorate throughout the City. FACILITY IMPROVEMENTS TO BE IDENTIFIED Department: Public Works Total Project Cost: $500,000 Project Phased: Yes Project Type: Facility Improvements Funding Source(s): General Fund Potential Grant Identified: TBD Operating Budget Impact: TBD L2025 jdIff 2026 2027 An 2028 • 1• ••f Details: This project provides facility improvements to be identified and based on a facility assessment for City buildings that looks at each part of a building's infrastructure and reports system conditions, code deficiencies, and functional effectiveness. Page 31 of 63 GENERAL FUND PROJECTS FUTURE ROAD REPAIRS Department: Public Works Total Project Cost: $500,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): General Fund Potential Grant Identified: TBD Operating Budget Impact: TBD RESURFACING WORK IN PROGRESS MEN IL or— YEA =ate Details: The Public Works Department continues to monitor roadways. Staff continues to utilize the 2009 Roadway Improvement Survey that reviewed and graded all City Roads at that time. Roadway conditions and traffic demand determine which roads receive priority. Funding may be used for capping of existing gravel roadways, replacement of existing asphalt through milling and paving, as well as point repairs for specific smaller areas experiencing sub -base failures. RELOCATION OF PARKS & REC TO DAUBENSPECK Department: Parks and Recreation Total Project Cost: $3,000,00 Project Phased: Yes Project Type: Department Relocate Funding Source(s): Grant Dependent I Bonding Potential Grant Identified: State Capital Project Submission and Federal Grants To Be Identified Operating Budget Impact: Moderate Increase COST: $3,000,000 Details: This project will relocate Park & Rec facilities from their current location at 332 Airport Way over to 550 Daubenspeck where the Streets, Shop, and Building Maintenance division currently reside. A new building including garage and office space shall be provided. Page 32 of 63 Water & Sewer Fund FY2024 No 1 Project Name WTP Pump house Construct Total Project Cost $1,200,000 Grant Funding $960,000 City Funding $240,000 2 Airport Res Pump House Improvements Design $300,000 $300,000 3 Disinfectant Generation Equipment Design $100,000 $100,000 4 Service Body Operators Truck (Split between Water &Sewer) $150,000 $150,000 5 Utility Manager Truck 1/2 Ton (Split between Water &Sewer) $70,000 $70,000 6 Wheel Loader & Attachments (Split between Water &Sewer) $200,000 $200,000 7 Digester Blower Construction $2,900,000 $2,900,000 8 Broad Street Lift Station Renovation $600,000 $480,000 $120,000 9 WWTP Operations Bldg Renovations Design $300,000 $300,000 Totals $5,820,000 $4,340,000 $1,480,000 FY2025 No Project Name Airport Res Pump House Improvements Construct TotalProject10 $1,200,000 Grant $960,000 $240,000 11 Disinfectant Generation Equipment Construct $500,000 $250,000 12 Operators Truck 1/2 Ton (Split between Water &Sewer) $60,000 $60,000 13 WWTP Operations Bldg Renovations Construct $2,280,000 $1,824,000 $456,000 14 Major Lift Station Renovations $400,000 $400,000 15 1 Standby Power Upgrades $200,000 $200,000 16 WWTP Rotary Screen Replacement Design $300,000 $300,000 Totals $4,940,000 $2,784,000 $2,156,000 Page 33 of 63 FY2026 No 17 Project Name= GIS Mapping Improvements (Split between Water & Sewer) TotalProject $200,000 Grant $200,000 18 WTP Fencing Improvements $100,000 $100,000 19 Operators Truck 3/4 Ton Plow (Split between W&S) $80,000 $80,000 20 Water Main Valve Replacements 1 $160,000 $160,000 21 WWTP Rotary Screen Replacement Construct $1,450,000 $1,160,000 $290,000 22 WWTP Fencing Improvements $100,000 $100,000 23 WWTP SCADA Integration $500,000 $500,000 24 WWTP Effluent Flow Monitoring / Control $225,000 $225,000 Totals $2,815,000 $1,160,000 $1,655,000 FY2027 JWroject 25 Na����� Water Main Line Improvements 1 Total Project Cost $250,000 Grant Funding City Funding $250,000 26 Water Meter / Software Equipment $100,000 $100,000 27 Airport Reservoir Tank Exterior Assessment $30,000 $30,000 28 Major Wellhead Maintenance 1 $100,000 $100,000 29 WWTP Influent Pump Station $1,000,000 $800,000 $200,000 30 CCTV Equipment $75,000 $75,000 Totals $1,555,000 $800,000 $755,000 FY2028 Page 34 of 63 WATER & SEWER PROJECTS WTP PUMP HOUSE (CONSTRUCTION) Department: Public Works — Water & Sewer Total Project Cost: $1,200,000 Project Phased: Project Type: Facility Improvements Funding Source(s): General Fund and Grant Funding Potential Grant Identified: State Revolving Fund Operating Budget Impact: Moderate Impact Details: This