HomeMy WebLinkAboutResolution No. 2010-57the city of
KENGALASKA
CITY OF KENAI
RESOLUTION NO. 2010 -57
Suggested by: Administration
A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA, ADOPTING THE
CITY OF KENAI CAPITAL IMPROVEMENTS PLAN PRIORITY LIST FOR STATE AND
FEDERAL FUNDING REQUESTS FOR THE FISCAL YEAR 2012.
WHEREAS, the Capital Improvements Plan (CIP) is a guide for capital expenditures;
and,
WHEREAS, the City of Kenai CIP process has involved consideration of existing plans,
programmatic needs and public input; and,
WHEREAS, the CIP compliments the legislative priorities, City Budget and
Comprehensive Plan; and,
WHEREAS, the Kenai City Council held a public hearing on the Capital Improvements
Program adoption on October 6, 2010.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF KENAI,
ALASKA, the City of Kenai Capital Improvements Plan Priority List for State and
Federal Funding Requests for the Fiscal Year 2012, as provided in the attached
Exhibit A, is adopted.
PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, this sixth day of
October, 2010.
ATTEST:
Carol L. Freas, City Clerk
PAT PORTER, MAYOR
NOTES /COMMENTS
outlook for additional federal funding is not good. The
citizens of Kenai approved a G.O. bond proposition in the
amount of 2,000,000 in 2007. Given the State of Alaska's
present financial condition the opportunity to recieve
funding is as good as it has been in some years.
has scored well enough to probably be included in the
Governor's FY 2012 capital budget. The City Council
passed Resolution No. 2012 -46 identifying this project as
the number one ADEC MMG priority.
Administration recommends that a project of this type be
perpetually included in capital project requests to the State
of Alaska.
REQUIRED
FUNDING
E
2
o
4-
o
0
N
o
0
o 0
o
00000'000' L
DESCRIPTION
lost, without the construction of stabilization improvements.
The total cost estimate for the project is 20 million.
Approximately 1.5 million has been spent to date on
preliminary engineering studies. Kenai voters approved a
2 million bond sale at the October 2007 election. Recently the
Kenai Peninsula Borough Assembly passed a resolution to
provide the quarry rock for the project at no cost. The value
of the rock is estimated at 4.8 million. Total funding in -hand
and in -kind is approximately 10.2 million.
iauuic Ul U10 pi }1119 VVUUIU ,u a ww a w,aau v}l in, 101101
of the City of Kenai 's municipal water supply utility. 2.
Construction of 2,500 If of new water main along Swires
Road between the Kenai Spur Highway Lawton Drive. This
will provide a cross connec Lion between an existing water
transmission main and the new water transmission main
being constructed on Lawton Drive. These improvements will
increase system reliance, and increase both operating
'pressures and flow volumes.
The City of Kenai maintains approximately 20 miles of gravel
surfaced roadways within its municipal boundaries. The cost
of maintenance of gravel roadways is high, dust from gravel
roadways is a health issue for the elderly young.
PROJECT TITLE
Paving Improvements to City Streets
PRIORITY
NUMBER
N
M
cn
LLI
0
rt cc
cc
Cr
ex
0
!t
0
w
t-
H o
w CC
CC
co
en
cc
cNi
Prepared by: R. Koch
NOTES /COMMENTS
'Shop facilities to support operations and maintenance
activities are always difficult projects to move forward. The
present facility was never designed to facilitate the support
manitenance activities which are being accomplished.
There may be an opportunity for Federal participation,
specifically FAA funding in an amount comensurate with
Airport use of the facility.
This project could also be a candidate for the DOE
competitive grant program.
In a recent candidates forum Governor Parnell stated that
his administration is willing to invest State resources to
mitigate the imact of the personal use fishery on the City of
Kenai and the Kenai Peninsula.
