Loading...
HomeMy WebLinkAboutOrdinance No. 2307-2008Suggested by: Administration CITY OF KENAI ORDINANCE NO. 236°7-200$ AN ORDINANCE OF THE COUNCIL OF THE CITY OF KENAI, ALASKA, TRANSFERRING $71,731 IN THE GENERAL FUND AND INCREASING ESTIMATED REVENUES AND APPROPRIATIONS BY $71,731 IN THE VISITORS CENTER HEATING SYSTEM CAPITAL PROJECT FUND TO REPLACE THE VISITORS CENTER HEATING SYSTEM. WHEREAS, the heating system at the Visitors Center needs to be replaced; and, WHEREAS, the City of Kenai is part of a class action lawsuit that is expected to generate funds to pay for a large part of the cost of replacing the heating system; and, WHEREAS, the City of Kenai received approximately $71,731 thus far as partial settlement; and, WHEREAS, Ordinance No. 2270-2007 appropriated this money to the General Fund Buildings Department Repair and Maintenance account; and, WHEREAS, the project will not be completed this fiscal year, therefore a capital project fund should be created to account for the project; and, WHEREAS, funds are available for transfer in the General Fund Building Department Repair and Maintenance account. NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA that: Section 1: A budget transfer be made in the General Fund as follows: From: Building Department: repairs and maintenance To: Transfers to Capital Project Fund Section 2: Estimated revenues and appropriations be increased as follows: Visitors Center Heating System Capital Proiect Fund Increase Estimated Revenues: $71,731 $71,731 Transfers from General Fund $71,731 Ordinance No. 2307-2008 Page 2 of 2 Increase Appropriafions: Construction $71,731 PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, this 20th day of May, 2008. PAT PORTER, MAYOR ATTEST: Carol L. Freas, City Clerk Approved by Finance: (04/28/2007) h1 Introduced: May 7, 2008 Adopted: May 20, 2008 Effective: May 20, 2008 ~~iy~i{. ~~d tl~euyof KENA~A~KA "Vclla9e wit~r a Past, GL~ wit~t a Fr~tr~re" 210 Fidalgo Avenue, Kenai, Alaska 99611-7794 a~~.a~~ Telephone:907-283-7535/FAX:907-283-3014 ,'IIIi 1992 MEMO: TO: City Council FROM: Rick Koch DATE: May 1, 2007 SUBJECT: Kenai Visitor Center Mechanical Upgrades The purpose of this corzespondence is to provide support infornation for a purchase order in the amomlt of $ 36,590 for professional design services for the above referenced project. To date the City has received approximately $ 71,000 from the claims adnrinistrator from the class action settlement for the failure of Entrap II in slab tubing. We have submitted additional information to the claims administrator with the propose of elevating our claim to a different class within the settlement. If we are successfid in elevatnlg our claim to a different class (based on catastrophic or serious failure of the tubing) we may receive as much as $ 400,000 total, including the $ 71,000 we have already received. Ihave spoken with and conducted a site visit with RSA Engineering, Inc to discuss the scope of the project, and to request a proposal to aocompiish the design phase services. That proposal is attached. The preliminary scope includes the following: 1. Abandonment of the existing in-floor heatnlg system. 2. Installation of additional re-heat coils in the primary ventilation ducts to provide heating to the display areas of the building (during cold weather tins is being accomplished presently, to a lesser degree). 3. Installation of hydronic fintube/radiant panels in the offices, conference room and restrooms. 4. Installation of overhead hydronic unit heaters in the kitchen and storage rooms. 5. Replacement of the in slab heated sidewalk system. 6. Replacement of pnerunatie control system with electronic control system. 7. Replacement of boilers. 8. Replacement of all building carpet. 9. Re-paint all interior building spaces. Administration will coordinate scheduling with the Kenai Convention & Visitors Bureau, and include them in the plan review process. Thank yon for your attention in this matter, if you have any questions please contact me at your convenience. ~, a ') ~' .