HomeMy WebLinkAbout1988-03-03 Economic Development Commission SummaryECONOMIC DEVELOPMENT/HARBOR COMMISSION
March .3, 1988
City Hall - Council Chambers
Vincent O' Reilly, Chairman, EDC
Tom ThOmpson, Vice Chairman, Harbor
ROLL CALL
Present- O' Reilly, Bond, Carter, Thomson. Tom Thompson, Eldridge,
Crabaugh, Nord - Harbor Commission
Absent- Elson, Dyer, Scott, Quesnel, (all excused)
Jahrig, Meeks, Page, (all unexcused)
Also Present- Gary Ervin, Seafoods from Alaska; Mayor Williams; Stan
Stedman, Kenai Peninsula Borough; Councilman Tom Ackerly; Jack LaShot,
Engineer, City of Kenai
I
Ph%sical Parameters of Seafood Proposals
A. Land
B. Utilities
1. Water
2. Sewer - disposal, septic waste
The sewage created by the processing of the fish is
anticipated to be less than that being released into the
river already by other fish processors.
3. Power - electric, gas
Gas is not necessary at this point in time. Electricity is
available to the boating facility and can be brought to the
site.
C. Transportatio.n Needs
1. Main Access - Nothing is needed at this point in time,
access can be gained by a road brought from the main highway.
The Commission agreed that Option A would be the best point
for access. The road is narrow, but not winding.
2. Secondary - The second route could be to put a road in
from the Boat Launch Road.
3. Mr. Ervin was asked if the airport would be a more
feasible point for his operations since he had spoken earlier
about the amount of transporting to the airport that his
ECONOMIC DEVELOPMENT/HARBOR COMMISSION
March 3, 1988
Page 2
business generates, answer no. The very nature of the
business is best suited to be near water. The use at the
airport would consist of a gift area in the terminal where
package items could be sold, but not a large facility.
4. River Transit
The business has used this mode in the past and the product
will use barging for transportation with freezer vans. There
will be an increase in airport transportation to Anchorage
for orders going out during the summer as tourists like to
take their orders with them, i.e. have them transported to
the airport for loading onto the plane.
II Method of Operation
A. Product Flow
, ,
The first stage is to head, gut, and flash freeze. The second
phase is loading into a van. The outflow can be as high as 10,000
to 20,000# depending upon many factors such as the season. The
third phase is completing the packaging and storage.
The Commission and Mr. Ervin discussed bonding of the storage
facility. As the Commission had no information regarding the
cost, this will be researched.
B. Various Points of Product Conversion
, ,,
Most of the product goes to Anchorage or Sterling. The plant for
the secondary process is either in Anchorage or Sterling.
C. Seasonal Phases
The widest stretch of the season runs from June to mid-September.
Councilman Ackerly asked if the business were planning to get into
other types of seafoods such as shrimp, answer yes. They are in
the early stages.
D. Commu, nitY Amenities
The Commission asked Mr. Ervin about such operations as hotels,
conference centers, etc., Mr. Ervin answered no.
E. Other
The Commission further discussed the monetary issues regarding the
facility, bonding, land, and grant application as it appears in
the written proposal.
ECONOMIC DEVELOPMENT/HARBOR COMMISSION
March 3, 1988
Page 3
EDC Recommendation to Council
The Commission discussed the recent survey conducted by the City
of Kenai of the Peninsula area fishermen and noted that their are
mixed in their needs for ice or storage facilities. The
Commission, in looking at the total picture asked Engineer LaShot
for an estimate of costs for the road in Option A, Mr. LaShot
answered, "a very rough estimate would be between $200-300,000.
The next issue addressed was the land, as the desired location is
private property. The land was appraised for $180,000 last year
and using a rough figure of $200,000 would be appropriate for an
estimate for the purpose of putting together a package.
Mr. Stedman discussed the federal funding, stating that Mr.
Richert had been on the Peninsula last week and indicated the EDA
may be willing to go as high as $900,00 for this type of project.
The normal match is 50%. The funding package would appears
something like this-
1.3 million base
250,000 road
50,000 utilities
1.6 million
800,000 City Share of matching grant
200,00 Dept. of Commerce
600,000
200,000 land
Mr. Stedman informed the Commission that Mr. Richert is anxious to
see the City of Kenai move forward with this project. If things
come together in the next 2 to 3 weeks, the preparation of the
grant application will complete the first phase. Mr. Ervin needs
to see willingness to commit to the project. You need to have
such things as perhaps a site preparation package. Council will
also have to have physical paper work and review prior to the next
meeting. The Commission agreed that April 6th would be the target
for presenting to Council.
Time table for Presentation:
3/8
3/10
3/ o
Phone Mr. & Mrs. Coyle regarding land sale
Alternative is to approach Mr. Fredrickson
Contact Mr. Weideman - Dept. of Commerce
Direct the Engineer to begin study of site
(road, fill, engineering)
Dana meet with Borough for complete package
Direct the attorney to begin a lease package
Assemble information on the building and cost
of bonding
The Meeting was Adjourned
Janet A. Loper, Planning Specialist
Secretary to the Commissions