Loading...
HomeMy WebLinkAbout2024-09-05 Parks & Recreation Packet - Work SessionKENAI PARKS & RECREATION COMMISSION WORK SESSION – CAPITAL IMPROVEMENT PLAN REVIEW 9/5/24– 6:00 P.M. KENAI CITY COUNCIL CHAMBERS 210 FIDALGO AVE., KENAI, AK 99611 *Telephonic/Virtual Information Below* www.kenai.city A. CALL TO ORDER B. INTRODUCTION – Tyler Best Parks and Recreation Director C. COMMISSION DISCUSSION – Capital Improvement Plan, reviewing plan and discussing project priorities ................................................................................. Pg 1 D. PUBLIC COMMENTS (limited to 3 minutes per individual) E. ADJOURNMENT Registration is required to join the meeting remotely through Zoom. Please use the link below to register: https://us02web.zoom.us/meeting/register/tZIvfu2ppjsiGdz3qqYX2QIDLMSOYZtyCwfd MEMORANDUM TO: Parks and Recreation Commission FROM: Tyler Best, Parks and Recreation Director DATE: 8/28/24 SUBJECT: Capital Project Review Capital Projects usually exceed $35,000. The Parks and Recreation Master Plan is an example of a capital project the Administration is working on. The current General Fund plan for FY25-FY29 is attached. Approved items from FY24, such as replacing Shelter 3 at Municipal Park, are no longer on the plan because the projects are ongoing. This memo aims to inform the Commission of the current plan and review the project priorities for the FY26-FY30 plan. 1 Page 2 of 3 Project name FY25 FY26 FY27 FY28 FY29 pending Tractor Replacement $80,000 Park and Recreation Master Plan $70,000 Tractor Replacement $70,000 Beaver Creek Replace Pavilion $50,000 Relocation of Parks and Rec to Daubenspeck $3,000,000 Old Town Playground Equipment Replacement $1,635,000 Multipurpose Facility roof-design $75,000 Park current Request to Public Works* Drop Curtin for Kenai Rec Center* $40,000 2 13 GENERAL FUND FY2025 No Project Name Total Project Cost Grant Funding City Funding 1 Wildwood Drive Rehabilitation-Construction $1,000,000 $800,000 $0* 2 Lilac Street Rehabilitation – Construction $700,000 $700,000 3 Public Main walk Replacements & ADA Warning - Design $40,000 $40,000 4 Youth Corridor Pedestrian & Roadway Improvements – 35% Design Development $160,000 $160,000 5 Emergency Services Facility Improvement – 35% Design Development $225,000 $225,000 6 Street Lighting Improvements - Construction $400,000 $400,000 7 Tractor Replacement $80,000 $80,000 8 Parks & Recreation Master Plan $70,000 $70,000 Totals $2,675,000 $960,000 $1,515,000 FY2026 No Project Name Total Project Cost Grant Funding City Funding 9 Aliak Stormwater and Paving Repair – Construction $420,000 $400,000 $20,000 10 Public Main walk Replacements & ADA Warning - Construction $560,000 $480,000 $80,000 11 Flight Services RTU Replacements $350,000 $350,000 12 Beaver Creek Replace Pavilion $50,000 $50,000 13 Tractor Replacement $70,000 $70,000 14 City Hall Improvements – Construction $800,000 $640,000 $160,000 15 ***Old Town Park Reconstruction*** $1,635,000 $981,000 $654,000 Totals $3,885,000 $2,501,000 $1,384,000 FY2027 No Project Name Total Project Cost Grant Funding City Funding 16 Future Stormwater Improvements $240,000 $200,000 $40,000 17 Gravel Roadway Improvements – Design $200,000 $200,000 18 Asphalt Roadway Improvements – Design $200,000 $200,000 Totals $640,000 $200,000 $440,000 3 14 FY2028 No Project Name Total Project Cost Grant Funding City Funding 19 Gravel Roadway Improvements – Construction $1,000,000 $800,000 $200,000 20 Asphalt Roadway Improvements – Construction $1,000,000 $800,000 $200,000 21 Florida Avenue Roadway Development – Design $120,000 $120,000 22 Relocation of Parks & Rec to Daubenspeck – Design $150,000 $150,000 23 Multipurpose Facility Roof – Design $75,000 $75,000 Totals $2,345,000 $1,600,000 $745,000 FY2029 No Project Name Total Project Cost Grant Funding City Funding 24 Relocation of Parks & Rec to Daubenspeck – Construction $3,000,000 $2,400,000 $600,000 25 Multipurpose Facility Roof – Construction $850,000 $680,000 $170,000 26 Florida Avenue Roadway Development – Construction $700,000 $700,000 Totals $4,550,000 $3,080,000 $1,470,000 Total Project Cost Grant Funding City Funding General Fund FY2025-2029 Grand Totals $14,095,000 $8,341,000 $5,554,000 ** PROJECTS WITH ASTERISK HAVE HAD ADDITIONAL CITY FUNDING PROVIDED IN PREVIOUS FISCAL YEAR(S). CITY FUNDING INDICATED IS SPECIFIC TO FISCAL YEAR AND MAY NOT INCLUDE ALL CITY FUNDING TO DATE ***Revised Project at Council’s Request 02/07/24, moved