HomeMy WebLinkAbout2008-09-17 Council Packet - Work SessionREMINDER:
COUNCIL WORK SESSION
FY10 C.I.P. LIST
SEPTEMBER 17, 2008
5:00 P.M.
COUNCIL CHAMBERS
*A LIGHT DINNER WILL BE PROVIDED.
the eiyof
KENAI, ALASKA
MEM
Tillage with a Past, Cc with aFaturell
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794
Telephone: 907- 283 -7535 / FAX: 907- 283 -3014 IIIIr
o:
TO: City Council
it FROM: Rick Koch
DATE: September 12, 2008
SUBJECT: City of Kenai Capital Improvements Program (CIP) Priorities
for State & Federal Funding Requests for FY 2010
Attached please find a spreadsheet and supporting information for our discussion to
establish capital priorities for State and Federal funding requests.
I did not receive any requests from Council to date. If you have any projects you wish to
have included in the discussion please let me know at your earliest convenience so I can
prepare cost estimates and descriptions of the scope.
Thank you for your attention in this matter.
attachment
1992
CITY OF KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR STATE & FEDERAL FUNDING REQUESTS FOR
FY 2010
PRIORITY
NUMBER
PROJECT TITLE
DESCRIPTION
FUNDING
REQUESTED
NOTES /COMMENTS
1
Kenai River Bluff Erosion /Stabilization
Approximately one -mile of the bluff along the Kenai River is
exhibiting substantial erosion. Several hundred feet of the
original townsite have been lost over the last century. The
U.S. Corp of Engineers estimates the rate of erosion to be 3
feet per year. Over the next 50 years, in excess of $ 50
million (in 2006 dollars) of property and improvements will be
lost, without the construction of stabilization improvements.
The total cost estimate for the project is $ 20 million.
Approximately $ 1.5 million has been spent to date on
preliminary engineering & studies. Kenai voters approved a $
2 million bond sale at the October 2007 election.
$ 18,000,000.00
The bluff erosion project has been the City of Kenai 's
number one Federal and State funding priority for at least
the previous thrree years. Administration is requesting
funding from the Governor and area Legislators. To date,
funding of approximately $ 1.5 million has been
appropriated by Alaska's congressional delegation, but the
outlook for additional federal funding is not good. The
citizens of Kenai approved a G.O. bond proposition in the
amount of $ 2,000,000 in 2007. Given the State of Alaska's
present financial condition the opportunity to recieve
funding is as good as it has been in some years.
2
New Water Transmission Mains, New
Well House, New Well(s) & Replacemnt
of AC Transmission Main. ADEC
Municipal matching Grant Project
Project would construct approximately 10,500 If of new 16"
transmission main, replace approximately 3,200 It of aging
asbestos cement trasnmission main, decommission
municipal production wells # 1 & # 3 which have high arsenic
levels, construct a new well in the vicinity of well # 2 a new
wellhouse, controls, stand -by power generation, and other
related improvements. This with other previouskly recieved
grants and project funding will provide higher quality water
and increased volumes to meet present and future system
demands.
$ 2,070,000.00
We have applied to ADEC for this project and it appears we
have scored high enough for t to be a SFY 10 grant funded
State project under the municipal matching grant program.
We also have received a grant from the USEPA in the
amount of $ 288,000 that can be used as a portion of the
match for this project. The grant program requires a 30%
match from the city. By using the EPA funding as a part of
that match the City will need to provide $ 599,142.
3
Kenai Community Library Expansion
Project would expand the existing Kenai Community Library
by approximately 10,000 s.f., or roughly double the size of the
existing facility. Voters in Kenai approved a bond sale in the
amount of $ 2 million, for a project presently estimated at $
5.3 million
$ 1,000,000.00
To date the project has received or has commitments for
funding in the amount of $ 3,920,000. This includes $
2,000,000 for G.O. Bonds, $ 1,500,000 from the Rasmuson
Foundation, & $ 170,000 from the Friends of the Kenai
Community Library. Additional fundraising efforts are
ongoing.
4
Paving & Improvements to City Streets
The City of Kenai maintains approximately 20 miles of gravel
surfaced roadways within it's municipal boundaries. The cost
of maintenance of gravel roadways is high, dust from gravel
roadways is a health issue for the elderly & young. The $ 1
million requested will be used as a 50% match to support
local improvement districts
$ 1,000,000.00
Administration recommends that a project of this type be
perpetually included in capital project requests to the
Borough and State.
Page 1 of 4
Prepared by: R. Koch
CITY Or KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR STATE & FEDERAL FUNDING REQUESTS FOR
FY 2010
PRIORITY
NUMBER
PROJECT TITLE
DESCRIPTION
FUNDING
REQUESTED
NOTES /COMMENTS
5
Visitor Center Heating System
Replacement
The in -floor heating system is failing. The sytem loses
approximately 20 gallons of water per day. To replace the
system a 2" layer of lightweight concrete floor would be
poured including new heat tubing. This is an extensive project
requiring demolition and replacement of existing flooring, and
adjustment to doors, trim, and piping systems
$ 250,000.00
The City has received $ 71,000 as a partial settlement for
the defective heat tubing used during initial construction.
Additional settlement funds may be available.
6
New Fire Engine
This new fire engine would replace an existing 26 year old fire
engine. Our 1982 fire engine is the oldest equipment
presently in use at the Fire Department, and was one of the
last years in which "open jump seat" fire engines were
allowed by code. The old engine has reached the end of it's
useful life and should be replaced.
$ 500,000.00
7
Capital Improvements to Support State
Personal Use Fishery
This project would purchase Low Ground Pressure (LPG)
vehicles (2), portable solid waste receptacles (12), portable
fish waste receptacles (8) to facilitate the removal of what
has become large volurnes of trash and fish waste left on the
beach. In addition this project would purchase and install the
following:
$ 400,000.00
8
Bridge Access Road, Pedestrian
Pathway
This project would construct a pedestrian pathway from the
Kenai Spur Highway to Kalifornsky Beach Road along Bridge
Access Road. This area is heavily traveled by pedestrians,
sight seer's, bicyclists, etc. This project is approximately 2
miles long and would complete the 24 mile Unity Trail that
connects Kenai and Soldotna, along both the Spur Highway
$ 2,000,000.00
9
Kenai Soccer Park Restroom &
Concession Facility
Project would provide for restrooms and concession facility at
new soccer fields. State Soccer Cup scheduled for 2009
$ 150,000.00
Administration encourages soccer association to seek
grant funding.
10
New Soccer Fields Irrigation
Project would design and install irrigation system for four
soccer fields
$ 250,000.00
11
Energy Efficient Street Lighting
Throughout the city there are intersections and other areas
such as school bus stops that do not have overhead street
lights. The city installs a number of lights each year.
However, there are always more needs than available
funding .
$ 100,000.00
Administration recommends that a project of this type be
perpetually included in capital project requests to the
Borough and State.
12
Public Works Shop Building
Project would construct a new PW shop building
approximately 10,000 sf in size
$ 4,000,000.00
Page 2 of 4
Prepared by: R. Koch
CITY OF KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR STATE & FEDERAL FUNDING REQUESTS FOR
FY 2010
PRIORITY
NUMBER
PROJECT TITLE
DESCRIPTION
FUNDING
REQUESTED
NOTES /COMMENTS
13
Re -Model of Public safety Emergency
Communications Center
This project would re- configure the dispatch area including air
filtration systems, electrical systems, and underfloor wiring
trays. Additionally some new work stations and furniture
would be purchased.
$ 75,000.00
14
Silver Salmon Drive Paving (Pillars Boat
Launch Access Road)
Project would repair area of large frost heave, and construct
a paved roadway from the end of the existing pavement to
the ADNR parking lot/boat launch at the end of the road at
the Kenai River. Cost estimate is based on City
administration of project.
$ 500,000.00
The existing roadway is gravel and poorly maintained.
Maintenance is performed by ADNR (1 believe on a contract
basis). The City recieves numerous complaints each year
from users of the road and from property owners in the
area as they believe it is a City responsibility. If the State
agrees to repair and upgrade the road to an asphalt
standard the City should consider assuming maintenence
responsibilities.
15
Kenai Municipal Boat Launch,
Peplacement of Damaged Concrete
Planks
This project would design and install replacement concrete
planks on the boat launch ramp. The two older boat launch
ramps have planks at the lower elevation that have been
damaged by winter ice and by equipment during the annual
removal of silt.
$ 100,000.00
16
Maintenance Shop Site Remediation
ADEC Spill # 1994230110102
The city maintenance shop area has been identified by ADEC
as a contaminated site. Barrels of petroleum products and
oils were disposed of on this site and measurable levels of
pollutants have been identified in an adjacent waterbody. This
project would remove contaminated soils, buried containers
and barrels. A subsequent phase of this project would
remediate the contaminated soils, dispose of
containers /barrels, and install monitoring wells.
$ 250,000.00
17
City Hall HVAC Improvements
The current system does not provide uniform heat in the
winter and does not include air conditioning (cooling) in the
summer. The present system also does not provide an
adequate number of air changes to meet current code
requirements. The copy room which contains the computer
servers is consistently at a significantly elevated temperature.
$ 150,000.00
18
Expansion of Animal Control Shelter
This project would design and construct an addition to the
Animal Control Shelter. The specific scope of work would
roughly double the existing kennel block.