Project is the next step in the development of the City's Water System. In 2011 the Water Treatment Facility located at the intersection of Shotgun Drive and the Kenai Spur Highway was developed. In 2015/2016 Well Field Improvements were completed. This project will update the distribution pumps that transport water from the water plant to all end users. Completion of this work will improve system reliability while increasing our ability to meet system demand. AIRPORT RESERVOIR PUMP HOUSE IMPROVEMENTS (DESIGN) Department: Public Works — Water & Sewer Total Project Cost: $300,000 Project Phased: No Project Type: Infrastructure Funding Source(s): Water & Sewer Fund/Grant Potential Grant Identified: Federal and State Option Operating Budget Impact: Moderate Decrease Details: This project will provide equipment replacements at the Airport Reservoir Pump House. This site has a three million gallon storage tank which provides the majority of water for the City during daytime hours. This work will utilize the existing building, but modify pumps and controls to provide a more robust and reliable system. Page 35 of 63 WATER & SEWER PROJECTS DISINFECTANT GENERATION EQUIPMENT (DESIGN) Department: Public Works — Water & Sewer Total Project Cost: $100,000 Project Phased: No Project Type: Equipment Upgrade Funding Source(s): Water & Sewer Potential Grant Identified: None Operating Budget Impact: Details: This Project will allow the Public Works department to generate our own chlorine disinfectant for use at the water and wastewater plants. This will remove the potential for supply chain issues we experienced starting with COVID. SERVICE BODY OPERATORS TRUCK Department: Public Works — Water & Sewer Total Project Cost: $150,000 V _ Project Phased: No Project Type: Equipment/Vehicle Funding Source(s): Water & Sewer Fund • Potential Grant Identified: — Operating Budget Impact: - Details: Provide new replacement crane service body truck for the Water & Sewer Division. This truck allows for the safe removal and deployment of lift station pumps as part of regular maintenance. Existing truck will be surplus auctioned. Page 36 of 63 WATER & SEWER PROJECTS UTILITY MANAGER TRUCK Department: Public Works — Water & Sewer Total Project Cost: $70,000 Project Phased: No Project Type: Equipment/Vehicle Funding Source(s): Water & Sewer Fund Potential Grant Identified: Operating Budget Impact: Details: WHEEL LOADER & ATTACHMENTS Department: Public Works — Water & Sewer Total Project Cost: $200,000 Project Phased: No Project Type: Equipment Funding Source(s): Water & Sewer Fund Potential Grant Identified: Operating Budget Impact: Details: This purchase will replace the departments existing 30+ year old Bobcat with a new compact loader with several attachments including forks for unloading supplies / chemicals, snow blower and snow pusher attachments for maintaining lift station and other facility access. Page 37 of 63 WATER & SEWER PROJECTS DIGESTER BLOWERS (CONSTRUCTION) Department: Public Works — Water & Sewer Total Project Cost: $2,900,000 Project Phased: No Project Type: New Building & Equipment Funding Source(s): Grant Dependent Potential Grant Identified: Operating Budget Impact: Significant Decrease :NdUrds 4�'_ il1 1 Details: This project will replace two 40-year-old blowers with new ones and installation of the new blowers in a new approximately 24 x 24 square foot prefab metal building located adjacent to the existing digester tank. This project is anticipated to provide significant operational and energy savings for the department. BROAD STREET LIFT STATION RENOVATION Department: Public Works — Water & Sewer Total Project Cost: $600,000 Project Phased: No Project Type: Infrastructure Funding Source(s): Water & Sewer Fund Potential Grant Identified: Yes Operating Budget Impact: Significant Decrease SCAdA - c.s.,..y.na�puaunx rx Details: This project will provide much -needed major improvements to the Broad Street Lift Station. This is a major collection site with all connections east of Broad St. running through this site before proceeding to the Waste Water Plant. This project will increase the capacity of the existing site, provide emergency backup power generation, and replacement of pumps and controls with new ones. Page 38 of 63 WATER & SEWER PROJECTS WWTP OPERATIONS BUILDING RENOVATIONS (DESIGN) Department: Public Works — WWTP Total Project Cost: $300,000 Project Phased: No Project Type: Building Improvement Funding Source(s): Water Sewer Fund/Grant Potential Grant Identified: Federal & State