from FY2025 to FY2026*** 4 15 GENERAL FUND PROJECTS WILDWOOD DRIVE REHABILITATION - CONSTRUCTION Department: Public Works Total Project Cost: $1,000,000 Project Phased: No. Project Type: Infrastructure Funding Source(s): General Fund / Grant Potential Grant Identified: State of Alaska Operating Budget Impact: Moderate Decrease YEAR: 2025 2026 2027 2028 2029 COST: $1,000,000* Details: This project will rehabilitate Wildwood Dr. from the Kenai Spur Highway to the entrance of the Wildwood Correctional Facility, approximately 2300lf. The roadway has severely deteriorated over its 50+ year life. The State of Alaska Department of Corrections is the primary user of the roadway with 85% of all traffic accessing the facility. The project has been delayed for years due to ownership concerns of the right of way with the Kenai Native Association, and lack of available grant funds from the State. LILAC STREET REHABILITATION – CONSTRUCTION Department: Public Works Total Project Cost: $700,000 Project Phased: No Project Type: Infrastructure Funding Source(s): General Fund Potential Grant Identified: State Capital Project Submission and Federal Grants to Be Identified Operating Budget Impact: Moderate Increase YEAR: 2025 2026 2027 2028 2029 COST: $700,000 Details: This project replaces the failed concrete curb in affected areas, re-stabilizes settled subbase areas, and provides a new asphalt surface course along approximately 1600 linear feet of 30-foot wide roadway. Lilac Lane is located off the Spur Highway and Cook Inlet View Drive on the north side of Kenai. The roadway and concrete curb and gutter are suffering from the severe settlement in multiple areas. 5 16 GENERAL FUND PROJECTS PUBLIC MAIN WALK REPLACEMENTS & ADA WARNING PADS - DESIGN Department: Public Works Total Project Cost: $40,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): General Fund Potential Grant Identified: State Capital Project Submission and Federal Grants to Be Identified Operating Budget Impact: None YEAR: 2025 2026 2027 2028 2029 COST: $40,000 Details: This project will begin to address the numerous cracked public main walks in various locations around the City. Intersections will receive ADA-stamped indicator pads in yellow. YOUTH CORRIDOR PEDESTRIAN AND ROADWAY IMPROVEMENTS 35% DESIGN DOCUMENTS Department: Public Works Total Project Cost: $160,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Grant Dependent | Bonding Potential Grant Identified: State Capital Project Submission and Federal Grants to Be Identified Operating Budget Impact: Slight Increase YEAR: 2025 2026 2027 2028 2029 COST: $160,000 Details: This project seeks to improve safety, visibility & security to families accessing the Kenai Middle School, High School, Challenger Center and Ice Rink. Project extends from the Spur Highway down Tinker Ln. to Lawton Dr. turning west to Walker Ln. Sidewalks, bike lane, Roadway and Street Lighting Improvements are all proposed with the project. This is a significant project that would affect approximately 7000lf of roadway throughout our densely populated school zone. 6 17 GENERAL FUND PROJECTS EMERGENCY SERVICES FACILITY ASSESSMENT / IMPROVEMENT 35% DESIGN DOCUMENTS Department: Police Department/Fire Department Total Project Cost: $225,000 Project Phased: Yes Project Type: Facility Improvement Funding Source(s): Grant / General Fund Operating Budget Impact: None YEAR: 2025 2026 2027 2028 2029 COST: $225,000 Details: This project will evaluate the needs of the emergency services departments and assess the existing conditions of their current facility to determine whether renovations to the 50+ year old facility or new construction is the most appropriate course of action. The existing building is known to have asbestos which has limited opportunities for smaller renovations. This preliminary set of design documents will be used to seek grant opportunities. STREET LIGHTING IMPROVEMENTS - CONSTRUCTION Department: Public Works Total Project Cost: $400,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): General Fund Potential Grant Identified: DOT Grant Operating Budget Impact: Slight Decrease YEAR: 2025 2026 2027 2028 2029 COST: $400,000 Details: This project will identify underserved and problem locations for street lighting to improve safety and security for citizens. New lighting will be LED to reduce energy and maintenance costs. This first project will provide for the design and identification of locations to be served. 