$ 450,000.00
19
City of Kenai Campground for
TentNehicle
Project would construct a tent/vehicle campground located at
the Kenai Sports Complex( ?) located at Section 36
$ 200,000.00
Page 3 of 4
Prepared by: R. Koch
CITY G. KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR STATE & FEDERAL FUNDING REQUESTS FOR
FY 2010
PRIORITY
NUMBER
PROJECT TITLE
IDESCRIPTION
FUNDING
REQUESTED
NOTES /COMMENTS
20
Relocation of Sr. League /American
Legion Baseball Field
Project would include roads, parking, water /sewer and
construction of an adult baseball field
$ 750,000.00
N/A
Lower Kenai River Drift Boat Pull -Out
Project would provide lower river access point for pull -out of
drift boats only.
$ 500,000.00
N/A
Kenai Spur Highway - Upgrade Five
Intersections
This project is proposed to provide safety improvements to
Beaver Loop, Thompson Park, Strawberry Road, Silver
Salmon, and TBD to include turn lanes and lighting. Traffic
accidents at these intersections usually involve at least one
vehicle traveling at a high rate of speed, and are of significant
severity.
$ 3,000,000.00
This project should rank high on the STIP and be funded by
the State and /or FHWA
NIA
Kenai Spur Highway - Upgrade to Five
Lane configuration Between Soldotna
and Kenai
Conflicting traffic patterns (through traffic vs
business /residential traffic) and increased traffic counts have
increased the number and severity of accidents beteen Kenai
& Soldotna. Planned commercial developments will
significantly increase traffic in the near future
$ 30,000,000.00
This project should rank high on the STIP and be funded by
the State and /or FHWA
Page 4 of 4 Prepared by: R. Koch
Public Works Department
DRAY]
2010 CAPITAL IMPROVEMENT PRIORITY LIST
FOR STATE AND FEDERAL FUNDING
City of Kenai — Public Works Department
Project Name
Estimated Amount
Description
Kenai River Bluff
$14,000,000.00
Approximately one mile of the bluff along the Kenai River is exhibiting
Erosion /Stabilization
substantial erosion. Several hundred feet of the original town site have
been lost over the last century. The U.S. Corp of Engineers estimates
the rate of erosion to be 3 feet per year. Over the next 50 years in
excess of $50 million (in 2006 dollars) of property and improvements will
be lost without the construction of stabilization improvements.
New Water Transmission Mains
$2,084,126.00
Component #1: New Production Well No. 4 and Well House
(Phase II) & Well House
Improvements
$301,950.00
Component #2: Upgrade Existing Well No. 2 & Equipment
$4,294,400.00
Component #3: Construct 16" Water Main from Well #
$1,180,960.00
Component #4: Replace 10" AC Water Main with 10" HDPE Water Main
$2,818,200.00
Component #5: Construct New 16" Water Main Along Bridge Access
Rd. from Kenai Spur to Beaver Loop
$922,625.00
Component #6: Construct New 10" HDPE Water Main Along Swires Rd.
from Kenai Spur to Lawton Drive
$7,233,380.00
Component #7: Construct New 16" Water Main Along Beaver Loop
Road from Bridge Access to Lawton Drive
$18,835,641.00
Total for all Phases
Kenai Public Library Expansion
$4,000,000.00
Project would double the existing Kenai Municipal Library to
approximately 40,000SE. Voters in Kenai approved a bond sale in the
amount of $2 million in support of the six million dollar project.
2010 Capital Improvement Plan — Public Works Department
Page 1
DRAFT
Project Name
Estimated Amount
Description
Kenai Spur Highway — Upgrade
$3,000,000.00
Project would provide safety improvements to Beaver Loop, Thompson
Five Intersections
Park, Strawberry Road, Silver Salmon, and TBD to include turn lanes
and lighting. Traffic accidents at these intersections usually involve at
least one vehicle traveling at a high rate of speed and are of significant
severity.
Maintenance Shop Site
$150,000.00
The city maintenance shop area has been identified by ADEC as a
Remediation
contaminated site. Barrels of petroleum products and oils were disposed
ADEC Spill # 1994230110102
of on this site and measurable levels of pollutants have been identified
in an adjacent body of water. This project would remove contaminated
soils, buried containers and barrels. A subsequent phase of this project
would remediate the contaminated soils, dispose of containers /barrels,
and install monitoring wells.
City Hall HVAC Improvements
$150,000.00
The current system does not provide uniform heat in the winter and
does not include air conditioning (cooling) in the summer. The present
system also does not provide an adequate number of air changes to
meet current code requirements. The copy room which contains the
computer servers is consistently at a significantly elevated temperature.
Wildwood Drive Pavement
Replacement
$750,000.00
Wildwood Drive is exhibiting complete failure of the roadway paving,
The roadway was paved by the Air Force to support its military
installation. Subsurface excavation and backfill is required to construct a
structural road base. The Department of Corrections at the Wildwood
Correctional Facility is the primary user of Wildwood Drive. This project
will re- construct Wildwood Drive.
Paving & Improvements to City
$1,000,000.00
The City of Kenai maintains approximately 20 miles of gravel- surfaced
Streets
roadways within its municipal boundaries. The cost of maintenance of
gravel roadways is high; dust from gravel roadways is a health issue for
the elderly & young. The $1 million requested will be used as a 50%
match to support local irnprovement districts
Streetlights
$100,000.00
Throughout the city there are intersections and other areas such as
school bus stops that do not have overhead streetlights. The city installs
a number of lights each year. However, there are always more needs
than available funding.
2010 Capital Improvement Plan — Public Works Department
Page 2
DRAF2
Project Name
Estimated Amount
Description
Energy Conservation Measures
for City Buildings
$100,000.00
Efficiencies and resulting savings could be achieved in City buildings
and streetlights by making them more "green." Funding would convert
present heating and lighting systems to more efficient alternatives.
Kalifornsky Beach Road,
Pedestrian Pathway
$800,000.00
This project would construct a separated pedestrian pathway from
Bridge Access Road to Cannery Road, a distance of approximately two
miles. There is significant pedestrian and bicycle traffic along this
highway.
Bridge Access Road,
pedestrian Pathway
$2,000,000.00
This project would construct a pedestrian pathway from the Kenai Spur
Highway to Kalifornsky Beach Road along Bridge Access Road. This
area is heavily traveled by pedestrians, sightseers, bicyclists, etc. This
project is approximately two miles long and would complete the 24 -mile
Unity Trail that connects Kenai and Soldotna along the Spur Highway
and Kalifornsky Beach Road.
Silver Salmon Drive paving
(Pillars Boat Launch Access
Road)
$500,000.00
Project would repair area of frost heaves and construct a paved
roadway from the end of the existing pavement to ADNR parking lot!
boat launch at the end of the road at the Kenai River.
Public Works Shop Building
$4,000,000.00
The Public Works Shop was constructed in the 1960 and building
additions and conexes have been added over time. This project would
construct a new PW shop building approximately 24,967 SF in size.
Kenai Recreation Center Built -n
Counters & Central Staff Area
$25,000.00
Project would construct new counters, desks & storage drawers in
central office area.
Kenai Cultural Center Kitchen
Remodel
$30,000.00
Replacement of dated appliances and remodeling counters and food
handling areas. This will facilitate food preparation for events at the
Cultural Center. Also, remodel would eliminate exterior unused closet
that takes away from needed indoor floor space.
Kenai Multi- Purpose Facility
Ventilation Improvements
$35,000.00
The ice rink is experiencing substantial amounts of condensation and
the resulting problems associated with "raining" onto the ice surface.
The building is almost completely enclosed and moisture from the ice
resurfacing does not have adequate ventilation to escape from the
building. This results in uneven and rough ice surfaces that require
significant additional maintenance efforts to remove. This project would
install one or more ventilate fans to mechanically ventilate the building.
2010 Capital Improvement Plan — Public
orks Depari:men
Page 3
DRAFT
Project Name
Estimated Annount
Description
Kenai Animal Shelter
Expansion
$300,000.00
The Shelter services the Greater Kenai area. The number of animals
handled by the center has increased dramatically and is straining the
capacity (animal adoptions up 52 %, euthanizations down 25 %,
investigations up 22 %, annual rabies clinic participation up 43 %, and
revenue up 75 %. This project would extend 52' from existing shelter
(mechanical and storage space in between) and would expand the
shelter by approximately 2,000 SF.
Kenai Boat Launch Parking
Area Paving & Improvements
$100,000.00
The parking lot at the boat launch area is presently unpaved. This
requires significant maintenance throughout the year to grade and
remove potholes. The area has been prepared for paving by previous
projects. This project would also construct overhead signage with
changeable information directing boat launch users if ramps were
"launch" or "take- out? These designations could be changed depending
on traffic flow to, or from the river. This would enhance the efficiency of
the boat launch ramp during peak periods of use (State personal use
fishery).
Conflicting traffic patterns (through traffic vs. business /residential traffic)
and increased traffic counts have increased the number and severity of
accidents between Kenai and Soldotna. Planned commercial
developments will significantly increase traffic in the near future.
Kenai Spur Highway — Upgrade
to Five Lane Configuration
Between Kenai and Soldotna
$30,000,000.00
Kenai Recreation Center HVAC
Improvements
$35,000.00
Project would improve ventilation system to handball courts. Courts are
used for handball, racquetball and wallyball.
First Street Reconstruction from
Florida Avenue to California
Avenue
$360,000.00
Reconstruct approximately 1,300 lineal feet of existing improved
roadway. Project would include demolition and replacement of existing
curb and gutter and paving. The streets and gutters are beyond repair.
Park Host Facility at Municipal
Park
$50,000.00
Project would provide water, sewer & power to Park Host Camp Area at
Municipal Park.
