Loading...
HomeMy WebLinkAboutPZ07-54 j a~~~~ CITY OF KENAI PLANNING AND ZONING COMMISSION .~_~ RESOLUTION NO. PZ07-54 `EFieayef LANDSCAPE/SITE PLAN PERMIT I{EHAI~ SKA A RESOLUTION OF THE PLANNING AND ZONING ADMINISTRATION OF THE CITY OF KENAI APPROVING THE ATTACHED LANDSCAPINGISITE PLAN SUBJECT TO THE FOLLOWING CONDITIONS: WHEREAS, the attached Landscaping/Site Plan Review was: • Received by: Nancy Carver, Planning & Zoning Assistant • Submitted by; Jeff Miller • Submitted for: Sandra J. Vozar-Ginavan • Property Address: 510 Upland Street • Legal Description; Lot 22A Block 5 Ori final Townsite of Kenai -Vozar Addition • Parcel No.: 07407129 WHEREAS, the City of Kenai Planning and Zoning Administration finds this plan provides for orderly and safe development within the City commensurate witty pz•otecting the health, safety, and welfare of its citizens, and provides adequate and convenient open spaces, light and air in order to avoid congestion of commercial and industrial areas; and, WHEREAS, the plan appears to provide for landscaping and/or the retention of natural vegetation in conjunction with commercial and industrial development within the City; and, WHEREAS, the purpose of landscaping is to visually enhance the City's appearance and reduce erosion and storm runoff, and the plan appears to meet this criteria. NOW, THEREFORE, BE IT RESOLVED, BY THE PLANNING AND ZONING ADMINISTRATION OF THE CITY OF KENAI THAT THE LANDSCAPING/SITE FLAN IS APPROVED SUBJECT TO THE CONDITIONS ON PAGE TWO. Re i wed and approved: f Date: if -~ 0754 Res.doc Page 2 1, Fence must be wooden and meet the minimum height requirement of six-feet (6'). Anything above 6-foot will require a building permit. Fence must also extend completely along the rear property line along the alleyway. 2. Ten-foot (10') greenbelt must be located along Upland Street and as a buffer between adjoining residential lot. 3. A total of 11 parking spaces will be required one of which must be handicap accessible. Parking spaces can 6e not less than 180-square feet {9' x 20'). Handicap space must be sized to meet ADA requirements. 4. Paving must be completed within two (2) years after the certificate of occupancy is issued. 5. Snow must be removed from the site, unless a new location can be approved. 6. The dumpster will need to be located closer to Upland Street to provide access for dumping without disturbing greenbelt adjoining residential parcel. 7. All required landscaping as presented in the approved landscaping plan shall be installed within one (1) year after issuance of the certificate of occupancy. 8. An installation agreement will be required to construct and pave Overland Way to city standards, from the intersection of Upland Street to the alleyway. {Attachment A) 9. Applicant must use a licensed contractor with the city to construct Overland Way. 10. A certificate of occupancy will not be issued until Overland Way is constructed and paved. 11. Tf construction of the project has not started within one year of the approval of the landscaping/site plan, the approval shall Iapse unless extended for good cause. t y f ;~~~. ~ p,fi~ r. y~ s ~;Iw.~ RFC} l~ y;~ •Tk ~, ~: ~~ °y .; ~, ~ :. '~ ~. ~~~~ ~ -"~%-~ ~~~~ ~ ~, ~f, ~-~.. ~, ~, ~, ~..: ~, ~, ~~. \~ ~' , ~ i ,~~ ~~ ~~~ .. ~siY•'. f~.r..h' ~` F T ^r ~~ ~. G ~. ~~ .~ ~ ~~ ~, r `~~ ., ~ r .ti ~ ~ . ~ ~~ ../ ~r f ~. ~. ~# ./ . ~ ~: ~,f ~~ 4y~y fir. ~ r ~ ,',_,- ~~~ ~~'~ ~ y ~` ~~r: ~ ~l' ., ~ ~~ _. v"~ h f>~~ ~ J G~~ ~ ~ ~ ; ~' ^r -- _. ~.._ -....