Options Operating Budget Impact: Significant Decrease Details: This Project is the next step in the development of the City's Water System. In 2011 the Water Treatment Facility located at the intersection of Shotgun Drive and the Kenai Spur Highway was developed. In 2015/2016 Well Field Improvements were completed. This project will update the distribution pumps that transport water from the water plant to all end users. Completion of this work will improve system reliability while increasing our ability to meet system demand. AIRPORT RESERVOIR PUMP HOUSE IMPROVEMENTS (CONSTRUCTION) Department: Public Works — Water & Sewer Total Project Cost: $1,200,000 Project Phased: No Project Type: Infrastructure Funding Source(s): Water & Sewer Fund/Grant Potential Grant Identified: Federal and State Option Operating Budget Impact: Moderate Decrease Details: This project will provide equipment replacements at the Airport Reservoir Pump House. This site has a three million gallon storage tank which provides the majority of water for the City during daytime hours. This work will utilize the existing building, but modify pumps and controls to provide a more robust and reliable system. Page 39 of 63 WATER & SEWER PROJECTS DISINFECTANT GENERATION EQUIPMENT (CONSTRUCTION) Department: Public Works — Water & Sewer Total Project Cost: $500,000 Project Phased: No Project Type: Equipment Upgrade Funding Source(s): Water & Sewer Potential Grant Identified: None Operating Budget Impact: Details: This Project is the next step in the development of the City's Water System. In 2011 the Water Treatment Facility located at the intersection of Shotgun Drive and the Kenai Spur Highway was developed. In 2015/2016 Well Field Improvements were completed. This project will update the distribution pumps that transport water from the water plant to all end users. Completion of this work will improve system reliability while increasing our ability to meet system demand. OPERATORS TRUCK Department: Public Works — Water & Sewer Total Project Cost: $60,000 Project Phased: No Project Type: Equipment/Vehicle Replacement Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Minimal F�. . 2024 � � 2026 AAM� • .• 111 Details: Replacement of an existing operator truck with new to allow for the continued operation of the Department. Page 40 of 63 WATER & SEWER PROJECTS WWTP OPERATIONS BUILDING RENOVATIONS (CONSTRUCTION) Department: Public Works — WWTP Total Project Cost: $2,280,000 Project Phased: No Project Type: Building Improvement Funding Source(s): Water Sewer Fund/Grant Potential Grant Identified: Federal & State Options Operating Budget Impact: Significant Decrease Details: This project will provide much needed improvements to the main operations building at the Waste Water Plant which was originally constructed in 1974 with improvements completed in 1982. The facility is on the shore of Cook Inlet and subject to the constant presence of salt air. As a result, much of the facility doors, windows, siding, hardware, etc. have rusted beyond repair. This project will provide a much needed facelift with improvements anticipated to help with improved energy savings. MAJOR LIFT STATION RENOVATIONS Department: Public Works — Water & Sewer Total Project Cost: $400,000 Project Phased: No Project Type: Infrastructure Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Significant Decrease Details: This project provides for major maintenance on existing lift stations to include access, structural, security, and safety upgrades. Page 41 of 63 WATER & SEWER PROJECTS STANDBY POWER UPGRADES Department: Public Works — Water & Sewer Total Project Cost: $200,000 Project Phased: No Project Type: Technology / Infrastructure Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Slight Increase COST: $200,000 Details: This project will provide emergency backup power generation for several lift station sites. WWTP ROTARY SCREEN REPLACEMENT (DESIGN) Department: Public Works - Water & Sewer Total Project Cost: $300,000 Project Phased: Yes Project Type: Equipment Funding Source(s): Grant Dependent Potential Grant Identified: None Operating Budget Impact: Moderate Decrease Details: This project will replace 40-year-old equipment with new technology and controls. This is an integral part of the treatment process. Effectively screening the influent safeguards pumps and controls downstream, allowing operators the ability to manage the treatment process. Page 42 of 63 WATER & SEWER PROJECTS GIS MAPPING IMPROVEMENTS Department: Public Works — Water & Sewer Total Project Cost: $200,000 Project Phased: No Project Type: Equipment Upgrade Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Minimal Details: WATER TREATMENT PLANT FENCING IMPROVEMENTS Department: Public Works — Water & Sewer Total Project Cost: $100,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Minimal Details: This project will replace 40-year-old fencing and improve site security at several locations. Page 43 of 63 WATER & SEWER PROJECTS OPERATORS TRUCK Department: Public Works — Water & Sewer Total Project Cost: $80,000 Project Phased: No Project Type: Equipment/Vehicle Replacement Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Minimal YEAR: 2024 r 2025 2026 2027 7111 202 Details: Replacement of an existing operator truck with new to allow for the continued operation of the Department. WATER MAIN VALVE REPLACEMENTS I Department: Public Works — Water & Sewer Total Project Cost: $160,000 Project Phased: No Project Type: Infrastructure Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Moderate T S YEAR: � 2025 J I 2027 j 202 Details: Planned replacements of inoperable 50 year old water main valves with new in various locations around the City. Page 44 of 63 WATER & SEWER PROJECTS WWTP ROTARY SCREEN REPLACEMENT (CONSTRUCTION) Department: Public Works - Water & Sewer Total Project Cost: $1,450,000 Project Phased: Yes Project Type: Equipment Funding Source(s): Grant Dependent Potential Grant Identified: Operating Budget Impact: Moderate Decrease 2024 20251�k11111J1&_ 2028 LYEAR: • 00• Details: This project will replace 40-year-old equipment with new technology and controls. This is an integral part of the treatment process. Effectively screening the influent safeguards pumps and controls downstream, allowing operators the ability to manage the treatment process. WASTEWATER TREATMENT PLANT FENCING IMPROVEMENTS Department: Public Works — Water & Sewer Total Project Cost: $100,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Minimal YEAR: 2024 Ir' 2025 2026 n 2028■ _AW Details: This project will replace 40-year-old fencing and improve site security at several locations. Page 45 of 63 WATER & SEWER PROJECTS WASTEWATER TREATMENT PLANT SCADA INTEGRATION Department: Public Works —WWTP Total Project Cost: $500,000 Project Phased: No Project Type: Technology Funding Source(s): Water and Sewer Fund Potential Grant Identified: None Operating Budget Impact: Minimal YEAR: 2024 2025 2028 • 11 111 Details: This project will provide major components to get all of the new equipment installed over the last several years tied back to one SCADA system to improve operator response time and troubleshooting abilities. WASTEWATER TREATMENT PLANT EFFLUENT FLOW MONITORING / CONTROL Department: Public Works — WWTP Total Project Cost: $225,000 Project Phased: No Project Type: Technology Funding Source(s): Grant Potential Grant Identified Operating Budget Impact Federal & State Options Moderate Decrease YEAR.'� 2028 • 111 Details: This project will provide equipment to provide more accurate dosing of chemicals in the treatment of wastewater effluent which will result in savings on Sodium Hypochlorite and Sodium Bisulfate. Chemical feed will vary based on the flow of effluent leaving the plant. Page 46 of 63 WATER & SEWER PROJECTS WATER MAIN LINE IMPROVEMENTS I Department: Public Works — Water & Sewer Total Project Cost: $250,000 Project Phased: No Project Type: Infrastructure Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: YEAR: 2024 2025 _A0111W 2027 • 1 111 Details: This project will correct known problem areas within the distribution system. WATER METER / SOFTWARE EQUIPMENT Department: Public Works — Water & Sewer Total Project Cost: $100,000 Project Phased: No Project Type: Technology Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Decrease YEAR: 2025 202 2027 202 • sells Details: This project will standardize for the department a software solution for reading meters starting with commercial facilities. This will significantly reduce staff time in reading meters. Page 47 of 63 WATER & SEWER PROJECTS AIRPORT RESERVOIR TANK EXTERIOR ASSESSMENT Department: Public Works — Water & Sewer Total Project Cost: $30,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Minimal YEAR: 2024 2025 2026 2027 • 1 111 Details: This project will address the exterior appearance of the airport reservoir tank. Five years ago the interior of the tank was coated to extend its life. This project will address the exterior insulation and coating that is deteriorating. MAJOR WELLHEAD