Kenai Spur Highway —
Streetlights, Main Street to
Forrest Drive
$100,000.00
ADOT /PF Maintenance has requested our assistance in seeking funding
from the legislature to ADOT /PF to install new wiring and lights in this
area.
Kenai Recreation Center Fire
Alarm System
$50,000.00
Project would replace an often - malfunctioning fire alarm system.
Existing system is original from facilittconstruction.
2010 Capital Improvement Plan — Public Works Depaitment
Page 4
DRAFT
Project Name
Estimated Amount
Description
Senior Center — Office Space
$50,000.00
There is a need to re -model and construct new office space at the
Senior Center. Both Senior Center employees share an office making
confidential conversations with seniors difficult and at times impossible.
A small conference room is needed for discussions with staff & seniors.
Chip Seal & Seal Coat Existing
Paved Roads
$550,000.00
This project would chip and seal coat existing paved streets in Old
Town, Central Heights Subdiv., Inlet View Subdiv., Redoubt Subdiv.,
Woodland Subdiv. The last time the City seal coated these streets was
1988. It needs to be done again to extend the life of the pavement.
Highland Subdivision Pavement
Replacement
$250,000.00
This project will repave Silver Salmon Drive & Kind Salmon Dr. in
Highland Subdiv. This pavement is beyond repair and must be replaced.
Surface Drainage
Improvements
5375,000.00
$200,000.00
This project is to replace infiltration basins with underground storm
drains and /or improve the infiltration basin, if possible. Specific areas
include Lake St., Windward Dr., Equinox Way, Inlet Woods Dr., Channel
Way, Woodside Avenues, Toyon Way, Pine Ave. and others.
Project would make the entrance to the Senior Center safer for elders
during winter months.
This project would construct a combination heated /unheated City
storage facility. Each City department would have a heated, special area
for storage and another outside covered area for storage of vehicles,
small equipment and miscellaneous items.
Development of approximately 55 acres of raw property for a sports
complex to include: 4 baseball fields, 3 softball fields, 1 storage facility,
1 concession facility, 2 restrooms, irrigation, play area and campground.
If space is available, a shared artificial cocker /football field could be
developed as well.
City needs to have redundant equipment for critical systems at the
WWTP. Additional equipment spares would greatly improve system
reliability & security for a vital public health function. Project would also
include plant expansion to accommodate lost lab and equipment repair
space when installing the second belt filter press. Funds would also be
applied to expensive but needed system maintenance to the Digester
and Belt Press and other Plant improvements.
Senior Center — Heated
Sidewalks & Driveways
City Storage Facility
$300,000.00
$500,000.00
Kenai Outdoor Sports Complex
Wastewater Treatment Plant
(WWTP) Upgrades
2010 Capital Improvement Plan — Public Works Department
Page 5
DRAFT
Pro'ect Name
Estimated Amount
Description
Wastewater Treatment Plant
$256,000.00
Component 1: Add second Belt Filter Press
(VVVVTP) Upgrades
(Continued)
$92,000.00
Component 2: Replace Primary and Standby Digester Blowers
$100,000.00
Component 3: Replace both Basin Blowers with variable speed for
significant energy economy.
$140,000.00
Component 4: Expand Control Building 20'x50' for lab space and
equipment repair area lost from adding second Belt Filter Press
$100,000.00
Component 5: Clean Digester & inspect piping and diffuser
$30,000.00
Component 6: Upgrade Belt Press panel which is rusted out and needs
new components.
$50,000.00
Component 7: Pave remaining approach to Plant parking lot
$768,000.00
Total
2010 Capital Improvement Plan — Public Works Department
Page 6
Public Safety Department
Kenai Animal Shelter
Project Name: Kennel Block Accommodations Extension
Department: Animal Control
Department Head: Chief of Police, Gus Sandahl 46
Prepared By: Patricia Stringer
Project Description: Expansion to existing kennel block. New construction would be a
duplicate of existing kennel block, extending 52ft out from the existing building, with
storage and mechanical rooms between. Existing perimeter fence would be moved and
extended to accommodate new construction.
Project Justification: Animal care and welfare has been an integral part of the City of
Kenai policy since early 1980. Over the years, the Kenai Animal Shelter has become a
model for animal care and welfare with innovative programs to aid adoptions that many
other shelters in Alaska try to emulate. At this time, the Kenai Animal Shelter is able to
house 19 dogs and 21 cats. Housing for small caged animals such as mice, rats, ferrets,
rabbits, and birds has to be placed on any available table top, very often out of public
view. The Animal Shelter has seen a significant increase in intake numbers over the last
three years, with adoptions up 52 %, euthanizations down 25 %, investigations up 22 %,
the annual Rabies clinic participation up 43 %, and revenue up 75 %. Existing dog
kennels often have to be used to house two dogs at a time, and many times six or more
puppies have to be housed together. This creates hazards for the staff as well as the dogs.
Multiple dogs in one kennel have little or no space to defecate without standing in it and
getting it all over each other. The kennel has to be sanitized numerous times throughout
the day, and the dogs have to be bathed multiple times while available for adoption. The
outside drop kennels have been closed down due to lack of kennel space. The success of
outreach programs such as public education, weekly radio broadcasts, and an Internet
website for adoptable animals has dramatically increased public awareness of animals in
need in our area. This has also increased the amount of owners who relinquish their
animals to the shelter knowing the animal will be well cared for and have a very good
chance of a new home. Foot traffic has significantly increased due to consistent and
longer open hours.
Estimated Cost: $300,000 * (Estimate prepared by Biazy Construction August 2008)
Anticipated Operating Implications: During construction phase, existing kennel would
not be compromised and daily activity would continue as normal. More security checks
by KPD may be required at night while fencing is being replaced.
Potential Project Funding: City funds. I am looking for other available grant funding.
Desired Project Timing: As soon as possible.
4
Vfholt Foo bport 52t18,1972 q
Nettled Intechta 18¢345Er44 tg
44/44444¢V close. stonoos tot 1.4¢¢tet
hatthoow tow otig¢to1 Lowtowt
catered wait to ¢ otd holt
9%;0
A Y�F
Kenai Police Department
Project Name: 911 PSAP and Dispatch Center Redesign
Department: Communications
Department Head: Chief Gus Sandahl rs
Prepared By: Michael Nusbaum
Project Description: Redesign of emergency communication center. Remove existing
equipment and furniture. Rewire room to provide for more electrical outlets, replace flooring
system, drop ceiling, paint room and provide for adequate HVAC and air filtration. Introduce
modern furniture and equipment to comply with recommended national guidelines.
Project Justification: The Kenai Police Department's Communication Center is the heart of the
Police Department. Currently the Center houses network servers and various computers and is
the location where all radio traffic, walk -in customers, 911 calls and administrative calls are
received. The amount of equipment stored in the Center has grown exponentially over the years.
All electrical outlets in the room are overloaded with a lack of current overprotection on some
outlets (NENA -04 -001 Generic Standards for E9 -1 -1 PSAP Equipment and NENA -04 -502
PSAP CPE Site Characteristics address these issues). The Center lacks an effective air filtration
system and has experienced computer outages due to excessive dust buildup inside computer
equipment. It is unknown if the current HVAC system meets the national recommended
standards referenced in the previous NENA documents. The Center also is in need of a more
effective furniture design that utilizes all available space and conforms to more ergonomic
standards. A dedicated system for running wiring needs to be installed as wires of all types are
exposed under work surfaces and vulnerable to interference and accidental interruption. The
Center is operating in a room which was originally designed as a standard work office but should
be modernized to house a vital Public Safety Answering Point.
Estimated Cost: $40,000+ (Estimate for furniture prepared with the assistance of W right Line in
April, 2008).
Anticipated Operating Implications: During work phase, operations would need to be
relocated to another location within the Kenai Police Department. This would necessitate
assistance from ProComm Alaska for radio equipment, ACS for telephone equipment, computer
consultants for computer networking and The Kenai Peninsula Borough MIS Department for 911
systems.
Potential Project Funding: City funds. I have been unable to locate a grant which covers
equipment /furniture in our area. Further investigation may yield grant funding though.
Desired Project Timing: As soon as possible.
Workstation is Ergonomic sit to stance unit; has height adjustments of rear /front surfaces.
ale) fe,r 4a tit
equipment us _
All Drawings are proprietary and not to be shared with other vendors, Wright Line, Julie.Bell @wrightline.com
Wright Line Technical Furniture for Dispatch
Cable Mgt.
and Power
Hookups
Removable Steel panels;
no tools required. Allows
access to hardward and
cables without tearing
apart the furniture
Ergonomic Units are expandable vertically &
horizontally for future configurations.
Flat Panel Arms
CPU Storage
Fire Department
INTEROFFICE MEMORANDUM
KENAI FIRE
DEPAR TMENT
Date: August 28, 2008
To: Rick Koch
From: Chief Tilly
Subject: Recommendation for CIP
Rick,
Attached is a written justification for the replacement of Engine 2. I would like to
have you consider this for placement on the CIP list for the City. If there are any
questions or further explanation please do not hesitate to call.
Justification for replacement of Kenai Fire Department
1982 Spartan Pumper
The purpose of this correspondence is to inform the reader of the need for replacement of the oldest
fire truck in our fleet. Engine 2 was purchased in 1982 and may be the last "open jump seat" apparatus
still on the road in the state. Because of the inherent danger of the open jump seat configuration and
the lack of safety to the occupants, apparatus manufacturers will not produce them and have not for
many years.
