HomeMy WebLinkAbout2002-06-10 Harbor Commission PacketKENAI HARBOR COMMISSION MEETING
JUNE 10, 2002
KENAI COUNCIL CHAMBERS
7:00 P.M.
AGENDA
ITEM 1-
CALL TO ORDER & ROLL CALL
ITEM 2:
AGENDA APPROVAL
ITEM 3-
APPROVAL OF MINUTES -- May 6, 2002.
ITEM 4:
PERSONS SCHEDULED TO BE HEARD
ITEM 5'
OLD BUSINESS
ao
Discussion -- Boatin§ Facility Operating Alternatives
Discussion -- Kenai River Brid§e Access Road Pathway-- Project Update
ITEM 6:
NEW BUSINESS
ITEM 7:
REPORTS
ao
Director
Dock Foreman
City Council Liaison
ITEM 8:
COMMISSIONER COMMENTS/QUESTIONS
ITEM 9:
INFORMATION
ao
Kenai City Council Action Agendas of May 1 and 15, 2.002.
5 / 8 / 02 Dock Rate Schedule
ITEM 10'
ADJOURNMENT
KENAI HARBOR COMMISSION MEETING
MAY 6, 2002
KENAI COUNCIL CHAMBERS
7:00 P.M.
AGENDA
ITEM 1'
CALL TO ORDER/h ROLL CALL
ITEM 2:
AGENDA APPROVAL
ITEM 3:
APPROVAL OF MINUTES ¥ - April 8, 2002.
ITEM 4:
PERSONS SCHEDULED TO BE HEARD
ITEM 5'
OLD BUSINESS
ITEM 6'
NEW BUSINESS
ao
Discussion -- Boating Facility Operating Alternatives
ITEM 7:
REPORTS
ae
Director
Dock Foreman
City Council Liaison
ITEM 8:
COMMISSIONER COMMENTS/OUESTIONS
ITEM 9:
INFORMATION
ao
Kenai City Council Action Agendas of April 3 and 17, 2002.
4/11 / 02 Homer News article, Bluff Seawall Project on Hold.
4/02 Resource Development Council for Alaska, Inc., Resource Review.
4 / 10 / 02 Anchorage D'aily News article, Water Samples Show Oil Pollution
in Kenai River.
ITEM 10:
ADJOURNMENT
KENAI HARBOR COMMISSION MEETING
MAY 6, 2002
KENAI COUNCIL CHAMBERS
7:00 P.M.
CHAIRMAN TOM THOMPSON, PRESIDING
MINUTES
ITEM 1'
CALL TO ORDER/k ROLL CALL
Chairman Thompson called the meeting to order at 7'00 p.m.
confirmed as follows.
Roll was taken and
Present:
Absent:
Others Present'
Eldridge, Rogers, Spracher, Thompson, Barret, Foster
Simon
Councilman Bookey, Public Works Director Kornelis,
Manager Freden and Department Assistant Harris
Dock
ITEM 2:
AGENDA APPROVAL
MOTION:
Commissioner Eldridge MOVED to approve the agenda as presented and Commissioner
Rogers SECONDED the motion. There were no objections. SO ORDERED.
ITEM 3:
APPROVAL OF MINUTES -- April 8, 2002.
Chairman Thompson requested a change on page three (Item 6-a, fourth paragraph) to
read "... by.five percent..."
MOTION:
Commissioner Eldridge MOVED to approve the revised minutes and Commissioner
Spracher SECONDED the motion. There were no objections. SO ORDERED.
ITEM 4:
PERSONS SCHEDULED TO BE HEARD -- None
ITEM 5-
OLD BUSINESS
Commissioner Eldridge requested the Commission briefly discuss the status of the
Unity Trail- Warren Ames Bridge area bike path. Komelis stated a recommendation
was sent to the Department of Transportation; he will provide the Commission with a
copy as well as comments and suggestions from the last meeting. Commissioner
Eldridge requested the Commission focus on public safety issues regarding the location
of the proposed bike trail.
