HomeMy WebLinkAbout2003-07-08 Airport Commission Packet - Special MeetingSPECIAL KENAI AIRPORT COMMISSION MEETING
JULY 8~ 2003
KENAI CITY COUNCIL CHAMBERS
7:00 P.M.
AGENDA
ITEM 1' CALL TO ORDER AND ROLL CALL
ITEM 2' AGENDA APPROVAL
ITEM 3' NEW BUSINESS
ao
Discussion -- Proposed Modifications to Gates, Fencing, Property Lines
and Public Parking in the General Aviation Area at the Kenai Municipal
Airport.
ITEM 4: ADJOURNMENT
KENAI MUNICIPAL AIRPORT
ENVIRONMENTAL ASSESSME~A~DPUBLiC iNFORMATION M]EETiNG S AND PARKENG LOTS
TUESDAY JULY 8, 2003
KENAI CITY COUNCIl, CHAMBERS
210 FIDALGO STREET
The City of Kenai, and the Kenai Airport Commission are holding an Environmental
Assessment Public Infomation meeting on Tuesday July 8, 2003 at 6:00 P.M. Items
proposed to be included in the Environmental Assessment document include portions of
Phase I, II, and III of the current Airpor~ Mast~ Plan on file at Kenai City Hall.
Introduction of Team Members
Presentation on Proposed Projects and Environmental Assessment
Public Comments
'9' Following the Public Information Meeting, the Airport Commission will hold a special
meeting to discuss proposed modifications to gates, fencing, property lines, and public
parking in the General Aviation area at Kenai Municipal Airport. This meeting will beg/n at
7:00 P.M. in Council Chamb~s, Tuesday July 8, 2003. Public input is respectfully
requested fiom concession interests, lessees, users, and the general public.
If you have questions please contact:
Jack LaShot, Project Manager
City of Kenai, Alaska
210 Fidalgo Street
Kenai, Alaska 99611
Phone: (907) 283-7535 ext. 236
Email' jlashot~ci, kenai.alcus
This location is accessible to persons having disabilities.
Any persons having special needs, or requiting special aid are
requested to contact the Project Manager.
KENAI MUNICIP~ AIRPORT PROPOSED PROJECTS
1. Acquisition of 40 to 80 acres of land for runway extension and protection to the north.
(S1/2 of S1/2 of SW1/4 of Section 21, Township 6 North, Range 11 West, Seward
Meridian, Alaska). If the full 80 acres is not acquired, then acquire at least an
avigation easement.
2. Extension of Runway 1-19 and parallel Taxiway P by at least 600 feet to the north of
rtmway (may need slightly more for localizer to be outside runway safety area at
south end). Also extend parallel Taxiway P to south end of Runway 1-19.
3. Extension of Runway I-19 drainage system to north.
4. Relocation and stabilization of new runway safety area to north of nmway extension.
5. Construction of maintenance and emergency access road around north end of Airport
property (about 9,000 linear feet). Road may be either along, or inside, property line
to avoid high-value wetlands.
6. Extension and widening of water runway by 500 feet north.
7. Disposal of frost susceptible soils resulting from grade preparation of runway
extension, runway safety area and water runway.
8. Construction of about 14,100 linear feet of fencing in Section 21 (3,500 linear feet),
Section 28 (1,500 linear feet) and Section 29 (9,100 linear feet), all in Township 6
North, Range 11 West. Fencing to be either along or inside property line to avoid
high-value wetlands.
9. Modifications/extension to MALSR system and access road to north.
10. Upgrade and/or extension of runway and taxiway lighting systems to north.
11. Relocation of Runway 1 approach threshold by at least 200 feet to north (may need
slightly more for localizer to be outside runway safety area at south end). Runway
restriping and modification of airfield signs as appropriate.
12. Construction of widened, paved blast protection shoulder areas outside of runway
lighting along both sides of the runway.
13. Development of lease lot area alongside gravel runway.
14. Extension of Willow Street north to Marathon Road.
15. Expansion of apron north of Taxiway J.
16. Relocation of ILS glide slope facility, VASI-4s and REILs.
/
o /J'