As recently as 2002, we have had a close call with this apparatus that placed 3 employees in
unnecessary danger. While responding to a reported structure fire in Engine 2 on slick winter roads,
approaching traffic reacted in an unsuspecting manner with one vehicle pulling out of his lane of traffic
and into the apparatus's direction of travel. The Engineer attempted to slow the vehicle but with a slow
reacting, conventional braking system, the vehicle was sent into a skid and left the highway. The driver
did well to maintain a straight path so as not to roll the vehicle which would have undoubtedly killed the
crew members. Still attempting to slow the vehicle, the apparatus driver hit a driveway and literally
jumped the vehicle. As this was all happening the FF in the rear facing jump seat was being thrown
around and almost pitched from the open cab seat which would have ensured him serious if not fatal
injuries.
The Captain, because of the poorly designed cab and lack of adequate restraint systems, jammed his
head into the ceiling when the vehicle "jumped" the driveway, resulting in a neck injury. The accident
destroyed the water tank and the compounding forces of 2000 gallons of water from being pounded,
lead to damage of equipment in compartments and weeks of being out of service.
OPEN CAB
I feel that continued use of this apparatus continues to place unnecessary risk and danger to
responders. NFPA 1901, Standard for Automotive Fire Apparatus states "each crew riding position shall
be within a fully enclosed personnel area." (This was added to NFPA 1901 in 1991.) This allows for not
only structural stability, but safety in case of a roll over. A firefighter having to ride outside in -10 to -20
degree weather while responding to calls experiences a -61 degree wind chill factor. This is what they
have to deal with just getting to the emergency. This vehicle was built and designed in 1982 when lap
belt restraints were the norm in this application. Presently, NFPA also has addressed this by mandating
that each crew riding position shall be provided an approved seat belt design. Communications
between the Captain and his crew is almost impossible with the open cab design as well. Information
concerning the response and initial reports given to the Captain while in route must be relayed to the
crew. Presently, yelling through and open window over the wind and engine noise creates a very
inefficient means of communicating. Ultimately poor information or misinformation could again place
firefighters in unnecessary danger. A present standard for cab design describes a headset
communication system between the front of the cab and the responders in the rear. This addressed the
assurance of good communications and the heating protection for the occupants.
BRAKES
Currently, all apparatus built under NFPA 1901, Standard for Automotive Fire Apparatus, comes with all
wheel anti -lock brakes. This safety feature has shown its importance is present on all passenger
vehicles. A NHTSA study, was released in 2000, stated ABS "appears to be beneficial in preventing
pedestrian crashes, rollovers, run - off -road crashes and frontal crashes with another moving vehicle."
Most important in winter driving, antilock brakes ensure controlled braking and vehicle control. In hind
site this braking option very well may have prevented the off road excursion in 2002.
Another inherent problem with older braking systems is their tendency to "fade ". Large vehicles that
haul large amount of weight tax their braking system routinely. With the expectations of a fire engine to
make a quick response, under multiple heavy braking while responding to a call, Engine 2 experiences
serious brake fade creating a situation where the brakes will almost fail completely. New mandates
from NFPA 1901 state that engines will have an engine braking system installed. An engine braking
system help extend the brake life of a vehicle and ultimately the braking performance of heavily laden
vehicles.
VEHICLE CONFIGURATION
Changes and advancements in firefighting tools, tactics and operations have led to outfitting apparatus
with new and different appliances. This particular vehicle was designed when 2.5" hose was the norm.
The hose beds were designed to store and deploy 2.5" hose. Advancements in design have led to the
industry changing to 5" or 6" supply hose. At present we utilize 5" but placing this hose on a tuck not
designed to do so had lead to hose being "self deployed" while driving across town which is not only
dangerous to firefighters, but the driving public.
WILDAND URBAN INTERFACE
As identified in the 2006 Hazardous Fuel Mitigation planning for the City of Kenai, our department does
not have a CAFS or Compressed Air Foam fire fighting system on any of our vehicles. These systems are
becoming common place on vehicles and invaluable when dealing with the wildland urban interface
issues that out town has. These systems are especially helpful when manning issues are considered.
CAFS systems are also extremely effective on residential or commercial fires.
SCENE LIGHTING
For what ever reason, this vehicle was never designed with an electrical generation system in place. On
scene lighting is very important to scene safety. Everything from basic trip and fall hazards to identifying
real world hazards like exposed and live electrical wires can be avoided with decent scene lighting. This
apparatus also does not have the compartment space to accommodate a gasoline generator.
Integration of a hydraulic generation system or power converter would accommodate this on a new
apparatus.
REPLACEMENT SCHEDULE
The City has a replacement schedule for all large vehicles and each department pays into this
replacement fund for the purchasing of new vehicles on certain time intervals. Engine 2, for some
reason, has continued to have that time pushed back. It is my belief that the original time for
replacement was 2002 which would have made this vehicle 20 years old at the time of replacement.
This replacement date was adjusted some time ago to 2009. At 27 years old this also seems like a logical
time for replacement. Again this time has been altered with a present date of 2014 making for a 32 year
old first line vehicle for emergency response. In the United States, an antique car is generally defined as
a car over 25 years of age, this being the definition used by the Antique Automobile Club of America
CONCLUSION
NFPA states that "Apparatus that were not manufactured to the applicable NFPA fire apparatus
standards or that are over 25 years old should be replaced." Engine 2 is presently 27 years old and is in
need of replacement for the reason stated above. The reasoning for extending the replacement date to
2014 is questionable. Also stated in NFPA 1901, "To maximize fire fighter capabilities and minimize risk
of injuries, it is important that fire apparatus be equipped with the latest safety features and operating
capabilities. In the last 10 to 15 years, much progress has been made in upgrading functional capabilities
and improving the safety features of fire apparatus."
Parks & Recreation Commission
CAPITAL IMPROVEMENT PRIORITY LIST FOR STATE
AND FEDERAL FUNDING
Parks & Recreation
2010 CIP List
Ranking
Project
Estimated
Amount
Description
Removed due to
Resolution to
State
Lower Kenai River Drift
Boat Pull -Out
$500,000
Land acquisition,
engineering and
development.
2
Kenai Sports Complex
Restroom & Concession
Facility
$150,000
Funds would provide for
restrooms and concession
facility at the new Kenai
Sports Complex (soccer
fields).
7 (tie)
Kenai Recreation Center
Built-
In Counters & Central Staff
Area
$20,000
Project would include
construction of new
counter space, desks and
storage drawers in main
lobby area.
4
Campground
$200,000
Project would construct a
campground near the
Kenai Sports Complex
(Sect. 36). Campground
would help relieve some
of the parking /camping
congestion at the north
beach during dip net.
1
Sr. League /American
League
Baseball field
$300,000
Project would include
road, parking,
water /sewer and
construction of one (1)
baseball field (Sect. 36)
3
Kenai Sports Complex
(Soccer Fields) Irrigation
$100,000
Project would provide
underground irrigation for
the Kenai Sports Complex
(soccer fields).
7 (tie)
Willow St. Landscape
Enhancements
$350,000
Project would provide new
street light illumination,
sidewalks, planters, trees
and reestablish turf in
right -of -ways.
6
Skate Park Improvements
$50,000
Project will add new skate
components to existing
park.
5
Kenai Dunes Heavy Use
Area Protection Project -
2008
$445,000
Project will include
elevated walkways (3),
ADA Ramps (6), fencing
and revegetation.
7 (tie)
Kenai River Bluff
Erosion /Stabilization
Project
$18M
Project will provide
erosion
control /stabilization of
bluff at the mouth of the
Kenai River.
Harbor Commission
CAPITAL IMPROVEMENT PRIORITY LIST FOR STATE
AND FEDERAL FUNDING
Kenai Dock Facility
2010 CIP List
Project
Estimated Amount
Description
Land acquisition, engineering
and development.
Lower Kenai River Drift Boat
Pull -Out
$500,000
Cathodic Protection System
$95,000
Project will provide protection
to the submerged portions of
the support pilings from
external corrosion.
Kenai Dunes Heavy Use Area
Protection Project - 2008
$445,000
Project will include elevated
walkways (3), ADA Ramps (6),
fencing and revegetation.
Kenai River Bluff
Erosion /Stabilization Project
$18M
Project will provide erosion
control /stabilization of bluff at
the mouth of the Kenai River.
Concrete Ramps
$80,000
Project will provide for
replacement of damaged
concrete slabs.
NORTON CORROSION LIMITED
August 18, 2008
via e -mail: wogle @,ci.kenai.ak.us
Wayne Ogle
City of Kenai
Public Works Director
Kenai, Alaska
8820 222' Street SE, Woodinville, WA 98072
Phone (425) 483 -1616 • Fax (425) 485 -1754
e -mail: jweiser @nortoncorrosion.com
Subject: BUDGETARY COST ESTIMATE
NEW CATHODIC PROTECTION (CP) SYSTEM FOR CITY DOCK
Dear Wayne:
In our 2007 Annual Inspection report of other City facilities, Norton Corrosion Limited (NCL)
recommended an inspection of the city dock to allow us to see the dock again, size an
appropriate CP system, and provide a budgetary cost, with our design to follow at a later time for
installation in 2009. We delivered a brief conceptual design with budgetary costs in our August
8, 2008 letter to you. The City subsequently requested further details. NCL answers that request
below, asking you to realize the City did not authorize a complete CP design nor has one been
prepared by NCL.
We base the details that follow upon installations typical to that which we propose for the City of
Kenai. "Breaking -out" our costs as indicated below also allowed us to more specifically
evaluate and adjust the labor effort required, and add a cost for NCL's CP design not previously
included. This represents a change in the total cost from our August 8 letter.
