Tillage with a Past, Gity with a Future
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794
Telephone: 907 283 -7535 FAX: 907 283 -3014 it li
1992
TO: Parks Recreation Commission
FROM: Robert J. Frates, Parks Recreation Directo
DATE: May 19, 2010
SUBJECT: Proposed Park off Marathon Road
At the last regular meeting of April 1 administration shared several different development
concepts (A1 -A3, B1 -133, C1 -5) submitted by Alaska State Parks. Please refer to City Manager's
memorandum dated March 26, 2010 including the attached conceptual plans.
As reported at the last meeting, administration's preliminary review of the concepts resulted in
the preferred alternative of the following: Phase I (B -1), Phase II (C -4), and Phase III (B -3).
Please see the attached map labeled Preferred Alternative. This will be the base map from
which we plan to work from.
As noted, the purpose of this meeting is to solicit input from the public with respect to the
project. I have also included a sample form which can be used for those wishing to provide
written comments.
Thank you for your time and dedication. Please feel free to contact me should you have any
questions.
attachments
North
n
to ww
A
5 h-
Ff
a:
booNwalk fishigd
Magl[A
ynopeny bou
terrace psi,
slopped Mr
terrace pathway
0eppea
Mrracepathway
slopped turf
no ion
1,.,1 11 c
CITY OF KENAI
POCKET PARK MAGIC POND
PROJECT
CONCEPTA
North
6
3
e
3
CITY OF KENAI
POCKET PARK MAGIC POND
PROJECT
CONCEPT Et
North
CITY OF KENAI
POCKET PARK MAGIC POND
PROJECT
CONCEPT C
MEMO:
'Village with a Past, Gc with a Future'
210 FideIgo Avenue, Kenai, Alaska 99611 -7794 t,
Telephone: 907 283 -7535 FAX: 907 283 -3014 I I I I' r
1992
TO: Parks Recreation Commission
FROM: Rick Koch, City Manager
DATE: March 26, 2010
SUBJECT: Proposed Park, Marathon Road Magic Avenue
The purpose of this correspondence is to present information and to discuss the above
referenced subject.
The property encompassing a small lake (material source) along Marathon Road recently was
returned to City care and custody. Many residents of Kenai already use the lake for recreational
purposes, such as swimming, kayak training, retrieval training for dogs, etc.
The City Council is supportive of the area being improved to support park and recreation
activities. The City contracted with Alaska State Parks to provide development concepts. Plans
showing three concepts were included in your meeting packet, and larger plan sheets are
attached to this document.
Other groups have expressed an interest in being involved in the development of the Park they
include the Kenai Rotary Club, and the Youth Restoration Corps.
I have also been contacted by several residents of the neighborhood to the east of the
proposed Park asking to be included in the planning process. I told them the City would
advertise for, and hold a public meeting to solicit ideas, comments and suggestions.
For each of the Concepts, "A "B and "C", Administration has identified components within
each concept. These are depicted by areas on the conceptual plan sheets, such as "A -1 A -2"
etc. We have estimated costs for each of the Concepts and the individual components. These
cost estimates are also attached to this correspondence.
The cost estimates are predicated on the assumption the project components will be bid and
constructed by a licensed general contractor in their entirety. This includes the requirement
that Title 36 prevailing wages must be paid.
In actuality it is Administration's desire to see the improvements constructed through a
cooperative effort including non profits, individuals, and private contractors. This should result
in overall lower development costs while engaging the community on this project.
In reviewing the Concepts and the individual components be aware the preferred alternative
may be a combination of components from different Concepts, and /or design features not yet
included on any of the Concepts. For example, Administration's preliminary review of the
Concepts resulted in a preferred alternative of the following:
Phase I B -1
Phase II —C -4
Phase III B -3
Prior to defining specific improvements it's important the Parks Recreation Commission,
Administration and City Council, define what activities are allowed and not allowed at the
Park. For example, something similar to the following:
Activities which are Allowed
1. Ice Skating
2. Swimming
3. Picnics
4. Warming fire in shelter
5. Retrieval training for dogs
6. Kayaking and canoeing
Activities which are Not Allowed
1. Fishing
2. Any motorized activity in park, except for parking in designated area(s) or
maintenance
Administration recommends the Parks Recreation Commission schedule a public meeting to
solicit input and discuss the project with the public. Administration can participate as the
presenters at the public meeting if that is the direction of the Parks Recreation Commission.