MAINTENANCE I Department: Public Works — Water & Sewer Total Project Cost: $100,000 Project Phased: No Project Type: Infrastructure Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Moderate Details: This is a preventive maintenance project to provide for the continue operation of the City's well field. Items may include well pump and VFD replacements. Page 48 of 63 WATER & SEWER PROJECTS WASTEWATER TREATMENT PLANT INFLUENT PUMP STATION Department: Public Works - Water & Sewer Total Project Cost: $1,000,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Grant Dependent Potential Grant Identified: None Operating Budget Impact: Moderate Increase Details: This project will replace the existing influent station and install a new pump station to provide surge protection storage and grit capture. This will allow for more balanced incoming flows into the plant and reduce staff time on recovering from surges. CCTV EQUIPMENT Department: Public Works — Water & Sewer Total Project Cost: $75,000 Project Phased: No Project Type: Equipment/Technology Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Minimal 71 o $A Details: This project will provide for the replacement of the Departments existing CCTV camera equipment with newer technology. This equipment allows operators to trouble shoot sewer main issues with camera technology. Page 49 of 63 WATER & SEWER PROJECTS AIRPORT RESERVOIR TANK EXTERIOR REPAIR Department: Public Works — Water & Sewer Total Project Cost: $270,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Moderate YEAR: 2024 p 2025 2026 2027 Details: This project will address the exterior appearance of the airport reservoir tank. Five years ago the interior of the tank was coated to extend its life. This project will address the exterior insulation and coating that is deteriorating. WATER MAIN VALVE REPLACEMENTS II Department: Public Works — Water & Sewer a -� Total Project Cost: $160,000 Project Phased: No Project Type: Infrastructure Funding Source(s): Water & Sewer Fund Potential Grant Identified: None Operating Budget Impact: Details: Planned replacements of inoperable 50 year old water main valves with new in various locations around the City. Page 50 of 63 WATER & SEWER PROJECTS VAC TRUCK Department: Public Works — Water & Sewer Total Project Cost: $500,000 Project Phased: No Project Type: Equipment Funding Source(s): Water Sewer Fund Potential Grant Identified: None Operating Budget Impact: Decrease a YEAR: 2024 2025 2026 2027 Details: This project will provide for the replacement of the City's existing Vac Truck. This is an integral piece of equipment used regularly by the City. We have one, with no backup other than contracting out the services at a significant expense to the utility. The existing unit will be surplus auctioned with this purchase. The truck is used to clean and maintain wastewater lift stations, and the overall sewer collection system. The truck is also capable of jetting clogged lines. Page 51 of 63 Blank Page 52 of 63 Senior Citizens Fund FY2024 Ellty Foiect Name �����Iotal Project Co Grant unding Funding CurrentlyM Nothing Planned FY2025 Poll QSenior Grant Wroj'ect Name Total Project Cost Funding City Funding Center Landscaping we FY2026 W., 2 Senior Center Landscaping Project Phase II $35,000 $35,000 Totals $35,000 $35,000 FY2027 FY2028 .. •. Senior Center Fund Grand Total $75,000 $75,000 Page 53 of 63 Blank Page 54 of 63 SENIOR CITIZENS FUND PROJECTS SENIOR CENTER LANDSCAPING - PHASE I Department: Senior Center Total Project Cost: $40,000 Project Phased: Yes Project Type: Land Improvement Funding Source(s): Grant/ Donation Dependent Potential Grant Identified: State Operating Budget Impact: Minimal or No Impact COST: $40,000 Details: This project would landscape the south lawn of the Senior Center to level the area, which now contains sunken areas which prohibit safe access, and replant grass and trees as well as construct walkways for easy and safe maneuvering. This would improve lost access to the perimeter of the building, yard, and bluff areas for private rentals and the public, including wheelchair access. The project would be contingent on the construction of the Bluff Stabilization Project. SENIOR CENTER LANDSCAPING - PHASE II Department: Senior Center Total Project Cost: $35,000 Project Phased: Yes Project Type: Land Improvement Funding Source(s): Grant/ Donation Dependent Potential Grant Identified: State Operating Budget Impact: Minimal or No Impact YEAR�E 2023ME 202 �F 2025 _Miff202 2027 Details: This project would create