Loading...
HomeMy WebLinkAboutPZ09-02the eriyof KENAI, ALASKA CITY OF KENAI PLANNING AND ZONING COMMISSION RESOLUTION NO. PZ09 -02 A RESOLUTION OF THE PLANNING AND ZONING COMMISSION OF THE CITY OF KENAI, ALASKA, RECOMMENDING TO THE COUNCIL THAT THE DEVELOPMENT REQUIREMENTS TABLE IN KMC 14.24.020 BE AMENDED TO PROVIDE FOR FRONT SETBACKS OF TWENTY -FIVE (25) FEET, SIDE AND REAR SETBACKS OF TEN (10) FEET IN THE LIGHT INDUSTRIAL (IL), HEAVY INDUSTRIAL (IH), CENTRAL COMMERCIAL (CC), GENERAL COMMERCIAL (CG) AND CENTRAL MIXED USE ZONES (CMU). WHEREAS, the City of Kenai Zoning Code has a Development Requirements Table in KMC 14.24.020; and, WHEREAS, the Development Requirements Table sets out the front, rear and side yard setbacks in non commercial zones but does not set specific requirements for commercial, industrial and the central mixed use zone; and, WHEREAS, proper land use planning should include standard minimum setbacks in all zones; and, WHEREAS, it is in the best interest of the citizens of the City of Kenai to include minimum setbacks for commercial, industrial and the central mixed use zone; and, WHEREAS, the proper setbacks in such zones should be twenty -five (25) feet for the front yard setback and ten (10) feet for the side and rear yard setbacks. PASSED BY THE PLANNING AND ZONING COMMISSION OF CITY OF KENAI, ALASKA, this 28TH day of January 2009. O ac CHAIRMAN New text underlined [DELETED TEXT BRACKETED AND ALL CAPS] ZONING DISTRICTS USES C /RR RR1 RS RS1 RS2 RUITSH IL /IHICC /CG /CMU R ED LC MINIMUM LOT WIDTH (feet) 90 90 60 60 60 60 See individual sections 90 90 90 of Code for requirements MINIMUM LOT SIZE (feet) Front' 25 25 25 25 25 10 25 25 25 25 Side i [SEE INDIVIDUAL One- Story 15 5 5 5 5 SECTIONS OF CODE 15 15 15 Daylight Basement/ 15 10 10 10 10 FOR 15 15 15 REQUIREMENTS] Split Level 10 Two Story 15 15 15 15 15 15 15 15 Rear 20 20 20 20 20 10 10 20 20 20 Maximum Lot 30% 30% 30% 30% 30% 40% 30% 30% 30% Coverage Maximum Height (feet) 35 35 35 35 35 35 Footnotes: (1) Provided that the minimum front setback is measured from any right -of -way or access easement. (2) Side setbacks are determined independently from the front view of the stnicture. Plot plan/As -built will distinguish single and two story portions of building to verify setback distances are met. (3) Story is that portion of a building included between the upper surface of any floor and the upper surface of the floor next above or the ceiling or roof above. One -story is defined as a story having direct access from grade level without a lower story. A structure having a lower story situated below a one -story is considered a one -story structure in its entirety. Two -story is defined as one -story plus more than one -half (I /2) the height of the lower story all situated above grade. Daylight basement/split level is defined as one -story plus less than one -half (1 /2) the height of the lower story all situated above grade. For purposes of these footnotes, Grade is defined as the lowest point of elevation of the finished surface of the ground between the building and a line five (5) feet from the building. (4) Except that for each story over two (2) stories, each side and rear yard shall be increased three (3) feet, but need not exceed fourteen (14) feet for each side yard and nineteen (19) feet for the rear yard. Resolution PZ09 -02 Attachment "A" Chapter 14.24 Table 14.24.020 DEVELOPMENT REQUIREMENTS TABLE