Thank you for your attention in this matter. We look forward with working with the Parks
Recreation Commission on this important and exciting project.
If you have any questions, please contact me at your convenience.
attachments
Component
A -1
Cost Item Description
Mobilization Demobilization
Unclassified Excavation
Classified Fill Baclsfill
Crushed Aggregate base Course
Asphalt (2')
Striping
Signage
Swim Beach
Shelter with Fireplace
Shelter
Trail
Component Cost Stem Description
A -2 Mobilization Demobilization
Wetlands Boardwalk
Fushing /Viewing Platform
Component
A -3
Cost item Description
Mobilization Demobilization
Swim Beach
Shelter
Trail
Landscaping Improvements
Pr posed Park
arath n Road Ma E Avenue
C ®incept oa
Cost Est
Unit Quantity Unit Cost
LS 1 5,000.00
CY 600 12.00
Ton 1500 14.00
Ton 120 25.00
Ton 80 125.00
LS 1 1,000.00
LS 1 750.00
LS 1 5,000.00
LS 1 40,000.00
LS 1 25,000.00
LF 1100 15.00
Totai Estimate Component A -1
Unit
LS
SF
SF
Unit
LS
LS
LS
LF
LS
Page 1 of 2
Sub -Tot&
Design (10
Contingency (15
Quantity
1
360
500
Sub -Tot&
Design (20
Contingency (15
Tot& Estimate Component A -2
Quantity
1
1
1
2300
1
Sub -Total
Design (10
Contingency (15
Unit Cost
5,000.00
5,000.00
25,000.00
15.00
10,000.00
3/25/2010
Scab -Total
5,000.00
7,200.00
21,000.00
3,000.00
10,000.00
1,000.00
750.00
5,000.00
40,000.00
25,000.00
16,500.00
134,450.00
13,445.00
22,184.25
170,079.25
Unit Cost Sub -Total
10,000.00 10,000.00
125.00 45,000.00
125.00 62,500.00
117,500.00
23,500.00
21,150.00
152,150.00
Sub -Total
5,000.00
5,000.00
25,000.00
34,500.00
10,000.00
79,500.00
7,950.00
13,117.50
Tot& Estimate Component A -3 100,567.50
Component
A -4
Cost item Description
Mobilization Demobilization
Trail
Landscaping Improvements
p sed Park
ath n Road Ma ::ic A
Concept
List Esti
Unit
LS
LF
LS
Page 2 of 2
e H
uantity
1
1500
Sub -Total
Design (10
Contingency (15
162,150.00
100,567.50
Cost Estimate
170,079.25
79,062.50
Total 511,859.25
Unit Cost
5,000.00
15.00
35,000.00
Total Estimate Component A -4
3/25/2010
Sub -Total
5,000.00
22,500.00
35,000.00
62,500.00
6,250.00
10,312.50
79,062.50
Pr'tp.sed Park
arathon R T d Magic Avenue
Page 1 of 2
PP
3/25/2010
Conte t
Cyst Est
Component Cost Item Description Unit Quantity Unit Cost Sub -Total
B -1 Mobilization Demobilization LS 1 5,000.00 5,000.00
Unclassified Excavation Cy 600 12.00 7,700.00
Classified Fill Backfill Ton 1500 14.00 21,000.00
Crushed Aggregate base Course Ton 120 25.00 3,000.00
Asphalt (2') Ton 80 125.00 10,000.00
Striping LS 1 1,000.00 1,000.00
Signage LS 1 750.00 750.00
Swim Beach LS 1 5,000.00 5,000.00
Shelter with Fireplace LS 1 40,000.00 40,000.00
Vaulted Toilet LS 1 30,000.00 30,000.00
Trail LF 800 15.00 12,000.00
Sub -Total 134,950.00
Design (10 13,495.00
Contingency (15 22,266.75
Total Estimate Component B -1 170,711.75
Component Cost item Description Unit Quantity Unit Cost Sub -Tot&
B -2 Mobilization Demobilization LS 1 5,000.00 5,000.00
Boardwalk Dock SF 200 125.00 25,000,00
Trail LF 2200 15.00 33,000.00
Landscaping Improvements LS 1 30,000.00 30,000.00
Sub -Total 93,000.00
Design (20 18,600.00
Contingency (15 16,740.00
Total Estimate Component B -2 128,340.00
Component Cost Item iescription Unit Quantity Unit Cost Sub -Total