ITEM 6' NEW BUSINESS
6-a. Discussion -- Boating Facility Operating Alternatives
Councilman Bookey explained the current fiscal situation and requested the
Commission dedicate time focusing on expenditure-reducing solutions. Bookey also
reminded the Commission of a work session on May 7 at 7 p.m. that will concentrate
on potential budget cuts. Bookey stated it would be beneficial for the Commission to
provide several ideas prior to the work session. Bookey requested this item remain on
the agenda throughout the summer. The following ideas were discussed at length:
The Commission discussed the idea of contracting out some (or all) of the
dock services. If contracted out, the added expenses of crane maintenance,
inspections, gear installations, insurance, dock repairs, etc. would be very high and
perhaps not economically feasible for a private entity. If contracted, limitations to the
agreement would be made to ensure public access.
· The Commission discussed ideas on creating new revenue including:
-- Check out competitive rates for launch fees and consider raising the fee
as approximately 3,000 people launched last year.
-- Fines for overnight parking: Overmght parking is prohibited in the
lease.
-- Charging for general parking: As the City charges only for a launch fee,
additional vehicles park for free.
-- Tie-up fees: The City currently charges only $7.00 a day for buoys.
Additional fees for tie-ups have not been established.
-- Derby revenue (though the Commission found this unlikely as the City
of Kenai cannot engage in gambling activities and the fiver would suffer
from over-crowding).
-- Create a set amount for fuel. The current margin rate is 26% which is
significantly higher than the competition.
ITEM 7: REPORTS
7-a. Director-- Kornelis reported on the following:
· Regarding the Kenai Coastal Trail email memo to City Manager Snow,
Kornelis explained Peratrovich, Nottingham & Drage (PND) might not be granted the
contract for.this project. As the memo. states, Tyrck, Nyman & Hayes (TNH) might be
awarded the contract and may, in turn hire PND as a subcontractor. Komelis stated
he would keep the Commission apprised when new information is known.
7-b. Dock Foreman- Dock Foreman Freden reported on the following:
· As of May 1, the dock has been opened.
· Due to weather, the launch ramp was opened on May 15, 2002. Last
year it opened on April 25.
· New bumpers are scheduled for installation at the next low tide.
Due to ice damages, 'several lower piles are in need of replacement at a
significant cost to the city.
City Council Liaison - Councilman Bookey invited the Commission to the May
KENAI HARBOR COMMISSION
MAY 6, 2002
PAGE 2
7 work session at 7 p.m.
hard work.
Bookey also thanked the Commission for their ideas and
ITEM 8:
COMMISSIONER COMMENTS/OUESTIONS -- Non~
ITEM 9:
INFORMATION
Kenai City Council Action Agendas of April 3 and 17, 2002.
4 / 11 / 02 Homer News article, Bluff Seawall Project on Hold.
4/02 Resource Development Council for Alaska, Inc., Resource Review.
4/10/02 Anchorage Daily News article, Water Samples Show Oil Pollution in
Kenai River.
ITEM 10:
ADJOURNMENT
MOTION:
Commissioner Spracher MOVED to adjourn and Commissioner Rogers SECONDED the
motion. There were no objections. SO ORDERED.
The meeting adjourned at approximately 8:55 p.m.
Minutes prepared and transcribed by:
Sharon M. Harris, Department Assistant
KENAI HARBOR COMMISSION
MAY 6, 2002
PAGE 3
MEMORANDUM
·
CITY OF KENAi
"oa ,4
210 FIDALGO AVE., SUITE 200 KENAI, ALASKA 99611-7794
TELEPHONE 907°283-?535
FAX 907-263-3014 ~
TO:
FROM:
DATE:
SUBJECT:
Harbor Commission
Keith Kornelis, Public Works Manage~
April 29, 2002
Boating Facility- Operating Methods
The City Council would like the Harbor Commission to discuss and make recommendations on
alternative ways to operate the Boating Facility.
1. Complete privatization of the facility or contract out the entire facility.
2. Contract out everything on the concrete dock including the cranes and fueling operations.
The City would continue to operate the launch ramps, launch floats, restrooms, water well,
sewer system.
3. Close the entire facility.
4. Other alternatives.
Things to consider:
Yearly testing and. certifications for well and drinking water, septic system, fuel lines,
hydraulic pressure tests, cranes, stoles, fuel measurements, and others.
At both the concrete dock and floats between launch ramps, steel piles need to be set by
crane, which we contract out.
Mud needs to be removed on launch ramps and each pile. City contracts backhoe to dig
mud out along ramps.