DESIGN CONCEPTS
Two key reasons shape our Cathodic Protection design concepts and recommendations for this
structure:
1) Mud surrounding the dock limits the practical installation of a galvanic CP system.
2) Tidal conditions will also limit the effectiveness of the CP system.
NCL proposes an impressed current style CP system requiring continuous AC power to the
rectifier unit and the electrical bonding of all dock support piles. The rectifier will convert AC
power to DC power, and drive anodes placed in three 80' anode deepwells. With this "positive"
circuit installed; the "negative" circuit is complete when all piles are electrically connected.
Each deepwell will have an anode junction box
current output of each anode within the well. A
to a main anode junction box. The three anode
where a single anode header cable will route to
mounted on top of the deepwell to measure the
separate lead cable from each well will connect
deepwell leads will meet at a common bus bar
and terminate at the AC- powered rectifier. Pin
NORTON CORROSION LIMITED
CITY OF KENAI Crry DOCK
AUGUST 18, 2008
PAGE 2
brazing of bond cables at each support pile will provide necessary electrical bonding, connecting
all piles electrically.
PROPOSED SCOPE OF WORK
NCL proposes to provide the City of Kenai with a CP system design, CP specialty materials,
drilling and backhoe services, and on- site "wonting- supervision" with labor to support the
installation of three 80' anode deepwells and the bonding of dock piles. We will assist the driller
to load the deepwells, and complete all DC connections. We will commission and perform Post -
installation Acceptance Testing, and then present O &M's with our final report.
Costs are provided for each major "section" of the work we propose. A "breakout" of each
Corrosion Engineering and Installation "subsection" is also provided.
ITEM QTY U/M DESCRIPTION
MATERIALS AND FREIGHT TO THE JORSITE 827,017.83
DEEPWELL
1 1 ea Air - cooled NEMA 3R 40 Volt 80 Amp Rectifier with NRTL testing
2 1 ea Rectifier Stand for Item 1
3 18 ea 1" dia. x 60" MMO Tubular Anodes- average 60' #8 Halar leads
4 18 ea Anode Spacers
5 180 ft 1" Vent Pipe
6 200 ft 1" PVC Schedule 40 Conduit
7 1 ea PVC Cement
8 6 ea 1" PVC Couplings
9 4 ea Wire Tags
10 3 ea 1" PVC End Caps
11 10 rolls Scotch 33+ Tape
1.2 120 bags Cokebreeze
13 100 ea #10 -16 x 1/2" Zinc- plated Self Tapping Pan Head Screws
14 3 ea 8" Anode Well Caps
15 6 ea 1" EYS Sealing Fittings
16 1 ea Sealing Compound for EYS
17 6 ea 1" x 3" Rigid Nipples
18 7 ea 1" Myers Hubs
19 3 ea 8 -wire Burndy Unitaps
20 3 ea Anode Junction Boxes
21 3 ea 1" LB Fittings
22 3 ea 1" Conduit Clamps
23 30 ft 1" Rigid Conduit
24 400 ea #2 HMWPE Cable
25 3 ea Unistrut (shallow) x 6" long
26 1 ea Paint - Hammerite Smooth Yellow
27 1 ea Nylon Cable Ties- 8" Black, package of 100
28 4 ea Anode Junction Box Name Plates
NORTON CORROSION LIMITED
CITY OF KENAI Crry DOCK
AUGUST 18,2008
PAGE 3
29 I ea Main Anode Junction Box
30 1 ea 4 -wire Bu.rndy Unitap
31 210 ft 2" PVC Schedule 80 Conduit
32 2 ea 2" Myers Hubs
BONDING
33 1,500 ft #2 HMW /PE wire
34 75 ea 35mm Lugs
35 75 ea 8 mm Direct Pins
36 75 ea 8 mm Ferrules
37 l gal Mastic 160
CORROSION ENGINEERING & INSTALLATION LABOR $63,614.29
38 16 hrs. Engineering design & drawings ($5,484.00)
39 94 hrs. NCL's Construction Foreman and laborer will supervise and assist
our driller to load three 80' deepwells. NCL will provide drilling,
baekhoe, and all completed DC wiring connections. On -site —70
hours to install deepwell and energize new system. Includes 1
mob /demob and all travel expenses. ($49,204.50)
40 50 hrs. After new CP system is energized 30 days, NCL's Corrosion
Engineer will return to evaluate CP system performance. Our
Corrosion Engineer will perform polarized potential testing, adjust
as necessary, and retest. ($6,781.79)
NCL's Corrosion Engineer will prepare and deliver our
Commissioning and Annual Inspection Report with details of raw
data collected, observations, conclusions, and recommendations.
This report will also include O&M manuals for new construction.
($2,144.00)
Total Cost- three deepwells, one rectifier, and pile bonding
installed with freight to jobsite and Corrosion Engineering and
Installation Labor
$90,632.12
We ask The City of Kenai to:
• provide all utility "locates" for the installation site.
• obtain all permits including electrical, and supply 120 VAC power for the rectifier.
• provide a basket truck or scaffolding to allow NCI., to complete bonding of the
support piles.
• provide potable water to the driller.
• handle and dispose of excess water produced by driller.
Our costs are based upon this installation being in an open gravel or soils area, and returning the
site to the same condition. (Asphalt or paving work is not included in our costs.) Drill spoils
will be left on site. We will stockpile contaminated soils and handle them as directed by the
City. Additional work outside this Scope of Work will be at the following daily rates when NCL
is already on -site: Corrosion Engineer at $1,660; Construction Foreman at $1,266. Our daily
NORTON CORROSION LIMITED
CITY OF KENAI CITY DOCK
AUGUST 18, 2008
PAGE 4
rates include expenses. We base our costs on standard in -house wage rates, and do not include
provisions for Davis -Bacon wages.
Terms: Net 30 days on approved credit. FOB NCL, installed. Our work can begin 7 -9 weeks
after we receive your Notice to Proceed. Proposal validity- 60 days. Additional time on site for
our Construction Foreman is $1,009.15 per day; Corrosion Engineer is $1,553.15 per day. NCL
requests at least 3 weeks advanced notice for on -site work to control our airfare costs.
This is a firm cost proposal for the work proposed. We ask the City to understand that NCL's
design has not been authorized or finalized, and is subject to change.
Your returned authorization (below) via fax can serve as our Notice to Proceed with our design.
Thank you for the opportunity to present this proposal. We look forward to your positive response.
(7) SC \PBC \CITYOFICENAI DOCK_A
Authorized by Date
CITY OF KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR STATE & FEDERAL FUNDING REQUESTS FOR
FY 2010
PRIORITY
NUMBER
PROJECT TITLE
DESCRIPTION
FUNDING
REQUESTED
NOTES /COMMENTS
�1
cc
Kenai River Bluff Erosion /Stabilization
Approximately one -mile of the bluff along the Kenai River is
exhibiting substantial erosion. Several hundred feet of the
original townsite have been lost over the last century. The
U.S. Corp of Engineers estimates the rate of erosion to be 3
feet per year. Over the next 50 years, in excess of $ 50
million (in 2006 dollars) of property and improvements will be
lost, without the construction of stabilization improvements.
The total cost estimate for the project is $ 20 million.
Approximately $ 1.5 million has been spent to date on
preliminary engineering & studies. Kenai voters approved a $
2 million bond sale at the October 2007 election.
$ 18,000,000.00
The bluff erosion project has been the City of Kenai's
number one Federal and State funding priority for at least
the previous thrree years. Administration is requesting
funding from the Governor and area Legislators. To date,
funding of approximately $ 1.5 million has been
appropriated by Alaska's congressional delegation, but the
outlook for additional federal funding is not good. The
citizens of Kenai approved a G.O. bond proposition in the
amount of $ 2,000,000 in 2007. Given the State of Alaska's
present financial condition the opportunity to recieve
funding is as good as it has been in some years.
New Water Transmission Mains, New
Well House, New Well(s) & Replacemnt
of AC Transmission Main. ADEC
Municipal matching Grant Project
Project would construct approximately 10,500 If of new 16"
transmission main, replace approximately 3,200 If of aging
asbestos cement trasnmission main, decommission
municipal production wells # 1 & # 3 which have high arsenic
levels, construct a new well in the vicinity of well # 2 a new
wellhouse, controls, stand -by power generation, and other
related improvements. This with other previouskly recieved
grants and project funding will provide higher quality water
and increased volumes to meet present and future system
demands.
$ 2,070,000.00
We have applied to ADEC for this project and it appears we
have scored high enough for t to be a SFY 10 grant funded
State project under the municipal matching grant program.
We also have received a grant from the USEPA in the
amount of $ 288,000 that can be used as a portion of the
match for this project. The grant program requires a 30%
match from the city. By using the EPA funding as a part of
that match the City will need to provide $ 599,142.
3
Kenai Community Library Expansion
Project would expand the existing Kenai Community Library
by approximately 10,000 s.f., or roughly double the size of the
existing facility. Voters in Kenai approved a bond sale in the
amount of $ 2 million, for a project presently estimated at $
5.3 million
$ 1,000,000.00
To date the project has received or has commitments for
funding in the amount of $ 3,920,000. This includes $
2,000,000 for G.O. Bonds, $ 1,500,000 from the Rasmuson
Foundation, & $ 170,000 from the Friends of the Kenai
Community Library. Additional fundraising efforts are
ongoing.
