HomeMy WebLinkAboutResolution No. PZ2010-05CITY OF KENAI
PLANNING AND ZONING COMMISSION
RESOLUTION NO. PZ10 -05
LANDSCAPE /SITE PLAN PERMIT (PRELIMINARY)
A RESOLUTION OF THE PLANNING AND ZONING ADMINISTRATION OF THE CITY OF KENAI
APPROVING THE ATTACHED PRELIMINARY LANDSCAPING /SITE PLAN SUBJECT TO THE
FOLLOWING CONDITIONS:
WHEREAS, the attached preliminary Landscaping/Site Plan was:
Received by: Marilyn Kebschull, AICP, City Planner
Submitted by: Billy Moore, Project Designer, O'Reilly Auto Parts
Submitted for: O'Reilly Auto Parts
Property Address: 10511 Kenai Spur Highway
Legal Description: Lot 1A, Sprucewood Glen Subdivision No. 10
Parcel No.: To Be Assigned New Subdivision
WHEREAS, the City of Kenai Planning and Zoning Administration finds this plan provides for orderly
and safe development within the City commensurate with protecting the health, safety, and welfare of its
citizens, and provides adequate and convenient open spaces, light and air in order to avoid congestion of
commercial and industrial areas; and,
WHEREAS, the plan appears to provide for landscaping and/or the retention of natural vegetation in
conjunction with commercial and industrial development within the City; and,
WHEREAS, the purpose of landscaping is to visually enhance the City's appearance and reduce erosion
and storm runoff, and the plan appears to meet this criteria.
NOW, THEREFORE, BE IT RESOLVED, BY THE PLANNING AND ZONING ADMINISTRATION
OF THE CITY OF KENAI THAT THE LANDSCAPING /SITE PLAN IS APPROVED WITH THE
FOLLOWING REQUIREMENTS: See Page 2.
Date:
4.21
and approved:
Resolution PZ1 0-05 Page 2
This is a preliminary plan submitted to review the proposed development and provide feedback
to assist with preparation of the final construction documents. The final plan should include the
following:
1. Landscaping plan should include scientific or common name or type of planting
materials and typical planting details.
2. Additional landscaping should be considered to meet the intent of KMC 14.25.040.
3. Final plan must identify snow storage area(s) and identify drainage patterns for the
development.
iJli
jptlt+
1 1 1 111 ii011
POD
hiBliklot OHO
rAnh
Igggig
..N
5�5
dr
'Lo
Hi
,M888
ep /M ,OL ean/Jne p9M1Vd UagdsV
A Om dd7.foaV Jgr °W
Hai 9F IMO Peadg
k
Q
iii L-z.- .79Zf}N
NOVBL35 W3i1 Al
AV
WO rzels
SSI2IVA 11/1 /2I AA H WM'S NAM
M
0)
J�J
"4
3 .LO,BL.LM N
NMI N3LVIA '3'V 'NYF] .AL
L L LL LAL Fkad ''0 u'LLI
NNLL4 [6 ALP
6 t
g� a�
1g nigt
LL
855