7 18 GENERAL FUND PROJECTS TRACTOR REPLACEMENT Department: Parks & Recreation Total Project Cost: $80,000 Project Phased: No Project Type: Equipment Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: Minimal YEAR: 2025 2026 2027 2028 2029 COST: $80,000 Details: This project will replace aging existing equipment with new. Tractor and various attachments including a wide area mower deck and snow removal components are anticipated. Equipment is planned for year-round use. PARKS & RECREATION MASTER PLAN Department: Parks & Recreation Total Project Cost: $70,000 Project Phased: No Project Type: Park Improvement Funding Source(s): Grant Dependent | Bonding Potential Grant Identified: State Capital Project Submission and Federal Grants to Be Identified Operating Budget Impact: Slight Increase YEAR: 2025 2026 2027 2028 2029 COST: $70,000 Details: This project will seek professional services to assist with the development of a Parks and Recreation Master Plan. All existing park facilities will be evaluated. The Master Plan document will be used to direct future funding toward the most desired and appropriate uses first. 8 19 GENERAL FUND PROJECTS ALIAK STORM WATER & PAVING REPAIR – CONSTRUCTION Department: Public Works Total Project Cost: $420,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): State Grant / General Fund Potential Grant Identified: None Operating Budget Impact: Slight Decrease YEAR: 2025 2026 2027 2028 2029 COST: $420,000 Details: This project will begin to address a failed stormwater line on Aliak Dr. between Candlelight Dr. and Highbush Ln. The galvanized piping has collapsed in several locations which cause the occasional sinkhole to surface after significant runoff. The photo above is from April 2021 shortly after the breakup. Staff has been filling these in with gravel and then patching the asphalt as a short-term solution. This project will require the removal of sections of the roadway and the replacement of existing stormwater piping with new and then resurfacing of the roadway. PUBLIC MAIN WALK REPLACEMENTS & ADA WARNING PADS - CONSTRUCTION Department: Public Works Total Project Cost: $560,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Grant Dependent | Bonding Potential Grant Identified: State Capital Project Submission and Federal Grants to Be Identified Operating Budget Impact: Slight Increase YEAR: 2025 2026 2027 2028 2029 COST: $560,000 Details: This project will begin to address the numerous cracked public main walks in various locations around the City. Intersections will receive ADA stamped indicator pads in yellow. Priority will be placed on higher traffic areas including school routes on Forest Ave and Frontage Rd. 9 20 GENERAL FUND PROJECTS FLIGHT SERVICES RTU REPLACEMENTS Department: Public Works Total Project Cost: $350,000 Project Phased: No Project Type: Building Improvement Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: Slight Decrease YEAR: 2025 2026 2027 2028 2029 COST: $350,000 Details: This is a planned replacement project for air handling units reaching the end of their useful life. This work will provide for the efficient and reliable function of HVAC systems at the facility currently being leased by the Federal Aviation Administration (FAA). This was a planned replacement for 2025, however units remain in service at this time. BEAVER CREEK PARK REPLACEMENT PAVILION Department: Parks and Recreation Total Project Cost: $50,000 Project Phased: No Project Type: Park Improvement / Building Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: Slight Increase YEAR: 2025 2026 2027 2028 2029 COST: $50,000 Details: Construct a new pavilion at Beaver Creek Park located just off the Spur Highway on Parkside Dr. This will be a wood frame structure consistent with other similar structures within the City. 10 21 GENERAL FUND PROJECTS TRACTOR REPLACEMENT Department: Parks & Recreation Total Project Cost: $80,000 Project Phased: No Project Type: Equipment Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: Minimal YEAR: 2025 2026 2027 2028 2029 COST: $70,000 Details: This project will replace aging existing equipment with new. Tractor and various attachments including a wide area mower deck and snow removal components are anticipated. Equipment is planned for year-round use. CITY HALL IMPROVEMENTS - CONSTRUCTION Department: Public Works Total Project Cost: $800,000 Project Phased: No Project Type: Building Improvement Funding Source(s): Grant / General Fund Potential Grant Identified: State Capital Project Submission and Federal Grants to be Identified Operating Budget Impact: Slight Decrease YEAR: 2025 2026 2027 2028 2029 COST: $800,000 Details: This project will replace the 40+ year old exterior doors, windows, exterior siding and mechanical ventilation systems. The facility has struggled with drafts and air quality issues for some time. Project is expected to reduce facility heating costs. 