B -3 Mobilization Demobilization LS 1 5,000.00 5,000.00
Trail LF 2600 15.00 39,000.00
Sub -Total 44,000.00
Design (10 4,400.00
Contingency (15 7,260.00
Total Estimate Component B -3 55,660.00
Pr ost d Park
arathen R *ad arc Av
C rive t PA H
C *st Estimate
Page 2 of 2
3/25/2010
ark
nath d Ma lc
Ctst Estimate
Component Cost item Description Unit Quantity Unit Cost Sub -Total
C -1 Mobilization Demobilization LS 1 5,000.00 5,000.00
Unclassified Excavation CY 600 12.00 7,200.00
Classified Fill Backfill Ton 1500 14.00 21,000.00
Crushed Aggregate base Course Ton 120 25.00 3,000.00
Asphalt (2') Ton 80 125.00 10,000.00
Striping LS 1 1,000.00 1,000.00
Signage LS 1 750.00 750.00
Swim Beach LS 1 5,000.00 5,000.00
Shelter LS 1 25,000.00 25,000.00
Vaulted Toilet LS 1 30,000.00 30,000.00
Trail LF 1300 15.00 19,500.00
Sub -Total
Design (10
Contingency (15
Total Estimate Component C-1 161,224.25
Component Cost item Description Unit Quantity Unit Cost Sub -Total
C -2 Mobilization Demobilization LS 1 5,000.00 5,000.00
Swim Beach LS 1 5,000.00 5,000.00
Trail LF 1500 15,00 22,500.00
Landscaping improvements LS 1 7,500.00 7,500.00
Sub -Total
Design (10
Contingency (15
Tot& Estimate Component C -2 50,600.00
Component Cost Item Description Unit Quantity Unit Cost Sub -Total
C -3 Mobilization Demobilization LS 1 5,000.00 5,000.00
Dock Theater LS 1 100,000.00 100,000.00
Vaulted Toilet LS 1 30,000.00 30,000.00
Trail LF 900 15.00 13,500.00
Landscape Improvements LS 1 5,000.00 5,000.00
Sub -Total
Design (10
Contingency (15
3/25/2010
127,450.00
12,745.00
21,029.25
40,000.00
4,000.00
6,600.00
153,500.00
15,350.00
25,327.50
Total Estimate Component C -3 194,177.50
Page 1 of 2
Component
C-4
Component
C-5
M
h
p
c
Cost Item Description
Mobilization Demobilization
Unclassified Excavation
Classified Fill Backfill
Crushed Aggregate base Course
Asphalt (2')
Striping
Signage
Swim Beach
Shelter
Vaulted Toilet
Trail
Landscape Improvements
Horshoe Box
Shelter
Cost item lescription
Mobilization Demobilization
Boardwalk
p
d Park
ad Maglc Av
ce st C
st Est
Unit Quantity
LS 1 5,000.00
CY 600 12.00
Ton 1500 14.00
Ton 120 25.00
Ton 80 125.00
LS 1 1,000.00
LS 1 750.00
L5 1 5,000.00
LS 1 25,000.00
LS 1 30,000.00
LF 2600 15.00
LS 1 45,000.00
LS 1 3,000.00
LS 2 25,000.00
Total Estimate Component C-4
Unit
LS
LF
Page 2 of 2
rn
Quantity
1
500
nue
Sub-Total
Design (10%)
Contingency (15%)
Sub-Total
Design (20%)
Contingency (15%)
Unit Cost
Total Estimate Component C-5
Summary
C-4
Total
Cost Estimate
161,224.25
50,600.00
194,177.50
309,861.75
93,150.00
809,013.50
3/25/2010
Unit Cost Sub-Total
5,000.00
7,200.00
21,000.00
3,000.00
10,000.00
1,000.00
750.00
5,000.00
25,000.00
30,000.00
39,000.00
45,000.00
3,000.00
50,000.00
244,950.00
24,495.00
40,416.75
309,861.75
Sub-Total
5,000.00 5,000.00
125.00 62,500.00
67,500.00
13,500.00
12,150.00
93,150.00
he cil of,
KENAI, ALASKA
Comment(s)
Village with a Past, Gc with a Future
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794
Telephone: 907 283 -7535 Fax: 907 283 -3014
www.ci.kenai.ak.us
Public Comment Form
May 27, 2010
Name:
Mailing Address:
Phone:
Email Address:
PROPOSED PARK DEVELOPMENT PROJECT
OFF MARATHON ROAD