· Water system needs recharging each year.
Restrooms need to be winterized and summerized. They require services 3 or 4 times each
day.
· Money needs to be collected many times per day from boat launch fee.
Attached is the FY 2003 Proposed Operating Budget. Please note that there is $70,000
tmnsforred into the Boating Facility Account from the General Fund to cover expenses.
KK/jet
DEPARTMENT NARRATIVE
BOATING FACILITY FUND - BOATING FACILITY
This department is supervised by the Public Works Manager.
This department consists of a dock manager and a dock hand. These are summer-time
positions. The dock manager works six months in this department and six months in the
street department.
This department is responsible for the operation, maintenance, and repair of a large
municipally-owned boating facility.
This department of Public Works is responsible for the operation of the Kenai Boating
Facility and coordination between fish processors with leases, independent fish
processors, public users, commercial, recreation, and dip net fishermen, and others.
They operate a variety of maintenance and operational equipment including cranes,
pumps, high pressure washers, graders, front-end loaders, backhoes, and sewage
vacuum trucks. Thoy clean, sentice, and make repairs. They assign the use and
collect money for the waste oil disposal, septic disposal, showers, trash, and boat
launching at ramps. They also grade road surfaces and parking lots allowing for slopes
and drainage. They are responsible to dispense and collect money for petroleum
products, and other items for sale at the dock office - gas, diesel, detergent, hydraulic
oil, oil, etc. They maintain and operate the rest moms and showers, operate power
tools, operate and maintain the VHF anti CB radios and communications system, repair
lighting system, perform carpentry, plumbing, welding, concrete, hauling, and other
maintenance work as assigned.
They must have considerable knowledge of Coast Guard, ADEC, OSHA, and other
state and federal rules and regulations connected with operating a public boating
facility.
[32
City Of Kenai
Fiscal Year 2003 Operating Budget
Fund- 070.60 Boating Facility
De~¢riptto_n
REVENUES
Rents anti Leases
Wharfage
Petroleum Sales
Boat Raml3 Fees
Transfer from General Funcl
Miscellaneous
Total Revenues
EXPENSES
Net Income (loss)
Add credit from Depreciation
Contnbution to (from)
Fund Balance
Projected lapse (3%)
Adjusted (Deficit)/Surplus
Beginning Fund Balance
Ending Fund Balance
Original
FY2000 FY2001 FY2002 Amended
Ac~a~l Actual Budqet Budaet
23,500 $ 23,500 $ 23,500 $ 23,500
2,714 4,461 2,500 2,500
35,313 27,396 35,000 35,000
30,609 27,829 30,000 30,000
75,000 71,000 70,000 70,000
3,074_ 2,318 1,500 1,500
_
_
170.210_ 15e,50~ 162,500 162,500
193,174_ 117.296 150.748 151,600
(22,964) 39,208 11,752 10,900
'38,296
_ ,
15,332 39,208 11,752 10,900
FY 20O2
proleet~o_n
23,500
3,700
27,000
30,000
66.000
1.500
_
151,700
151.600
100
100
Administration
Reeemmended
FY2003
23,500
3,000
35,000
30,O0O
70.000
1,500
163,000
165,169
(2,169)
(2,169)
4,522 4,548 4.548 4,955
16,274 15,448 4.648 2,786
47,152
__(100,49~_) ,,, 15,837 30,878 47,152
$~(85,16_4_) $ 55,045 $ 47,152 $ 62,600
51,800 $
51,800
54,586
133
City Of Kenai
Fiscal Year 2003 Operating Budget
Fund: 070. Boating Facility Fund
Department: 60. Boating Facility
Account
Number
0100
O200
O250
O30O
0400
O450
0500
0600
o700
0800
0900
2021
2022
2024
2025
2026
4531
4532
4533
4534
4535
4536
4537
4538
4539
4540
4541
4666
4667
4999
5041
5O45
5047
8061
8062
8063
8064
9090
Oes~rlmion
Orlgt.ll 12/3112001 Administration
I:Y2001 Budget Amemted Re~emmended
Acttlll ~ Budaet FY2003
Salaries and Benefit~
Salanes $ 37,806
Over, me 4,068
Holiday Pay .