11 22 GENERAL FUND PROJECTS OLD TOWN PLAYGROUND RECONSTRUCTION Department: Parks and Recreation Total Project Cost: $1,635,000 Project Phased: Yes Project Type: Park Development Funding Source(s): Grant Dependent | Bonding Potential Grant Identified: State Capital Project Submission and Federal Grants to Be Identified Operating Budget Impact: Minimal to No Impact YEAR: 2025 2026 2027 2028 2029 COST: $654,000 $661,000 $320,000 Details: This project will replace aging equipment at the Park on Peninsula Ave adjacent to the Fine Arts Center. The area of Old Town attracts numerous visitors every year. The park is located two blocks from the Visitor’s Center and is in close proximity to several large housing complexes providing plenty of children to utilize the park. The project design was completed in the fall of 2023 in coordination with the Kenaitze Indian Tribe and Salamatof Native Association who are assisting with grant applications. FUTURE STORMWATER IMPROVEMENTS Department: Public Works Total Project Cost: $240,000 Project Phased: Yes Project Type: Infrastructure Funding Source(s): Grant / General Fund Potential Grant Identified: None Operating Budget Impact: Slight Increase YEAR: 2025 2026 2027 2028 2029 COST: $240,000 Details: This project will allow Public Works to continue to address stormwater runoff, culvert, and catch basin issues as they continue to deteriorate throughout the City. 12 23 GENERAL FUND PROJECTS GRAVEL ROADWAY IMPROVEMENTS – DESIGN Department: Public Works Total Project Cost: $200,000 Project Phased: No Project Type: Infrastructure / Roadway Improvement Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: Slight Decrease YEAR: 2025 2026 2027 2028 2029 COST: $200,000 Details: This project will develop bid ready construction documents to improve several existing gravel roadways within the City. Work will consist of ditching and drainage improvements, removal of soft spots, and capping of roadway with new gravel lift. The primary roadway of current concern is Phillips Ave. which experiences severe drainage issues each spring. ASPHALT ROADWAY IMPROVEMENTS - DESIGN Department: Public Works Total Project Cost: $200,000 Project Phased: No Project Type: Infrastructure / Roadway Improvement Funding Source(s): General Fund Potential Grant Identified: None Operating Budget Impact: Slight Decrease YEAR: 2025 2026 2027 2028 2029 COST: $200,000 Details: This project will provide bid ready construction documents to continue with the City’s pavement replacement plan. A Roadway Improvement Survey was completed in 2009, this document along with ongoing site assessments is directing maintenance work. Specific project to be further identified as project draws closer. 13 24 GENERAL FUND PROJECTS GRAVEL ROADWAY IMPROVEMENTS – CONSTRUCTION Department: Public Works Total Project Cost: $800,000 Project Phased: No Project Type: Infrastructure / Roadway Improvement Funding Source(s): Grant / General Fund Potential Grant Identified: None Operating Budget Impact: Slight Decrease YEAR: 2025 2026 2027 2028 2029 COST: $800,000 Details: This project will improve several existing gravel roadways within the City. Work will consist of ditching and drainage improvements, removal of soft spots, and capping of roadway with new gravel lift. The primary roadway of current concern is Phillips Ave. which experiences severe drainage issues each spring. ASPHALT ROADWAY IMPROVEMENTS - CONSTRUCTION Department: Public Works Total Project Cost: $800,000 Project Phased: No Project Type: Infrastructure / Roadway Improvement Funding Source(s): Grant / General Fund Potential Grant Identified: None Operating Budget Impact: Slight Decrease YEAR: 2025 2026 2027 2028 2029 COST: $800,000 Details: This project will continue with the City’s pavement replacement plan. A Roadway Improvement Survey was completed in 2009, this document along with ongoing site assessments is directing maintenance work. Specific project to be further identified as project draws closer. 