Loading...
HomeMy WebLinkAbout2003-07-08 Airport Commission Packet - Special MeetingSPECIAL KENAI AIRPORT COMMISSION MEETING JULY 8~ 2003 KENAI CITY COUNCIL CHAMBERS 7:00 P.M. AGENDA ITEM 1' CALL TO ORDER AND ROLL CALL ITEM 2' AGENDA APPROVAL ITEM 3' NEW BUSINESS ao Discussion -- Proposed Modifications to Gates, Fencing, Property Lines and Public Parking in the General Aviation Area at the Kenai Municipal Airport. ITEM 4: ADJOURNMENT KENAI MUNICIPAL AIRPORT ENVIRONMENTAL ASSESSME~A~DPUBLiC iNFORMATION M]EETiNG S AND PARKENG LOTS TUESDAY JULY 8, 2003 KENAI CITY COUNCIl, CHAMBERS 210 FIDALGO STREET The City of Kenai, and the Kenai Airport Commission are holding an Environmental Assessment Public Infomation meeting on Tuesday July 8, 2003 at 6:00 P.M. Items proposed to be included in the Environmental Assessment document include portions of Phase I, II, and III of the current Airpor~ Mast~ Plan on file at Kenai City Hall. Introduction of Team Members Presentation on Proposed Projects and Environmental Assessment Public Comments '9' Following the Public Information Meeting, the Airport Commission will hold a special meeting to discuss proposed modifications to gates, fencing, property lines, and public parking in the General Aviation area at Kenai Municipal Airport. This meeting will beg/n at 7:00 P.M. in Council Chamb~s, Tuesday July 8, 2003. Public input is respectfully requested fiom concession interests, lessees, users, and the general public. If you have questions please contact: Jack LaShot, Project Manager City of Kenai, Alaska 210 Fidalgo Street Kenai, Alaska 99611 Phone: (907) 283-7535 ext. 236 Email' jlashot~ci, kenai.alcus This location is accessible to persons having disabilities. Any persons having special needs, or requiting special aid are requested to contact the Project Manager. KENAI MUNICIP~ AIRPORT PROPOSED PROJECTS 1. Acquisition of 40 to 80 acres of land for runway extension and protection to the north. (S1/2 of S1/2 of SW1/4 of Section 21, Township 6 North, Range 11 West, Seward Meridian, Alaska). If the full 80 acres is not acquired, then acquire at least an avigation easement. 2. Extension of Runway 1-19 and parallel Taxiway P by at least 600 feet to the north of rtmway (may need slightly more for localizer to be outside runway safety area at south end). Also extend parallel Taxiway P to south end of Runway 1-19. 3. Extension of Runway I-19 drainage system to north. 4. Relocation and stabilization of new runway safety area to north of nmway extension. 5. Construction of maintenance and emergency access road around north end of Airport property (about 9,000 linear feet). Road may be either along, or inside, property line to avoid high-value wetlands. 6. Extension and widening of water runway by 500 feet north. 7. Disposal of frost susceptible soils resulting from grade preparation of runway extension, runway safety area and water runway. 8. Construction of about 14,100 linear feet of fencing in Section 21 (3,500 linear feet), Section 28 (1,500 linear feet) and Section 29 (9,100 linear feet), all in Township 6 North, Range 11 West. Fencing to be either along or inside property line to avoid high-value wetlands. 9. Modifications/extension to MALSR system and access road to north. 10. Upgrade and/or extension of runway and taxiway lighting systems to north. 11. Relocation of Runway 1 approach threshold by at least 200 feet to north (may need slightly more for localizer to be outside runway safety area at south end). Runway restriping and modification of airfield signs as appropriate. 12. Construction of widened, paved blast protection shoulder areas outside of runway lighting along both sides of the runway. 13. Development of lease lot area alongside gravel runway. 14. Extension of Willow Street north to Marathon Road. 15. Expansion of apron north of Taxiway J. 16. Relocation of ILS glide slope facility, VASI-4s and REILs. / o /J'