Leave (101)
Medicare 600
Social Security 968
PERS 536
Unemployment Insurance 2,614
Workers Compensauon 2,625
Health & Life Insurance 3,570
Supplemental Retirement 973
Total Salaries & Benefit~ $ 53,649
$ 36,902 $ 36,902
6,000 6,000
. .
1,749 1,749
647 647
9O7 907
743 743
2.372 2.372
1,047 1,047
4,131 4,131
750 760
$ 55.248 $ 55.248
Maintenance and Operations
Office Supp.es 68 400 400
OperatJng & Repair Supplies 21,812 45,000 45,012
Small Tools/Minor Equipment 4,861 1,000 1,0aa
Snack Bar Supplies . . .
Compuler Software . . .
ProfessIonal Services 150 200 200
Communications 341 800 800
Travel & Transportation 944 3,000 3,000
Advertising 32 500 500
Printing & Binding - 1,800 1,800
Insurance 5,900 6,000 6,000
Utilities 3,910 6,000 6,000
Repatr& Maintenance 4,953 11,000 11,840
Rentals 1,831 1,800 1,800
Equip. Fund Pmts ....
Postage . . .
Books . . .
Due~ & Publications 125 150 150
Contingency . . .
Miaeeilaneous 322 350 350
DeprecmUon . . .
Grants to Agencies . . .
Total Malnt. and Operation~ $ 45.249
,,,
CaDital Outlay & Tranfem
Land .
Buildings .
Improvements .
Machinery & Equipment .
Transfers Out 18,400
Total Capital Outlay
and Transfers $ 18,400
Department Total: $ 117,298
$ 78,000 $ 78.852 S
,
17,500
$ 17,600
$ 150,748
Oifflmnce
from
FY2002 Orig.
37,038 $ 136
6,000 -
o
2,117 368
655 8
165 (742)
1,062 319
314 (2,058)
1.258 211
7,710 3.579
1,000 250
57,319 $ 2,071
· 400
45,000
1,000
.
o
200
8OO
3,000
500
1,800
5,7O0
6,000
28,700
2,000
o
o
.
15O
.
5OO
o
17,500
17,500
151,600
95.750
12.100
12.100
165,169
(300)
17,700
200
o
o
o
o
150
..
17,750
(S~400)
(5,400)
14,421
0.37%
0.00%
0.00%
21.04%
1.24%
-81.81%
42.93%
-86.76%
20.16%
86.64%
33.33%
3.75%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
-5.00%
0.00%
150.91%
11.11%
0.00%
0.00%
0.00%
0.00%
0.00%
42.86%
0.00%
0.00%
22.76%
0.00%
0.00%
0.00%
0.00%
-30.86%
-30.86%
9.S7%
134 ~
CITY OF KENAi
FY 2003 BUDGET
FUND:
Boating Facility
DEPT:
Boating Facility
A/C,#
DESCRIPTION
ADMINISTRATION
RECOMMENDED
2021
Office Supplies
400
2022
Operatin_~ and Repair Supplies
Fuel, lubricants, oil absorbent boom,
cleaning supplies, safety equipment,
miscellaneous supplies
45,000
2O24
Small Tools and Minor Equipment
Miscellaneous
1,000
4531
Professional Services
Water tests
200
4532
C,o, mmunication
800
4533
4534
Transportation_
Harbormaster Conf., safety classes
Advertisin.q
3,000
500
4535
P,rintinfl and Bindin.q
Pdnt launch envelopes,
copy machine rental
1,800
4536
Insurance
5,70O
4537
Utilities
6,0OO
4538
Repair and Maintenance
Hydro testing, backhoe with
operator, crane, inspections
Replace budecl pipe for pilings
12,000
16,700
28,700
4539
Rentals
Port-a-potties & other
2,OOO
4667
Dues and Publications
Harbormaster dues
150
5041
'Miscellaneous
500
9090
Transfers to Other Funds
Central Administrative costs (G/F)
12,100
way
May 2002
Design of the Kenai River Bridge Access Road
Pathway, a proposed pedestrian/bicycle
pathway along Bridge Access Road in Kenai, is
continuing. The pathway is proposed to begin at
Kalifornsky Beach Road and end at the Kenai
Spur Highway, a distance of approximately 3.3
miles. The pathway would connect existing
pathways at each end of the project.