REQUIRED
FUNDING
00'00o'o S
400,000.00
O
O
O
O
O
ci
o
300,000.00 I
DESCRIPTION
This project would construct a 20,000 sf maintenance shop
to replace the existing shop. The exsiting shop is a collection
of buildings and conex's that lacks the room to perform
maintenance on the City's equipment fleet, and also lacks
engineered ventilation systems as well as other
improvements found in designed facilities.
This project would construct a six -bay vehicle storage facility
at the City maintenance yard. At present the vehicles are
stored outside the center. During the winter this results in
vehicles running to maintain heat for trips for the senior
clients, and also results in increased mechanical difficulties.
The current system does not provide uniform heat in the
winter and does not include air conditioning (cooling) in the
summer. The present system also does not provide an
adequate number of air changes to meet current code
requirements. The copy room which contains the computer
servers is consistently at a significantly elevated temperature.
Improvements would include the removal /replacement of the
exterior building panels, replacement/addition of insulation in
the walls and roof, removal and replacement of the roof
mounted air handling system with a ground -level HVAC /air
handling system, and replacement of the existing roof.
This project would construct three Fish Cleaning/Waste
Transfer Enforcement/Data Collection Stations. The three
stations would be located at the North Beach, South Beach,
and City Boat Launch.
PROJECT TITLE
Construct New City Light/Heavy
Equipment Maintenance Shop
Vehicle Storage Facility for Kenai Senior
Center Vehicles
City Hall HVAC Energy Conservation
Improvements
Capital Improvements to Support State
Personal Use Fishery
PRIORITY
NUMBER
V
un
to
n
co
co
cc
ciac
a.
PO
ct
Zi CC
CC
0 01
o 2
cc
a.
icc
ict
cc
cn
cc
a 04
CC
LU
CI
oa
CC
NOTES /COMMENTS
This is the first phase of a three phase project to construct
improvements to the WWTP ans identified in the WWTP
Master Plan prepared by CH2MHill in 2003.
lam not aware of any sources of funding that are available
for this project, and several regulatory agencies (EPA,
USDF &W) have expressed significant opposition to the
project.
ONIUNfJ
O3NIf1O3li
500,000.00
00'000'008'1-
00'000'000'Z
DESCRIPTION
This project would replace the major components of the
heating ventilation system, replace wall coverings,
replace /increase insulation in exterior walls and ceiling,
replace the existing roof, and construct a new entrance.
This project would construct improvements to the City of
Kenai s WWTP which would increase volume, decrease
operating expenses and increase the quality of the effluent.
This project would construct a pedestrian pathway from the
Kenai Spur Highway to Kalifornsky Beach Road along Bridge
Access Road. This area is heavily traveled by pedestrians,
sight seer's, bicyclists, etc. This project is approximately 2
miles long and would complete the 24 mile Unity Trail that
connects Kenai and Soldotna, along both the Spur Highway
and Kalifornsky Beach Road.
PROJECT TITLE
City of Kenai Wastewater Treatment
Plant Upgrades Renovations
Bridge Access Road, Pedestrian
Pathway
PRIORITY
NUMBER
m
0)
0
W
F-
EE
EE"
0_
cri
2
s ai l CC
z
ui 0
cC
u. 0
O cn
us!
5 n
cc
a.
cc
cn
CC
15 04
LL
CC
Lll
UJ
U.
Lai
cc
Prepared by: R. Koch
Demand for garages at Vintage Pointe is questionable. The
Council on Aging discussed this issue at several meetings
and the Administration met with them and presented the
results of a resident poll. Following Administration's meeting
with the Council on Aging the Administration met with the
residents of Vintage Pointe and it appeared support for
paying $200 a month for a garage was even less than the
previous poll results.
Administration believes thios project would best be funded
from a State/Federal appropriation(s) such as priority #3,
above.