Paving & Improvements to City Streets
The City of Kenai maintains approximately 20 miles of gravel
surfaced roadways within it's municipal boundaries. The cost
of maintenance of gravel roadways is high, dust from gravel
roadways is a health issue for the elderly & young. The $ 1
million requested will be used as a 50% match to support
local improvement districts
$ 1,000,000.00
Administration recommends that a project of this type be
perpetually included in capital project requests to the
Borough and State.
Page 1 of 4
Prepared by: R. Koch
CITY OF KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR STATE & FEDERAL FUNDING REQUESTS FOR
FY 2010
PRIORITY
NUMBER
PROJECT TITLE
DESCRIPTION
FUNDING
REQUESTED
NOTES /COMMENTS
Visitor Center Heating System
Replacement
P
The in -floor heating system is failing. The sytem loses
approximately 20 gallons of water per day. To replace the
PP Y 9 P Y� P
system a 2" layer of lightweight concrete floor would be
poured including new heat tubing. This is an extensive project
requiring demolition and replacement of existing flooring, and
adjustment to doors, trim, and piping systems
$ 250,000.00
The City has received $ 71,000 as a partial settlement for
the defective heat tubing used during initial construction.
9 9�
Additional settlement funds may be available.
291/,0
JJ /6
New Fire Engine
This new fire engine would replace an existing 26 year old fire
engine. Our 1982 fire engine is the oldest equipment
presently in use at the Fire Department, and was one of the
last years in which "open jump seat" fire engines were
allowed by code. The old engine has reached the end of it's
useful life and should be replaced.
$ 500,000.00
�2s�f`�
7
Capital Improvements to Support State
Personal Use Fishery
it14.4 /" °y
1"
This project would purchase Low Ground Pressure (LPG)
vehicles (2), portable solid waste receptacles (12), portable
fish waste receptacles (8) to facilitate the removal of what
has become large volumes of trash and fish waste left on the
beach. In addition this project would purchase and install the
following: . Boh permanent 1. Both permanent fencinc7 and reusable temporary fencing to
protect the Kenai River dunes from pedestrian and vehicular
traffic during the fishery.
2.Permanent and re- usable temporary signage.
3. Trash /Fish Waste Transfer Stations (2).
4. Upgrades to the Municipal Boat Launch Ramp to more
efficiently accomodate large volumes of boating traffic during
the fishery.
$ 400,000.00
8 -czt,-
Bridge Access Road, Pedestrian
Pathway
' a e'%?
f it a
This project would construct a pedestrian pathway from the
Kenai Spur Highway to Kalifornsky Beach Road along Bridge
Access Road. This area is heavily traveled by pedestrians,
sight seer's, bicyclists, etc. This project is approximately 2
miles long and would complete the 24 mile Unity Trail that
connects Kenai and Soldctna, along both the Spur Highway
and Kalifornsky Beach Road.
$ 2,000,000.00
.' A
knai Soccer Park Restroom &
Concession Facility
Project would provide for restrooms and concession facility at
new soccer fields. State Soccer Cup scheduled for 2009
$ 150,000.00
Administration encourages soccer association to seek
grant funding.
(li
New Soccer Fields Irrigation
Project would design and install irrigation system for four
soccer fields
$ 250,000.00
Page 2 of 4
Prepared by: R. Koch
CITY OF KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR STATE & FEDERAL FUNDING REQUESTS FOR
FY 2010
PRIORITY
NUMBER
PROJECT TITLE
DESCRIPTION
FUNDING
REQUESTED
NOTES /COMMENTS
'li,..
Energy Efficient Street Lighting
/d�
�eW Rz
Throughout the city there are intersections and other areas
such as school bus stops that do not have overhead street
lights. The city installs a number of lights each year.
However, there are always more needs than available
funding .
$ 100,000.00
Administration recommends that a project of this type be
perpetually included in capital project requests to the
Borough and State.
"`
Public Works Shop Building
Project would construct a new PW shop building
approximately 10,000 sf In size
$ 4,000,000.00
�p
.0
1
Re -Model of Public safety Emergency
Center
This project would re- configure the dispatch area including air
filtration systems, electrical systems, and underfloor wiring
trays. Additionally some new work stations and furniture
would be purchased.
$ 75,000.00
' /
/�
4
14
Silver Salmon Drive Paving (Pillars Boat
Launch Access Road)
Project would repair area of large frost heave, and construct
a paved roadway from the end of the existing pavement to
the ADNR parking lot/boat launch at the end of the road at
the Kenai River. Cost estimate is based on City
administration of project.
$ 500,000.00
The existing roadway is gravel and poorly maintained.
Maintenance is performed by ADNR (I believe on a contract
basis). The City recieves numerous complaints each year
from users of the road and from property owners in the
area as they believe it is a City responsibility. If the State
agrees to repair and upgrade the road to an asphalt
standard the City should consider assuming maintenence
responsibilities.
(v
'/ �g
Kenai Municipal Boat Launch,
Peplacement of Damaged Concrete
Planks
This project would design and install replacement concrete
planks on the boat launch ramp. The two older boat launch
ramps have planks at the lower elevation that have been
damaged by winter ice and by equipment during the annual
removal of silt.
$ 100,000.00
7/
d"
Maintenance Shop Site Remediation
ADEC Spill # 1994230110102
The city maintenance shop area has been identified by ADEC
as a contaminated site. Barrels of petroleum products and
oils were disposed of on this site and measurable levels of
pollutants have been identified in an adjacent waterbody. This
project would remove contaminated soils, buried containers
and barrels. A subsequent phase of this project would
remediate the contaminated soils, dispose of
containers /barrels, and install monitoring wells.
$ 250,000.00
Page 3 of 4
Prepared by: R. Koch
CITY OF KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR STATE & FEDERAL FUNDING REQUESTS FOR
FY 2010
PRIORITY
NUMBER
PROJECT TITLE
DESCRIPTION
FUNDING
REQUESTED
NOTES /COMMENTS
�1
cc
Kenai River Bluff Erosion /Stabilization
Approximately one -mile of the bluff along the Kenai River is
exhibiting substantial erosion. Several hundred feet of the
original townsite have been lost over the last century. The
U.S. Corp of Engineers estimates the rate of erosion to be 3
feet per year. Over the next 50 years, in excess of $ 50
million (in 2006 dollars) of property and improvements will be
lost, without the construction of stabilization improvements.
The total cost estimate for the project is $ 20 million.
Approximately $ 1.5 million has been spent to date on
preliminary engineering & studies. Kenai voters approved a $
2 million bond sale at the October 2007 election.
$ 18,000,000.00
The bluff erosion project has been the City of Kenai's
number one Federal and State funding priority for at least
the previous thrree years. Administration is requesting
funding from the Governor and area Legislators. To date,
funding of approximately $ 1.5 million has been
appropriated by Alaska's congressional delegation, but the
outlook for additional federal funding is not good. The
citizens of Kenai approved a G.O. bond proposition in the
amount of $ 2,000,000 in 2007. Given the State of Alaska's
present financial condition the opportunity to recieve
funding is as good as it has been in some years.
New Water Transmission Mains, New
Well House, New Well(s) & Replacemnt
of AC Transmission Main. ADEC
Municipal matching Grant Project
Project would construct approximately 10,500 If of new 16"
transmission main, replace approximately 3,200 If of aging
asbestos cement trasnmission main, decommission
municipal production wells # 1 & # 3 which have high arsenic
levels, construct a new well in the vicinity of well # 2 a new
wellhouse, controls, stand -by power generation, and other
related improvements. This with other previouskly recieved
grants and project funding will provide higher quality water
and increased volumes to meet present and future system
demands.
$ 2,070,000.00
We have applied to ADEC for this project and it appears we
have scored high enough for t to be a SFY 10 grant funded
State project under the municipal matching grant program.
We also have received a grant from the USEPA in the
amount of $ 288,000 that can be used as a portion of the
match for this project. The grant program requires a 30%
match from the city. By using the EPA funding as a part of
that match the City will need to provide $ 599,142.
3
Kenai Community Library Expansion
Project would expand the existing Kenai Community Library
by approximately 10,000 s.f., or roughly double the size of the
existing facility. Voters in Kenai approved a bond sale in the
amount of $ 2 million, for a project presently estimated at $
5.3 million
$ 1,000,000.00
To date the project has received or has commitments for
funding in the amount of $ 3,920,000. This includes $
2,000,000 for G.O. Bonds, $ 1,500,000 from the Rasmuson
Foundation, & $ 170,000 from the Friends of the Kenai
Community Library. Additional fundraising efforts are
ongoing.
Paving & Improvements to City Streets
The City of Kenai maintains approximately 20 miles of gravel
surfaced roadways within it's municipal boundaries. The cost
of maintenance of gravel roadways is high, dust from gravel
roadways is a health issue for the elderly & young. The $ 1
million requested will be used as a 50% match to support
local improvement districts
$ 1,000,000.00
Administration recommends that a project of this type be
perpetually included in capital project requests to the
Borough and State.
Page 1 of 4
Prepared by: R. Koch
CITY OF KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR STATE & FEDERAL FUNDING REQUESTS FOR
FY 2010
PRIORITY
NUMBER
PROJECT TITLE
DESCRIPTION
FUNDING
REQUESTED
NOTES /COMMENTS
Visitor Center Heating System
Replacement
P
The in -floor heating system is failing. The sytem loses
approximately 20 gallons of water per day. To replace the
PP Y 9 P Y� P
system a 2" layer of lightweight concrete floor would be
poured including new heat tubing. This is an extensive project
requiring demolition and replacement of existing flooring, and
adjustment to doors, trim, and piping systems
$ 250,000.00
The City has received $ 71,000 as a partial settlement for
the defective heat tubing used during initial construction.