~ ~~~ Designing in Alaska for Over 20 Years ~n~Bneering~ InC. Mechanical&ElectrlcalEngineers April 24, 2008 The City of Kenai 210 Fidalgo Avenue Kenai, AK 99611-7794 ATTENTION: Rick R. Koch City Manager Dear Rick, REFERENCE: Kenai Visitor Center Mechanical Upgrades RSA Engineering is pleased to offer a fee proposal for architectural, civil, mechanical, and electrical engineering services for the referenced project. Our understanding of the scope of work required far this project is based upon the following assumptions: Architectural • Autocad floor plan drawing for existing building. • Architectural work in support of the heating upgrades. • Building wide painting. • Building wide carpet replacement. Civil: • Sidewalk, front entry stairs and Handicap access ramp, demolition and renovation as required for replacement of snowmelt tubing and to add additional snowmelt for approx 75 feet of additional snowmelt not currently equipped with snowmelt. Mechanical: • Five (5) reheat coils will be installed in the primary ventilation ducts to provide heating for the building. • Perimeter heating (fintube/radiant panels) will be added in the office, conference rooms and restrooms only. • Hydronic unit heaters will be added in the kitchen and storage rooms. • The existing infloor heating will be abandoned in place. Existing tubing will be cut and capped at the existing floor penetration locations. • Front entry snowmelt system will be replaced. Provide new snowmelt for approx 75' of sidewalk. Sidewalklstainvay and ramp will be demolished and restored as necessary to accommodate new tubing installation. ANCHORAGE wASILLA 2522 Arctic boulevard, Suite 200 Anchorage, AK 99503-2516 p907.276.0521 f 907.276.1751 '~~ 91 E. Swanson Avenue, Suite 101 Wasilla, AK 99654 p907.357.1521 f 907.357.1751 www.rsa-ak,com April 24, 2008 Page 2 • Pneumatic control system will be replaced with an electronic control system building wide. • Replace boilers, modify and upgrade piping as necessary. Electrical: • Electrical design services will include providing power for the new mechanical equipment. General: • A 65% and 95% submittal will be provided for review and comment by the City of Kenai. Following 95% review construction documents will be provided to the City of Kenai. • A 65% cost estimate will be provided by Estimations to allow the project scope to be adjusted as necessary to meet the project budget. • We will provide you with one full sized and one half sized set of drawings. Exclusions: • Hazardous material abatement design (Asbestos, lead, etc.) has not been included in our fee at this time. • Civil engineer site visits, geotechnical investigation or surveying have not been included in this fee. We have assumed that the existing substrate is in fair condition and the existing fill material below the slabs is adequate to support new concrete work. The Civil design will be based on elevations as stated on the 1991 as-buil± dra~r~ings. • Bid phase and construction administration services will be provided on a Time and Materials basis based on our current billing rates. • Permitting with the State Fire Marshall and associated plan review fees are not included. Schedule & Budget • We anticipate delivering the 65% submittal on June 13`". The city of Kenai will have one week for review. • 95% submittal would be delivered on the July 11`". The city of Kenai will again have one week for review. • Final drawings will be delivered on July 28th. " April 24, 2008 Page 3 RSA proposes the following lump sum fees for this project: Mechanical Electrical Architect Cost Estimate 65% Design $ 7,500 $ 3,360 $ 8,030 $ 2,610 95% Design $ 3,620 $ 1,680 $ 4,840 -- Construction $ 1,560 $ 1,100 $ 2,290 Documents GRAND TOTAL $ 36,590 Please review and advise if this proposal is acceptable by signing below and returning a copy to our office as our notice to proceed. We look forward to working with you on this project. Sincerely, G~ '~~' r.~ ---~. Mark R. Frischkorn, P.E. Vice President mrf/bpplhc 08-0357/P08-111 Accepted for City of Kenai