The cost estimate for specific components of this project is
included ijn the attached information. The most practical
project is probably to replace the lighting and asphalt (est.
cost $332,000). A storm water system is challenging as the
subdivision was not originally designed taking into account
surface/piped drainage. Curb gutter is very expensive
and it's installation would mandate the construction of a
storm water drainange system.
o
O
o
o
360,000.00
O
O
0
o
o
0
69
500,000.00
This project would construct a building five garages for rent
to residents of Vintage Pointe. Each garage would be 15'x20',
heated, with an electrically actuated O/H garage door and a
3'0" personnel door.
!This project would re- construct First Street from California
Avenue to Florida Avenue. This roadway exhibits differential
movement of the curb gutter and asphalt. Further the
asphalt has and is failing.
1. Replace the existing street lighting system 2. Replace the
existing asphalt surfaced roadways and install new base
material as needed 3. Install curb gutter and a piped storm
water collection system 4. Construct sidewalks
This new fire engine would replace an existing 26 year old fire
''.engine. Our 1982 fire engine is the oldest equipment
,presently in use at the Fire Department, and was one of the
last years in which "open jump seat" fire engines were
'allowed by code. The old engine has reached the end of it's
useful life and should be replaced.
Garages (5) for Vintage Pointe
Congregate Housing
Mommsen Subdivision, First Street Re-
Construction
Central Heights Roadways, Street
Lighting System
Reconstruction /Replacement
Construction of a Storm water System
New Fire Engine
Liu
0
a
fx
CC
u.
a
cc
0
0)
cn
cc
CC
LU
oti
LU
cn
CC
I—
w
cc Z
CC 14
E m
O 2
S
a z
OTHER PROJECTS WHICH WERE CONSIDERED
Prepared by: R. Koch
PROJECT TITLE
SCRIPTION
NOTES /COMMENTS
This project has been discussed by the parks Recreation
Commission and it is my understanding they wish to
continue discussion on the subject. This project is certainly
worthy of discussion but significant work needs to be
accomplished to determine its feasibility.
ADNR is accomplishing a "Needs Assessment Study"
scheduled to be finished in 2011. It's doubtful any funding
would be available for this project in advance of the
completion of the study, and that State /federal funding
would be appropriated to a Slate Agency that would be
responsible for the construction and operation of the facility.
This project has ranked high on the 2010 -2013 STIP and
funding isproposed in SFY 2011 for conceptual design, and
ROW acquisition.
This project has not ranked high on the 2010 -2013 STIP.
'•A predocessor project, the improvement of five
intersections of this roadway has ranked well on the STIP
and funding for conceptual study ROW acuisition is
proposed to begin in SFY 2011. The full five -lane project
'..wit not be considered for funding until the intersection
''..project is through design, or possibly during construction.
REQUIRED
FUNDING
00'000'000`S
250,000.00
Unknown
00'000`000'£
0
0
0
0
0
d
0
0
d
co
ve
250,000.00
DESCRIPTION
This project would construct a 100200' indoor turf field,
possibly as an addition to the existing Kenai Multi- Purpose
Facility. The facility would be used by area schools, pre-
schools, soccer and other organizations.
Project would construct a tent/vehicle campground located at
the Kenai Sports Complex( located at Section 36
Project would provide lower river access point for pull -out of
''.drift boats only.
This project is proposed to provide safety improvements to
Beaver Loop, Thompson Park, Strawberry Road, Silver
Salmon, and TBD to include turn lanes and lighting. Traffic
accidents at these intersections usually involve at least one
vehicle traveling at a high rate of speed, and are of significant
seventy.