9 9�
Additional settlement funds may be available.
291/,0
JJ /6
New Fire Engine
This new fire engine would replace an existing 26 year old fire
engine. Our 1982 fire engine is the oldest equipment
presently in use at the Fire Department, and was one of the
last years in which "open jump seat" fire engines were
allowed by code. The old engine has reached the end of it's
useful life and should be replaced.
$ 500,000.00
�2s�f`�
7
Capital Improvements to Support State
Personal Use Fishery
it14.4 /" °y
1"
This project would purchase Low Ground Pressure (LPG)
vehicles (2), portable solid waste receptacles (12), portable
fish waste receptacles (8) to facilitate the removal of what
has become large volumes of trash and fish waste left on the
beach. In addition this project would purchase and install the
following: . Boh permanent 1. Both permanent fencinc7 and reusable temporary fencing to
protect the Kenai River dunes from pedestrian and vehicular
traffic during the fishery.
2.Permanent and re- usable temporary signage.
3. Trash /Fish Waste Transfer Stations (2).
4. Upgrades to the Municipal Boat Launch Ramp to more
efficiently accomodate large volumes of boating traffic during
the fishery.
$ 400,000.00
8 -czt,-
Bridge Access Road, Pedestrian
Pathway
' a e'%?
f it a
This project would construct a pedestrian pathway from the
Kenai Spur Highway to Kalifornsky Beach Road along Bridge
Access Road. This area is heavily traveled by pedestrians,
sight seer's, bicyclists, etc. This project is approximately 2
miles long and would complete the 24 mile Unity Trail that
connects Kenai and Soldctna, along both the Spur Highway
and Kalifornsky Beach Road.
$ 2,000,000.00
.' A
knai Soccer Park Restroom &
Concession Facility
Project would provide for restrooms and concession facility at
new soccer fields. State Soccer Cup scheduled for 2009
$ 150,000.00
Administration encourages soccer association to seek
grant funding.
(li
New Soccer Fields Irrigation
Project would design and install irrigation system for four
soccer fields
$ 250,000.00
Page 2 of 4
Prepared by: R. Koch
CITY OF KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR STATE & FEDERAL FUNDING REQUESTS FOR
FY 2010
PRIORITY
NUMBER
PROJECT TITLE
DESCRIPTION
FUNDING
REQUESTED
NOTES /COMMENTS
'li,..
Energy Efficient Street Lighting
/d�
�eW Rz
Throughout the city there are intersections and other areas
such as school bus stops that do not have overhead street
lights. The city installs a number of lights each year.
However, there are always more needs than available
funding .
$ 100,000.00
Administration recommends that a project of this type be
perpetually included in capital project requests to the
Borough and State.
"`
Public Works Shop Building
Project would construct a new PW shop building
approximately 10,000 sf In size
$ 4,000,000.00
�p
.0
1
Re -Model of Public safety Emergency
Center
This project would re- configure the dispatch area including air
filtration systems, electrical systems, and underfloor wiring
trays. Additionally some new work stations and furniture
would be purchased.
$ 75,000.00
' /
/�
4
14
Silver Salmon Drive Paving (Pillars Boat
Launch Access Road)
Project would repair area of large frost heave, and construct
a paved roadway from the end of the existing pavement to
the ADNR parking lot/boat launch at the end of the road at
the Kenai River. Cost estimate is based on City
administration of project.
$ 500,000.00
The existing roadway is gravel and poorly maintained.
Maintenance is performed by ADNR (I believe on a contract
basis). The City recieves numerous complaints each year
from users of the road and from property owners in the
area as they believe it is a City responsibility. If the State
agrees to repair and upgrade the road to an asphalt
standard the City should consider assuming maintenence
responsibilities.
(v
'/ �g
Kenai Municipal Boat Launch,
Peplacement of Damaged Concrete
Planks
This project would design and install replacement concrete
planks on the boat launch ramp. The two older boat launch
ramps have planks at the lower elevation that have been
damaged by winter ice and by equipment during the annual
removal of silt.
$ 100,000.00
7/
d"
Maintenance Shop Site Remediation
ADEC Spill # 1994230110102
The city maintenance shop area has been identified by ADEC
as a contaminated site. Barrels of petroleum products and
oils were disposed of on this site and measurable levels of
pollutants have been identified in an adjacent waterbody. This
project would remove contaminated soils, buried containers
and barrels. A subsequent phase of this project would
remediate the contaminated soils, dispose of
containers /barrels, and install monitoring wells.
$ 250,000.00
Page 3 of 4
Prepared by: R. Koch
CITY OF KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR STATE & FEDERAL FUNDING REQUESTS FOR
FY 2010
PRIORITY
NUMBER
PROJECT TITLE
DESCRIPTION
FUNDING
REQUESTED
NOTES /COMMENTS
10
f
City Hall HVAC Improvements
The current system does not provide uniform heat in the
winter and does not include air conditioning (cooling) in the
summer. The present system also does not provide an
adequate number of air changes to meet current code
requirements. The copy room which contains the computer
servers is consistently at a significantly elevated temperature.
$ 150,000.00
Expansion of Animal Control Shelter
This project would design and construct an addition to the
Animal Control Shelter. The specific scope of work would
roughly double the existing kennel block.
$ 450,000.00
City of Kenai Campground for
TentNehicle
Project would construct a tent/vehicle campground located at
the Kenai Sports Complex( ?) located at Section 36
$ 200,000.00
Relocation of Sr. League /American
Legion Baseball Field
Project would include roads, parking, water /sewer and
construction of an adult baseball field
$ 750,000.00
N/A *I
Lower Kenai River Drift Boat Pull -Out
Project would provide lower river access point for pull -out of
drift boats only.
$ 500,000.00
N/A
Kenai Spur Highway - Upgrade Five
Intersections
JA 2
This project is proposed to provide safety improvements to
Beaver Loop, Thompson Park, Strawberry Road, Silver
Salmon, and TBD to include turn lanes and lighting. Traffic
accidents at these intersections usually involve at least one
vehicle traveling at a high rate of speed, and are of significant
severity.
$ 3,000,000.00
This project should rank high on the STIP and be funded by
the State and /or FHWA
N/A
Kenai Spur Highway - Upgrade to Five
Lane configuration Between Soldotna
and Kenai
I
Conflicting traffic patterns (through traffic vs
business /residential traffic) and increased traffic counts have
increased the number and severity of accidents between
Kenai & Soldotna. Planned commercial developments will
significantly increase traffic in the near future
$ 30,000,000.00
This project should rank high on the STIP and be funded by
the State and /or FHWA
wit0 fl u h lvr
Page 4 of 4
Prepared by: R. Koch
CITY OF KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR STATE & FEDERAL FUNDING REQUESTS FOR
FY 2010
PRIORITY
NUMBER
PROJECT TITLE
DESCRIPTION
FUNDING
REQUESTED
NOTES /COMMENTS
10
f
City Hall HVAC Improvements
The current system does not provide uniform heat in the
winter and does not include air conditioning (cooling) in the
summer. The present system also does not provide an
adequate number of air changes to meet current code
requirements. The copy room which contains the computer
servers is consistently at a significantly elevated temperature.
$ 150,000.00
Expansion of Animal Control Shelter
This project would design and construct an addition to the
Animal Control Shelter. The specific scope of work would
roughly double the existing kennel block.
$ 450,000.00
City of Kenai Campground for
TentNehicle
Project would construct a tent/vehicle campground located at
the Kenai Sports Complex( ?) located at Section 36
$ 200,000.00
Relocation of Sr. League /American
Legion Baseball Field
Project would include roads, parking, water /sewer and
construction of an adult baseball field
$ 750,000.00
N/A *I
Lower Kenai River Drift Boat Pull -Out
Project would provide lower river access point for pull -out of
drift boats only.
$ 500,000.00
N/A
Kenai Spur Highway - Upgrade Five
Intersections
JA 2
This project is proposed to provide safety improvements to
Beaver Loop, Thompson Park, Strawberry Road, Silver
Salmon, and TBD to include turn lanes and lighting. Traffic
accidents at these intersections usually involve at least one
vehicle traveling at a high rate of speed, and are of significant
severity.
$ 3,000,000.00
This project should rank high on the STIP and be funded by
the State and /or FHWA
N/A
Kenai Spur Highway - Upgrade to Five
Lane configuration Between Soldotna
and Kenai
I
Conflicting traffic patterns (through traffic vs
business /residential traffic) and increased traffic counts have
increased the number and severity of accidents between
Kenai & Soldotna. Planned commercial developments will
significantly increase traffic in the near future
$ 30,000,000.00
This project should rank high on the STIP and be funded by
the State and /or FHWA
wit0 fl u h lvr
Page 4 of 4
Prepared by: R. Koch
CITY OF KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR STATE & FEDERAL FUNDING REQUESTS FOR
FY 2010
PRIORITY
NUMBER
PROJECT TITLE
DESCRIPTION
FUNDING
REQUESTED
NOTES /COMMENTS
1
Kenai River Bluff Erosion /Stabilization
Approximately one -mile of the bluff along the Kenai River is
exhibiting substantial erosion. Several hundred feet of the
original townsite have been lost over the last century. The
U.S. Corp of Engineers estimates the rate of erosion to be 3
feet per year. Over the next 50 years, in excess of $ 50
million (in 2006 dollars) of property and improvements will be
lost, without the construction of stabilization improvements.
The total cost estimate for the project is $ 20 million.
Approximately $ 1.5 million has been spent to date on
preliminary engineering & studies. Kenai voters approved a $
2 million bond sale at the October 2007 election.
