HomeMy WebLinkAboutOrdinance No. 2483-2010KE@8A ALASKA AN ORDINANCE OF THE COUNCIL OF THE CITY OF KENAI, ALASKA INCREASING ESTIMATED REVENUES AND APPROPRIATIONS BY $190,000 IN THE CONGREGATE HOUSING CAPITAL PROJECT FUND FOR REPAIR OF DAMAGE CAUSED BY THE FIRE SUPPRESSION SPRINKLER SYSTEM FAILURE. WHEREAS, the dry pipe fire suppression system at the Congregate Housing facility experienced a failure in December 2009, and WHEREAS, repairs to the facility are expected to total $190,000; and, WHEREAS, the City has received a notice of coverage from the installing contractor's insurance carrier; and, WHEREAS, the full cost of repairs is expected to be recovered through the installing contractor's insurance or the City's own insurance. NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA that estimated revenues and appropriations be increased as follows: Congregate Housing Capital Projects Fund Increase Estimated Revenues: Insurance Restitution Increase Appropriations: Construction PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, this 19th day of May, 2010. Carol L. Freas, City Clerk Approved by Finance: ORDINANCE NO. 2483 -2010 CITY OF KENAI Suggested by: Administration PAT PORTER, MAYOR New Text Underlined [DELETED TEXT BRACKETED] $190,000 $190,000 Introduced: May 5, 2010 Adopted: May 19, 2010 Effective: May 19, 2010 fhc ayof KENAI, ALASKA "V ffaye with a Past, Ct y with a Fture 210 Fidalgo Avenue, Kenai, Alaska 99611 -7794 !wm,,, Telephone: (907) 283 -7535, Ext. 236 FAX: (907) 283 -3014 tI0 MEMO ADUM TO: Rick Koch, City Manager FROM: Kevin Lyon, Capital Projects Manager DATE: April 27, 2010 SUBJECT: Ordinance No. 2483 2010 Rick, This Ordinance is to provide the funding to repair the insured water damage to the Vintage Pointe Senior housing. The damage was caused by a broken pipe fitting on December 21, 2009 in the dry sprinkler system. The leak occurred in the attic of the facility so damage occurred on three floors in both the hallways and apartments. A detailed damage assessment was completed on January 7, 2010. The project includes funds to develop bid documents so the construction may be competitively bid as required by the insurance company. Initial response charges have been included in the estimate. The full cost to complete the repair is expected to be recovered from insurance. 1997 Project Name: Vintage Point Sprinkler Damage Repair Funding: Insurance Claim Account Number: 2. Construction Construction Costs Construction Title 36 General Requirements Crawl Space Hall 1st Floor Hall 2nd Floor Hall 3rd Floor Apartment 102 Apartment 103 Apartment 104 Apartment 105 Apartment 203 Inspection Apartment 205 Apartment 206 Apartment 303 Apartment 304 Contingency 15% Total Construction Cost: 3. Other Project Costs A. Inspection Const. Management (CA by Engineer) B. Administration Contract Admin. Const. Mngt. C. Construction Permits Inspections: E. Administration Advertising, Printing Public Notices Total Other Costs: STATEMENT OF PROBABLE COST CITY OF KENAI CAPITAL PROJECTS Description: Repair Sprinkler Water Damage on three floors and crawl space including: 1st floor Hall, 2nd Floor Hall, 3rd Floor Hall, Apartment 102, Apartment 103, Apartment 104, Apartment 105, Apartment 205, Apartment 206, Apartment 303, and Apartment 304. Apartment 203 will be re- inspected but it appears that the Apartment was dried out w/o permanent damage A/E Firm: Klauder Company Project Manager: Kevin Lyon PROJECT COST ESTIMATE Status 1. Repair Costs Preliminary Damage Report Blazy Construction $1,500.00 Done Initial Response Mizera's Steam Way $6,833.00 Done Initial Response Solie Construction replace waterlogged insulation $415.72 Done City Hours Estimated $2,797.20 Develop Bid Documents for Repair 515,000.00 Estimated Total $26,545.92 $15,485.06 $1,044.00 $22,290.10 $22,309.65 $22,310.25 $6,678.50 $3,079.95 $7,476.15 $3,075.00 $243.00 $16,162.85 $2,909.12 $2,861.74 $1,999.63 $19,188.75 $127,925.00 $147,113.75 $2,640.33 $10,700.00 $0.00 $3,000.00 Date: 4/20/2010 $127,925.00 Estimate Blazy $16,340.33 Total Project Cost: $190,000.00