a community fire pit area with wooden all-weather park benches for easy access for seniors and private rentals. Memorial benches and greenery provide an opportunity to generate revenue and celebrate individuals in the community. The project would be contingent on the construction of the Bluff Stabilization Project. Page 55 of 63 Blank Page 56 of 63 Congregate Housing Fund FY2024 1 Project Name Vintage Point Backup Generator Total Project Cost Funding City $100,000 $100,000 Funding 2 Vintage Point Elevator Major Maint. $50,000 $50,000 Totals $150,000 $150,000 FY2025 Fol Froirect Name Apartment Kitchen and Bathroom Remodel Grant otal Project Cost Funding City Funding EMEMIrerl I "$IT$ Me I MI I �M� FY2026 NOXIMA FY2028 Page 57 of 63 Blank Page 58 of 63 CONGREGATE HOUSING FUND PROJECTS VINTAGE POINT BACKUP GENERATOR Department: Senior Center Total Project Cost: $100,000 Project Phased: No Project Type: Building Improvement / Security Funding Source(s): Congregate Housing Fund Potential Grant Identified: None Operating Budget Impact: Slight Increase m COST: $100,000 Details: This project will provide a natural gas powered backup electrical generator for the Vintage Point housing development. A generator is only intended to provide backup power to the building's heating system as well as a life safety panel that powers the fire alarm and emergency lighting systems. VINTAGE POINTE ELEVATOR MAJOR MAINTENANCE Department: Public Works Total Project Cost: $50,000 Project Phased: Yes Project Type: Building Improvement Funding Source(s): Congregate Housing Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact Details: This project will provide for major maintenance of the Vintage Pointe elevator to allow for the continued safe operation of the City's most used elevator. The Vintage Pointe Senior Housing was constructed in 1993 and is approximately 40,450 square feet. Page 59 of 63 CONGREGATE HOUSING FUND PROJECTS APARTMENT KITCHEN AND BATHROOM REMODEL Department: Senior Center Total Project Cost: $300,000 Project Phased: Yes Project Type: Building Improvement J6 - - f Funding Source(s): Congregate Housing Fund Potential Grant Identified: None Operating Budget Impact: Minimal or No Impact Details: This project remodels the kitchen and bathrooms in three to six apartments each year at Vintage Pointe. The project would replace original (1993) tile flooring, cabinetry, countertops, and fixtures in kitchens and bathrooms to bring apartments into compliance with the Americans with Disabilities Act. This project is not eligible for low-income housing grants. Page 60 of 63 Personal Use Fishery Fund FY2024 FY2025 FY2026 FY2027 FY2028 Page 61 of 63 Blank Page 62 of 63 PERSONAL USE FISHERY FUND PROJECTS CITY DOCK BOAT RAMP CONCRETE REPAIRS Department: Public Works = _ Total Project Cost: $135,000 Project Phased: No ProjectType:Type: Infrastructure' Funding Source(s): State Grant 15-DC-078 Potential Grant Identified: State COD -- Operating Budget Impact: Minimal or No Impact - , COST: $135,000 Details: This project will replace the severely deteriorating concrete ramps primarily in lane 4 at the City Dock. Funding for this project is 100% grant funded through the Kenai River South and North Beach Dip Net Access grant. Grant number 15-DC-078. Page 63 of 63 i " PUBLIC NOTICE /�� Joint Work Session K E N A I November 16, 2022 at 4:45 p.m. Notice is hereby given; the Kenai City Council will be conducting a joint work session with the Councils, Commissions and Committees of the City of Kenai on Wednesday, November 16, 2022 to discuss the City of Kenai FY2024-2028 Capital Improvement Plan. The work session will begin at 4:45 p.m. and will be held in the Kenai City Hall Council Chambers, 210 Fidalgo Avenue, Kenai, AK 99611. The public is invited to attend and participate. Virtual and telephonic options are available. Additional information is available through the City Clerk's Office or by visiting the City of Kenai website at www.kenai.city. Shellie Saner, MMC, City Clerk Publish: 11/12/2022 CERTIFICATE OF PUBLICATION & POSTING I, Meghan Thibodeau, Deputy City Clerk of the City of Kenai, do hereby certify that on the 9t1 day of November 2022, 1 electronically mailed or caused to be published the foregoing Notice of Meeting to the Peninsula Clarion and requested that this Notice be published in the November 12, 2022 edition of their newspaper. On the 9th day of November, 2022, this notice was also posted at Kenai City Hall and on the internet at www.kenai.citv. Meghan Thibodeau, SepGty City Clerk