Conflicting traffic patterns (through traffic vs
business /residential traffic) and increased traffic counts have
increased the number and severity of accidents between
Kenai Soldotna. Planned commercial developments wit
significantly increase traffic in the near future
Project would design and install irrigation system for four
soccer fields
PROJECT TITLE
City of Kenai Indoor Turf Field Facility
City of Kenai Campground for
Tent/Vehicle
Lower Kenai River Drift Boat Pull -Out
Kenai Spur Highway Upgrade Five
Intersections
Kenai Spur Highway Upgrade to Five
Lane configuration Between Soldotna
and Kenai
New Soccer Fields Irrigation
PRIORITY
NUMBER
w cc
D ui
Or 0
5 cc
cc z
O Er cal
cc z
LU CC
2 o w
U.I raj
CC c1 6
5 I
EC 0
CITY OF KENAI
Prepared by: R. Koch
the city of
KEHAI, ALASKA
MEMO:
TO: City Council
FROM: Rick Koch
DATE: September 30, 2010
SUBJECT: Resolution No. 2010 -57, State Federal Capital Funding Requests
for SFY12 FFY 13
The purpose of this correspondence is to recommend Council approval of the above referenced
resolution.
Council met in a work session on September 28, 2010 to review Administration's
recommendations and to establish a priority listing for State Federal capital funding request.
The attached list and supporting information reflect the direction of Council.
Thank you for your attention in this matter.
17 1411 ye mar a Past, Ci y with a Future /I
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794 i i
Telephone: 907- 283 -7535 FAX: 907 283 -3014 l l �.l
1992
the city e f'
KENA� SKA
Village with a Past, Gc with a Future'
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794
Telephone: 907 283 -7535 FAX: 907 283 -3014
Kenai River Bluff Erosion /Stabilization
The U.S. Army Corp of Engineers (COE) has determined that a project to halt the
ongoing erosion is feasible. To date the COE has accomplished design to an 80% level,
and over fifty percent of the required NEPA documentation has been accomplished.
This important project can only be undertaken with the assistance of the State and
Federal Governments. The congressional delegation has been able to appropriate
approximately 1.5 million over the preceding four years to forward the project through
project scoping, planning, preliminary design and NEPA documentation, and another $2
million is presently included in a Senate appropriations bill..
The latest project cost estimate accomplished by the U.S. Corp of Engineers for this
project is approximately 29 million.
A commitment to the project was made by the Kenai Peninsula Borough. The Borough
Assembly adopted a resolution (attached) to provide Armor Rock, B -Rock, and Filter
Rock for the project at no cost. The value of the Kenai Peninsula Borough commitment
is approximately
4,800,000.
The construction of this project will result in substantial investment and the creation of
new and expanded businesses located on the bluffs above the mouth of the Kenai
River.
'III'
1992
the ci of
KENAI, ALASKA
"Village with a Past, Ci y with a Future
210 Fidalgo Avenue, Kenai, Alaska 99611 7794 I
Telephone: 907 283 -7535 FAX: 907 283 -3014 1I �.i
New Water Transmission Mains (Phase 111)
This project will replace approximately 3,200 If of an asbestos cement piped water main, which
is presently the sole connection from our water production facilities. The piping is approximately
40 years old and failures have become more frequent. Any failure of this transmission main is
catastrophic to supplying water to the distribution grid.
This project will also construct approximately 2,500 If of new distribution grid to create a
connection with the transmission mains located in Lawton Drive and the Kenai Spur Highway.
1991
he cit of,
KENAI, ALASKA
N
"ViIlaye with a Past, Cc ty with a Future
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794
Telephone: 907 283 -7535 Fax: 907 283 -3014
www.ci.kenai.ak.us
The City of Kenai owns and maintains over 64 miles of municipal roadways. Over 15 miles of
these roadways are constructed only to improved gravel standards. Over the past three years
the City has undertaken projects to improve approximately three miles of gravel roadways to a
paved standard affecting over 300 properties. These projects include pavement, drainage,
safety, and signage improvements.
Paving Improvements to City Streets
Funding for these projects have been accomplished through local improvement districts (LID's),
where the City, using City /State funding has funded 100% of the up -front costs of the
improvements with assessments being levied upon properties in the LID for 50% of the project
costs, resulting in shared 50/50 projects.