$ 18,000,000.00
The bluff erosion project has been the City of Kenai s
number one Federal and State funding priority for at least
the previous thrree years. Administration is requesting
funding from the Governor and area Legislators. To date,
funding of approximately $ 1.5 million has been
appropriated by Alaska's congressional delegation, but the
outlook for additional federal funding is not good. The
citizens of Kenai approved a G.O. bond proposition in the
amount of $ 2,000,000 in 2007. Given the State of Alaska's
present financial condition the opportunity to recieve
funding is as good as it has been in some years.
2
New Water Transmission Mains, New
Well House, New Well(s) & Replacemnt
of AC Transmission Main. ADEC
Municipal matching Grant Project
Project would construct approximately 10,500 If of new 16"
transmission main, replace approximately 3,200 If of aging
asbestos cement trannmission main, decommission
municipal production wells # 1 & # 3 which have high arsenic
levels, construct a new well in the vicinity of well # 2 a new
wellhouse, controls, stand -by power generation, and other
related improvements. This with other previouskly recieved
grants and project funding will provide higher quality water
and increased volumes to meet present and future system
demands.
$ 2,070,000.00
We have applied to ADEC for this project and it appears we
have scored high enough for t to be a SFY 10 grant funded
State project under the municipal matching grant program.
We also have received a grant from the USEPA in the
amount of $ 288,000 that can be used as a portion of the
match for this project. The grant program requires a 30%
match from the city. By using the EPA funding as a part of
that match the City will need to provide $ 599,142.
3
Kenai Community Library Expansion
Project would expand the existing Kenai Community Library
by approximately 10,000 s.f., or roughly double the size of the
existing facility. Voters in Kenai approved a bond sale in the
amount of $ 2 million, for a project presently estimated at $
5.3 million
$ 1,000,000.00
To date the project has received or has commitments for
funding in the amount of $ 3,920,000. This includes $
2,000,000 for G.O. Bonds, $ 1,500,000 from the Rasmuson
Foundation, & $ 170,000 from the Friends of the Kenai
Community Library. Additional fundraising efforts are
ongoing.
4
Paving & Improvements to City Streets
The City of Kenai maintains approximately 20 miles of gravel
surfaced roadways within it's municipal boundaries. The cost
of maintenance of gravel roadways is high, dust from gravel
roadways is a health issue for the elderly & young. The $ 1
rnillion requested will be used as a 50% match to support
local improvement districts
$ 1,000,000.00
Administration recommends that a project of this type be
perpetually included in capital project requests to the
Borough and State.
Page 1 of 4
Prepared by: R. Koch
CITY OF KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR STATE & FEDERAL FUNDING REQUESTS FOR
FY 2010
PRIORITY
NUMBER
PROJECT TITLE
DESCRIPTION
FUNDING
REQUESTED
NOTES /COMMENTS
5
Visitor Center Heating System
Replacement
The in -floor heating system is failing. The sytem loses
approximately 20 gallons of water per day. To replace the
system a 2" layer of lightweight concrete floor would be
poured including new heat tubing. This is an extensive project
requiring demolition and replacement of existing flooring, and
adjustment to doors, trim, and piping systems
$ 250,000.00
The City has received $ 71,000 as a partial settlement for
the defective heat tubing used during initial construction.
Additional settlement funds may be available.
6
New Fire Engine
This new fire engine would replace an existing 26 year old fire
engine. Our 1982 fire engine is the oldest equipment
presently in use at the Fire Department, and was one of the
last years in which "open jump seat" fire engines were
allowed by code. The old engine has reached the end of it's
useful life and should be replaced.
$ 500,000.00
7
Capital Improvements to Support State
Personal Use Fishery
This project would purchase Low Ground Pressure (LPG)
vehicles (2), portable solid waste receptacles (12), portable
fish waste receptacles (8) to facilitate the removal of what
has become large volumes of trash and fish waste left on the
beach. In addition this project would purchase and install the
following:
1. Both permanent fencing and reusable temporary fencing to
protect the Kenai River dunes from pedestrian and vehicular
traffic during the fishery.
2.Permanent and re- usable temporary signage.
3. Trash /Fish Waste Transfer Stations (2).
4. Upgrades to the Municipal Boat Launch Ramp to more
efficiently accomodate large volumes of boating traffic during
the fishery.
$ 400,000.00
8
Bridge Access Road, Pedestrian
Pathway
This project would construct a pedestrian pathway from the
Kenai Spur Highway to Kalifornsky Beach Road along Bridge
Access Road. This area is heavily traveled by pedestrians,
sight seer's, bicyclists, etc. This project is approximately 2
miles long and would complete the 24 mile Unity Trail that
connects Kenai and Soldotna, along both the Spur Highway
and Kalifornsky Beach Road.
$ 2,000,000.00
9
Kenai Soccer Park Restroom &
Concession Facility
Project would provide for restrooms and concession facility at
new soccer fields. State Soccer Cup scheduled for 2009
$ 150,000.00
Administration encourages soccer association to seek
grant funding.
10
New Soccer Fields Irrigation
Project would design and install irrigation system for four
soccer fields
$ 250,000.00
Page 2 of 4
Prepared by: R. Koch
CITY OF KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR STATE & FEDERAL FUNDING REQUESTS FOR
FY 2010
PRIORITY
NUMBER
PROJECT TITLE
DESCRIPTION
FUNDING
REQUESTED
NOTES /COMMENTS
11
Energy Efficient Street Lighting
Throughout the city there are intersections and other areas
such as school bus stops that do not have overhead street
lights. The city installs a number of lights each year.
However, there are always more needs than available
funding .
$ 100,000.00
Administration recommends that a project of this type be
perpetually included in capital project requests to the
Borough and State.
12
Public Works Shop Building
Project would construct a new PW shop building
approximately 10,000 sf in size
$ 4,000,000.00
13
Re -Model of Public safety Emergency
Communications Center
This project would re- configure the dispatch area including air
filtration systems, electrical systems, and underfloor wiring
trays. Additionally some new work stations and furniture
would be purchased.
$ 75,000.00
14
Silver Salmon Drive Paving (Pillars Boat
Launch Access Road)
Project would repair area of large frost heave, and construct
a paved roadway from the end of the existing pavement to
the ADNR parking lot/boat launch at the end of the road at
the Kenai River. Cost estimate is based on City
administration of project.
$ 500,000.00
The existing roadway is gravel and poorly maintained.
Maintenance is performed by ADNR (I believe on a contract
basis). The City recieves numerous complaints each year
from users of the road and from property owners in the
area as they believe it is a City responsibility. If the State
agrees to repair and upgrade the road to an asphalt
standard the City should consider assuming maintenence
esponsibilities.
15
Kenai Municipal Boat Launch,
Peplacement of Damaged Concrete
Planks
This project would design and install replacement concrete
planks on the boat launch ramp. The two older boat launch
ramps have planks at the lower elevation that have been
damaged by winter ice and by equipment during the annual
removal of silt.
$ 100,000.00
16
Maintenance Shop Site Remediation
ADEC Spill # 1994230110102
The city maintenance shop area has been identified by ADEC
as a contaminated site. Barrels of petroleum products and
oils were disposed of on this site and measurable levels of
pollutants have been identified in an adjacent waterbody. This
project would remove contaminated soils, buried containers
and barrels. A subsequent phase of this project would
remediate the contaminated soils, dispose of
containers /barrels, and install monitoring wells.
$ 250,000.00
Page 3 of 4
Prepared by: R. Koch
CITY OF KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR STATE & FEDERAL FUNDING REQUESTS FOR
FY 2010
PRIORITY
NUMBER
PROJECT TITLE
DESCRIPTION
FUNDING
REQUESTED
NOTES /COMMENTS
17
City Hall HVAC Improvements
The current system does not provide uniform heat in the
winter and does not include air conditioning (cooling) in the
summer. The present system also does not provide an
adequate number of air changes to meet current code
requirements. The copy room which contains the computer
servers is consistently at a significantly elevated temperature.
$ 150,000.00
18
Expansion of Animal Control Shelter
This project would design and construct an addition to the
Animal Control Shelter. The specific scope of work would
roughly double the existing kennel block.
Project would construct a tent/vehicle campground located at
the Kenai Sports Complex( ?) located at Section 36
$ 450,000.00
$ 200,000.00
19
City of Kenai Campground for
TentNehicle
20
Relocation of Sr. League /American
Legion Baseball Field
Project would include roads, parking, water /sewer and
construction of an adult baseball field
$ 750,000.00
N/A
Lower Kenai River Drift Boat Pull -Out
Project would provide lower river access point for pull -out of
drift boats only.
This project is proposed to provide safety improvements to
Beaver Loop, Thompson Park, Strawberry Road, Silver
Salmon, and TBD to include turn lanes and lighting. Traffic
accidents at these intersections usually involve at least one
vehicle traveling at a high rate of speed, and are of significant
severity.
$ 500,000.00
$ 3,000,000.00
This project should rank high on the STIP and be funded by
the State and /or FHWA
N/A
Kenai Spur Highway - Upgrade Five
Intersections
WA
Kenai Spur Highway - Upgrade to Five
Lane configuration Between Soldotna
and Kenai
Conflicting traffic patterns (through traffic vs
business /residential traffic) and increased traffic counts have
increased the number and severity of accidents between
Kenai & Soldotna. Planned commercial developments will
significantly increase traffic in the near future
$ 30,000,000.00
This project should rank high on the STIP and be funded by
the State and /or FHWA
Page 4 of 4
Prepared by: R. Koch