· ' ,-KENAI:".' ':-
~ EXISTING PATHWAY
..
Over the past year, the project design team of
Wince-Cortheil-Bryson, assisted by Bristol
Environmental & Engineering Services and URS
Corporation, provided project scoping, met with
resource agencies and the public, responded to
comments, and prepared a Scoping Summary
Report. The Scoping Summary Report, a
compilation of alternatives presented, issues
raised, and comments received, is available for
review at any of the following locations:
· Office of Wince-CorthelI-Bryson
609 Marine Street
Kenai, Alaska
· City of Kenai Library
Main Street Loop
Kenai, Alaska
· Office of ADOT&PF
4111 Aviation Avenue
Anchorage, Alaska
Currently the project design team is conducting
an environmental assessment to evaluate the
potential impacts which might be expected to
occur as a result of the proposed pathway.
Work on the environmental assessment is'
anticipated to take one year, with completion
expected early next year. The environmental
'assessment document will be made available to
the public for review and comment.
PROJECT SCHEDULE
Environmental Analysis: April 2002-March 2003
Final Design: April 2003- Dec. 2003
Construction: Summer of 2004
SED
PATHWAY
KALIFORNSKY BEACH
EXISTING PATHWAY
PROJECT MAP
If you have any questions regarding the
project, please contact:
John Dickenson, P.E. Project Manager
State of Alaska DOT&PF -
P.O. Box 196900
Anchorage, Alaska 99519-6900
phone: (907) 269-0572
emaii' john_dickenson@dot.state.ak.us
Mark Blanning, P.E.
Wince-Corthell-Bryson
Box 1041
Kenai, Alaska 99611
phone: (907) 283-4672
emaii: wcb@ptialaska.riet" '
o .
To: Amy Anderson
From: Keith Kornelis
Oal~: 05/22/2001
Re:
Kenai River Bridge Access Road Pathway
I am sending you a copy of the agenda and drawings from the Public "Open House" Meeting that was
held on the subject project on May 15, 2001.
The City. of Kenai is very. supportive of this project because:
· it will complete the final link of pathways between Kenai and Soidotna. After this section is
completed pedestrians or bicyclists will be able to make the complete loop on this Unity Trail
System Loop. People on K Beach will be able to walk or bike the pathway to Kenai.
If it is constructed as a separate pathway away from the vehicle traffic, it will provide a safe
route for pedestrian and bicycle traffic.
The City. of Kenai would like to see the following:
· The pathway placed separate from the existing road embankment. The pathway needs to be
placed away from the existing fast moving vehicle traffic. There has been a suggestion of
diverting the pedestrian and bicycle traffic up onto the shoulder of the existing road way in some
areas in order to save some wetlands and bird habituate. This would be very dangerous and an
unacceptable alternative. The proposed attached pathway has been suggested as a compromise.
It would move the Pathway away from the existing road but not provide as distinct separation as
the separated pathway.
· The route of the pathway that the City of Kenai support is:
Run along the east side from K Beach to the Bridge.
Cross under the Bridge to the west side by Birch Island.
Go across the existing bridge deck on the west side.
Continue on the west side of the road from the Bridge to the Kenai Spur Highway.
The Kenai River Bridge Access Road Pathway would receive a tremendous amount of use from local
residents, tourists, and visitors. It would tie into the future Kenai Coastal Trail. The whole system of
trails in this area will get heavy, use especially when they are all tied together..
ILl
F-
n z
0
0
0
0
I.I.J
H.I
ILl
l--
n
ILl
"r'
IJJ
0
1.1.1
COMMENT FORM
KENAI RIVER BRIDGE ACCESS ROAD PATHWAY
What do you think? Let us know your concerns, suggestions, and/or ideas.
Name'
Address'
Phone'
Fax:
E-mail'
Comments'
Deposit comment form in basket before you leave, or mail or fax to:
Mark Blanning
Wince-CorthelI-Bryson
Box 1041
Kenai, Alaska 99611
Ph. (907)283-4672
Fax (907) 283-4676
Suggested by: A,
RESOLUTION :2001-28
A RESOLUTION OF THE CITY OF KEN~, AI~SKA REAFFIRMING ITS SUPPORT
OF THE STATE OF AI~S~ DOT/PF IN ITS EFFORT TO PROPE~Y
CONSTRUCT PEDESTRIAN AND, BI~ PATHS ALONG STATE HIGHWAYS AND
DESCRIBING THE CITY OF ~NAI'S INTENT TO PROVIDE SEASONAL
CLUING OF THE PATHS ALONG THE BRIDGE ACCESS ROAD.