The city desires to continue this program of LID improvements, the benefits include but are not
limited to:
1. Improving air quality
2. Improving the quality of storm water run -off
3. Decreasing maintenance costs
4. Improving safety
5. Increasing property values
6. Creation of local employment
Based on historical data, and contingent upon the condition of specific existing gravel roadways,
$1 million of funding will improve one mile to two miles of roadways to paved standards.
the cz'yof
KENA� SKA
"Vi//zye with a Past, Ci y with a Ft/duve
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794 a <I
Telephone: 907 283 -7535 FAX: 907 283 -3014 tl
Construct New City Light /Heavy Equipment
Maintenance Shop
The City of Kenai's Equipment Maintenance Shop provides services to the Public
Works, Streets, Parks Recreation, Fire, Police, and Senior Center Departments. It
maintains over 400 pieces of City equipment.
The existing shop is over 30 years old, undersized, and not conducive to an efficient
maintenance program. The size of the existing shop does not allow for the storage of
equipment which is being worked and waiting for parts, resulting in the equipment
being towed outside to make room for other maintenance work. Several pieces of
equipment are too large for the existing shop, which is really only several connected
large garages. When large equipment requires maintenance the work must be
conducted outside. There is not a comprehensive ventilation system, nor is there
separation between the welding area and the remainder of the shop. We use an
adequate system of individual ventilators, but it is not an effective system. The parts
room is a conex which has been connected to the shop. Bathroom /wash facilities are
minimal, and the shop does not have a shower, other than in an emergency station.
The cost estimate for a new shop is as follows:
Sitework 100,000
Building Construction 150'x100' 15,000 s.f. 2,250,000
Fixtures Equipment 500,000
Design, Administration Contingency 650 000
Total 3,500,000
1992
the city of
KENGALASKA
CITY OF KENAI
RESOLUTION NO. 2010 -57
Suggested by: Administration
A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA, ADOPTING THE
CITY OF KENAI CAPITAL IMPROVEMENTS PLAN PRIORITY LIST FOR STATE AND
FEDERAL FUNDING REQUESTS FOR THE FISCAL YEAR 2012.
WHEREAS, the Capital Improvements Plan (CIP) is a guide for capital expenditures;
and,
WHEREAS, the City of Kenai CIP process has involved consideration of existing plans,
programmatic needs and public input; and,
WHEREAS, the CIP compliments the legislative priorities, City Budget and
Comprehensive Plan; and,
WHEREAS, the Kenai City Council held a public hearing on the Capital Improvements
Program adoption on October 6, 2010.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF KENAI,
ALASKA, the City of Kenai Capital Improvements Plan Priority List for State and
Federal Funding Requests for the Fiscal Year 2012, as provided in the attached
Exhibit A, is adopted.
PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, this sixth day of
October, 2010.
ATTEST:
Carol L. Freas, City Clerk
PAT PORTER, MAYOR
NOTES /COMMENTS
outlook for additional federal funding is not good. The
citizens of Kenai approved a G.O. bond proposition in the
amount of 2,000,000 in 2007. Given the State of Alaska's
present financial condition the opportunity to recieve
funding is as good as it has been in some years.
has scored well enough to probably be included in the
Governor's FY 2012 capital budget. The City Council
passed Resolution No. 2012 -46 identifying this project as
the number one ADEC MMG priority.
Administration recommends that a project of this type be
perpetually included in capital project requests to the State
of Alaska.
REQUIRED
FUNDING
E
2
o
4-
o
0
N
o
0
o 0
o
00000'000' L
DESCRIPTION
lost, without the construction of stabilization improvements.
The total cost estimate for the project is 20 million.
Approximately 1.5 million has been spent to date on
preliminary engineering studies. Kenai voters approved a
2 million bond sale at the October 2007 election. Recently the
Kenai Peninsula Borough Assembly passed a resolution to
provide the quarry rock for the project at no cost. The value
of the rock is estimated at 4.8 million. Total funding in -hand
and in -kind is approximately 10.2 million.
iauuic Ul U10 pi }1119 VVUUIU ,u a ww a w,aau v}l in, 101101
of the City of Kenai 's municipal water supply utility. 2.