14 25 GENERAL FUND PROJECTS FLORIDA AVENUE ROADWAY DEVELOPMENT - DESIGN Department: Public Works Total Project Cost: $120,000 Project Phased: No Project Type: Infrastructure / Roadway Improvement Funding Source(s): General Potential Grant Identified: None Operating Budget Impact: Slight Increase YEAR: 2025 2026 2027 2028 2029 COST: $120,000 Details: This is a joint project with the Water & Sewer Utility to extend a 12” water main down Florida Avenue from Fifth Street to First Street. This area of town dates to old military base days, and the existing water mains serving homes on First and Second Streets is only 4” in size. The new 12” main will divide the neighborhood so fewer homes are being served from the 4” line. As this work will destroy the roadway, roadway improvements will be included with reinstallation of concrete curb and gutter and asphalt roadway surfacing. The Water & Sewer Fund is providing funding for the water line work including design, general fund is only covering costs for roadway improvements. RELOCATION OF PARKS & REC TO DAUBENSPECK – DESIGN Department: Parks and Recreation Total Project Cost: $150,000 Project Phased: Yes Project Type: Building Funding Source(s): General Potential Grant Identified: None Operating Budget Impact: Moderate Increase YEAR: 2025 2026 2027 2028 2029 COST: $150,000 Details: This project will relocate Park & Rec facilities from their current location at 332 Airport Way over to 550 Daubenspeck where the Streets, Shop, and Building Maintenance division currently reside. A new building including garage and office space shall be provided. 15 26 GENERAL FUND PROJECTS MULTIPURPOSE FACILITY ROOF - DESIGN Department: Public Works Total Project Cost: $75,000 Project Phased: No Project Type: Building Maintenance Funding Source(s): General Potential Grant Identified: None Operating Budget Impact: None YEAR: 2025 2026 2027 2028 2029 COST: $75,000 Details: The Multipurpose facility was constructed in 1999. The ice rink facility has had a fair amount of condensation issues over the years due to maintaining heat during hockey games. This project is to acknowledge the roof will be 30 years old at this time and may be in need of replacement. RELOCATION OF PARKS & REC TO DAUBENSPECK Department: Parks and Recreation Total Project Cost: $3,000,000 Project Phased: Yes Project Type: Building / Department Relocate Funding Source(s): Grant Dependent | Bonding Potential Grant Identified: State Capital Project Submission and Federal Grants to Be Identified Operating Budget Impact: Moderate Increase YEAR: 2025 2026 2027 2028 2029 COST: $3,000,000 Details: This project will relocate Park & Rec facilities from their current location at 332 Airport Way over to 550 Daubenspeck where the Streets, Shop, and Building Maintenance division currently reside. A new building including garage and office space shall be provided. 16 27 GENERAL FUND PROJECTS MULTIPURPOSE FACILITY ROOF - CONSTRUCTION Department: Public Works Total Project Cost: $850,000 Project Phased: No Project Type: Building Maintenance Funding Source(s): Grant / General Fund Potential Grant Identified: None Operating Budget Impact: None YEAR: 2025 2026 2027 2028 2029 COST: $850,000 Details: The Multipurpose facility was constructed in 1999. This ice rink facility has had a fair amount of condensation issues over the years due to maintaining heat during hockey games. This project is to acknowledge the roof will be 30 years old at this time and may be in need of replacement. FLORIDA AVENUE ROADWAY DEVELOPMENT - CONSTRUCTION Department: Public Works Total Project Cost: $700,000 Project Phased: No Project Type: Infrastructure / Roadway & Utility Funding Source(s): General Fund / Water Sewer Fund Potential Grant Identified: None Operating Budget Impact: Moderate Increase YEAR: 2025 2026 2027 2028 2029 COST: $700,000 Details: This is a joint project with the Water & Sewer Utility to extend a 12” water main down Florida Avenue from Fifth Street to First Street. This area of town dates to old military base days, and the existing water mains serving homes on First and Second Streets is only 4” in size. The new 12” main will divide the neighborhood so fewer homes are being served from the 4” line. As this work will destroy the roadway, roadway improvements will be included with reinstallation of concrete curb and gutter and asphalt roadway surfacing. The Water & Sewer Fund is providing funding for the water line work including design, general fund is only covering costs for roadway improvements. 17