WHEREAS, the City of Kenai believes that it is in the best interest of the
Department of Transportation to provide safe and expedient flow of not only
vehicles but also bicycles and pedestrians at a reasonable cost to the public;
arid,
WHEREAS, the City of Kenai would like to reaffn'm its support as stated in its
Resolution No. 97-77 passed by the Council of the City of Kenai on November 5,
1997.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
KENAI, ALASKA, that the City Manager is authorized to use City of Kenai
personnel to sweep and remove surface debris from the pedestrian and bike
paths along the .Bridge Access Road during the period of May through
September.
PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, this 18th day of
April 2001.
ATTEST:
MS, MAYOR
Carol L. Freas, City Clerk_
Approved by Finance: 2~J~_
~/ l~ '97 ~34: ~II~M CITY OF K~l~qI ~ L:~3 3~314
P. ;'-,,'2
Suggested By: Administration
CITY OF KENA/
~OLL'TION NO. 97-77
A RESOLUTION OF THE CI~ OF KENA1 SUPPORTIN~ THE STATE OF ALASKA,
DEPARTMENT OF TRANSPORTATION AND PUlgLIC FACILITIES IN ITS EFFORT TO
PROPERLY CONSTRUCT PEDESTRIAN AND BIKE PATHS ALONG. STATE HIGHWAYS,
AND DESCKIBING THE CITY OF KENAI~J INTENT TO PROVIDE SEASONAL
CLEANING OF T/-IE PATHS ALONG THE BRIDOE ACCESS ROAD.
WHEREAS, thc CitT of Kenai believes that it is in thc best interest of the Dcpm-tment
of Transportmt/on ~o provide safe and expedient flo~v of not only vehicles, but bicyuic~
and, pedestrians at a re~onable cost ~o the public.
NOW TIiEREFo~, BE IT RESOL~D BY THE COUNCIL OF THE CITY OF KENAI,
ALASKA, that the City Manager is author/ze~ to us~ Cit7 Gl Kmiai per$onn¢! to swcep
and rcm~ve ~uHac~ debris/rom the pedca~ and bike paths along [l~e Bridge
Access Road during ~e period of May thvo%t~l 8cptcmbcr.
PASSED BY THE COUNCIL OF TI/E CITY OF KEN~, AIASKA, this fiftk clay of
November, 1997.
j. Mayor
ATTEST:
Carol L. Fzeas,'CitT Clerk
I. igl. elON xed
AGENDA
KENAI CITY COUNCIL- REGULAR MEETING
MAY 1, 2002
7:00 P.M.
KENAI CITY COUNCIL CHAMBERS
http://www, ci.kenai.ak.us
BOARD OF ADJUSTMENT HEARING -- 7:00 P.M.
ITEM A: CALL TO ORDER
,
1. Pledge of Allegiance
2. Roll Call
3. Agenda Approval
4. Consent Agenda
*All items listed with an asterisk (*) are considered to be routine and non-
controversial by the council and will be approved by one motion. There will be no
separate discussion of these items unless a council member so requests, in which case
the item will be removed from the consent agenda and considered in its normal
sequence on the agenda as part of the General Orders.
ITEM B:
/,
SCttEDULED PUBLIC COMMENTS(10 minutes) . , ; , .
Andrew Carm~cli' ' "ael, Jack Brown, Becky Foster, Pam~Howard -- Arctic
Winter Games
Jennifer Bec~kr~an, Kristen Lambert, Central Area Rural Transit
System, Inc. -- Update and Funding 2002/2003 Request
ITEM C:
PUBLIC ItEARINGS
,
le
.
e
.
Ordinance No. 1953-2002 -- Increasing Estimated Revenues and
Appropriations by $3,000 in the Senior Citizens Title III Grant Fund .for a
Grant from the State of Alaska Transferring Match Money for the
Borough Grant Fund.
Resolution No. 2002-22 -- Amending ICMA 457 Deferred Compensation
Plan to Permit Loans.
,
Resolution No. 2002-23 -- Setting the Public Hearing Date on the
Proposed Pillars Subdivision (Chinook Drive and Sockeye Circle) Paving
District.
Resolution No. 2002-24 -- Awarding the Bid to Big G Electric &
Engineering, Inc. for the Kenai Recreation Center Light Replacement -
2002 for the Total Amount of $38,312.00, Which Includes the Basic Bid
and Additive Alternate.
.
,
,
ITEM D:
o
2.
3.
4.
5.
6.
7.
ITEM E:
o
ITEM F:
ITEM G:
ITEM H:
.
,
o
Resolution No. 2002-25 -- Approving A Contract to Wince-Corthell-
Bryson for the Project Entitled Bridge Access Road Water/Sewer
Feasibility Study for the Not-To-Exceed Amount of $29,590.
Resolution No. 2002-26 -- Awarding the Bid to Great Bear Ford for a
Streets Flatbed Truck - 2002 for the Total Amount of $41,501.
Resolution No. 2002-27 -- Supporting the Central Peninsula Counseling
Services' Concept of building a Residential Treatment Center for
Adolescents.
COMMISSION/COMMITTEE REPORTS
Council on Aging
Airport Commission
Harbor Commission
Library Commission
Parks & Recreation Commission
Planning & Zoning Commission
Miscellaneous Commissions and Committees
a. Beautification Committee
b. Kenai Convention & Visitors Bureau Board
c. Alaska Municipal League Report
MINUTF~
*Regular Meeting of April 17, 2002.
CORRESPO~ENCE
OLD BUSINESS
NEW BUSINESS
Bills to be Paid, Bills to be Ratified
Purchase Orders Exceeding $2,500
*Ordinance No. 1954-2002 -- Amending the Employee Classification
List at KMC 23.50.010(c) to Include Chief Animal Control Officer and
Assistant Animal Control Officer and KMC 25.50.010(d) to Include a
Buildings Maintenance Lead Technician, a Water and Sewer Lead
Operator, and to Change the Class Titles of Water and Sewer and Sewer
Treatment Classifications.
*Ordinance No. 1955-2002 -- Increasing Estimated Revenues and
Appropriations by $16,000 in the General Fund to Implement a Plan to
Better Control the Personal Use Fishery Impacts on the South Side of the
Kenai River.
.
.
ITEM I:
ITEM J:
Approval-- Sublease of Tract C, Kenai Tidelands Survey No. 2 -- Polar
Equipment, Inc. d/b/a Cook Inlet Processing to Ocean Beauty Alaska,
Inc.
Approval-- Special Use Permit Renewal -- Reean Pitts/ATM Machine in
Airport Terminal.
Discussion -- ComprehenSive Plan Progress
REPORT OF THE MAYOR
AD~STRATION REPORTS
1. City Manager
2. Attorney
3. City Clerk
ITEM K:
DISCUSSION
1. Citizens (five minutes)
2. Council
EXECUTIVE SESSION- None Scheduled
ITEM L:
ADJOURNMENT
AGENDA
KENAI CITY COUNCIL- REGULAR MEETING
MAY 15, 2002
7:00 P.M.
KENAI CITY COUNCIL CHAMBERS
http' //www.ci.kenai.ak.us
ITEM A:
CALL TO ORDER
1. Pledge of Allegiance
2. Roll Call
3. Agenda Approval
4. Consent Agenda
*All items listed with an asterisk (*) are considered to be routine and non-
controversial by the council and will be approved by one motion. There will be no
separate discussion of these items unless a council member so requests, in which case
the item will be removed from the consent agenda and considered in its normal
sequence on the agenda as part of the General Orders.
ITEM B:
SCHEDULED PUBLIC COMMENTS (10 minutes)
.
ITEM C:
Mike Siegfreid -- C. entral Peninsula General Hospital/Survey Update
Ordinance No. 1954-2002 -- Amending the Employee Classification List
at KMC 23.50.010(c) to Include Chief Animal Control Officer and
Assistant Animal Control Officer and KMC 25.50.010{d) to Include a
Buildings Maintenance Lead Technician, a Water and Sewer Lead
Operator, and to Change the Class Titles of Water and Sewer and Sewer
Treatment Classifications.
Ordinance No. 1955-2002 -- Increasing Estimated Revenues and
Appropriations by $16,000 in the General Fund to Implement a Plan to
Better Control the Personal Use Fishery Impacts on the South Side of the
Kenai River.
ITEM D'
COMMISSION/COMMITTEE REPORTS
.
2.
3.
4.
5.
6.
7.
Council on Aging
AirpOrt Commission
Harbor Commission
Library Commission
Parks & Recreation Commission
Planning & Zoning Commission
Miscellaneous Commissions and Committees
a. Beautification Committee
b. Kenai Convention & Visitors Bureau Board
c. Alaska Municipal League Report
d. Kenai Chamber of Commerce
ITEM E:
MINUTES
,
2.
3.
4.
5.
6.
*Regular Meeting of May 1, 2002.
*Board of Adjustment Hearing of May 1, 2002.
*Budget Work Session of April 9, 2002.
*Budget Work Session of April 10, 2002.
*Budget Work Session of April 11, 2002.
*Budget Work Session of April 16, 2002.
ITEM F:
CORRF~PONDENCE
ITEM G:
OLD BUSINESS
ITEM H:
NEW BUSINESS
Bills to be Paid, Bills to be Ratified
Purchase Orders Exceeding $2,500
o
*Ordinance No. 1956-2002 -- Amending Title 14 to Establish an
Education Zone and Change Several Sections of the Kenai Municipal
Code to Include the New Education Zone as Noted on Attachment A.
Code Sections Affected are: 14.20.030(a); 14.20.075(b); 14.20.220(c);
14.22.010 (Land Use Table); 14.24.010; and 14.25.020.
o
ITEM I:
*Ordinance No. 1957-2002 -- Amending KMC 14.20.154(a)(2) to
Eliminate the 150 Feet Buffer Between the Surface Extraction of Natural
Resources and the Adjoining Property if the Adjoining Property is Also a
Permitted Site for the Surface Extraction of Natural Resources.
Ordinance No. 1958-2002 -- Adopting the Annual Budget for the Fiscal
Year Commencing July 1, 2002 and Ending June 30, 2003.
REPORT OF THE MAYOR
ITEM J:
ADMINISTRATION REPORTS
1. City Manager
2. Attorney
3. City Clerk
ITEM K:
DISCUSSION
1. Citizens (five minutes)
2. Council
EXECUTIVE SESSION- None Scheduled
ITEM L:
ADJOURNMENT
CITY OF KENAI -DOCK RATE SCHEDULE
- -" Lin'd~ L. SnOw, City Manager
May 8, 2002
KENAI HARBOR RATE SCHEDULE
The City Manager shall establish the fees, rates, and charges for the billing and
collections for the support of the harbor. The City Manager reserves the right to
change the rate schedule at any time. Them is a 5% sales tax added to the total
invoice (3% City and 2% Borough).
RATE SCHEDULE SUMMARY
! 1. ! Product wharfage (w/crane: wio forklift)
t i Non-product wharfage (ice, nets, sta¢les, etc.)
$ 0.07/lb l
0.04/lb.
' i ' ' ' Purct~asesi Purchases t ' Purchases
Under 500 ! 500 gat. j ' 2000 gal.
Gallons i or more t or m_ore
2. Fuel Gasoline Regular 1.701 1.6511
. State Marine Tax! .050 .050.
Federal Tax i .184. .. 184
Total S/gal.J 1.93 1.88
! Diesel '" #2 1.291 1.241 ' 1.191
' ' State Marine Taxi ' .05j .05i .05
Total $/gai~ i 1.34! 1.29 1.24
tt ,
*NOTE: discounts for volume purchases are for one vessel at a time.
3. Used Oil Dumping t $1.00/gal.
4. Boat Launch Ramp ' 0-1'0 min. = $10.00
Each min. over 10 min. = $1.00/min.
Seasonal pass per boat = $100/season
5. Tie Up Fee A. Skiffs tied to land side of concrete dock $5.00/day
Seasonal Pass per boat $100/season
B. Boats tied to buoy in dver $7.00/day
6. Forklift w/Operator (1/2-hr. minimum) $50.00/hr. t
7. City Labor Charges for call out (2-hr. min.) $40.00/hr.
Other items I See Dock Manager Prior to Use j