Construction of 2,500 If of new water main along Swires
Road between the Kenai Spur Highway Lawton Drive. This
will provide a cross connec Lion between an existing water
transmission main and the new water transmission main
being constructed on Lawton Drive. These improvements will
increase system reliance, and increase both operating
'pressures and flow volumes.
The City of Kenai maintains approximately 20 miles of gravel
surfaced roadways within its municipal boundaries. The cost
of maintenance of gravel roadways is high, dust from gravel
roadways is a health issue for the elderly young.
PROJECT TITLE
Paving Improvements to City Streets
PRIORITY
NUMBER
N
M
cn
LLI
0
rt cc
cc
Cr
ex
0
!t
0
w
t-
H o
w CC
CC
co
en
cc
cNi
Prepared by: R. Koch
NOTES /COMMENTS
'Shop facilities to support operations and maintenance
activities are always difficult projects to move forward. The
present facility was never designed to facilitate the support
manitenance activities which are being accomplished.
There may be an opportunity for Federal participation,
specifically FAA funding in an amount comensurate with
Airport use of the facility.
This project could also be a candidate for the DOE
competitive grant program.
In a recent candidates forum Governor Parnell stated that
his administration is willing to invest State resources to
mitigate the imact of the personal use fishery on the City of
Kenai and the Kenai Peninsula.
REQUIRED
FUNDING
00'00o'o S
400,000.00
O
O
O
O
O
ci
o
300,000.00 I
DESCRIPTION
This project would construct a 20,000 sf maintenance shop
to replace the existing shop. The exsiting shop is a collection
of buildings and conex's that lacks the room to perform
maintenance on the City's equipment fleet, and also lacks
engineered ventilation systems as well as other
improvements found in designed facilities.
This project would construct a six -bay vehicle storage facility
at the City maintenance yard. At present the vehicles are
stored outside the center. During the winter this results in
vehicles running to maintain heat for trips for the senior
clients, and also results in increased mechanical difficulties.
The current system does not provide uniform heat in the
winter and does not include air conditioning (cooling) in the
summer. The present system also does not provide an
adequate number of air changes to meet current code
requirements. The copy room which contains the computer
servers is consistently at a significantly elevated temperature.
Improvements would include the removal /replacement of the
exterior building panels, replacement/addition of insulation in
the walls and roof, removal and replacement of the roof
mounted air handling system with a ground -level HVAC /air
handling system, and replacement of the existing roof.
This project would construct three Fish Cleaning/Waste
Transfer Enforcement/Data Collection Stations. The three
stations would be located at the North Beach, South Beach,
and City Boat Launch.
PROJECT TITLE
Construct New City Light/Heavy
Equipment Maintenance Shop
Vehicle Storage Facility for Kenai Senior
Center Vehicles
City Hall HVAC Energy Conservation
Improvements
Capital Improvements to Support State
Personal Use Fishery
PRIORITY
NUMBER
V
un
to
n
co
co
cc
ciac
a.
PO
ct
Zi CC
CC
0 01
o 2
cc
a.
icc
ict
cc
cn
cc
a 04
CC
LU
CI
oa
CC
NOTES /COMMENTS
This is the first phase of a three phase project to construct
improvements to the WWTP ans identified in the WWTP
Master Plan prepared by CH2MHill in 2003.
lam not aware of any sources of funding that are available
for this project, and several regulatory agencies (EPA,
USDF &W) have expressed significant opposition to the
project.
ONIUNfJ
O3NIf1O3li
500,000.00
00'000'008'1-
00'000'000'Z
DESCRIPTION
This project would replace the major components of the
heating ventilation system, replace wall coverings,
replace /increase insulation in exterior walls and ceiling,
replace the existing roof, and construct a new entrance.
This project would construct improvements to the City of
Kenai s WWTP which would increase volume, decrease
operating expenses and increase the quality of the effluent.
This project would construct a pedestrian pathway from the
Kenai Spur Highway to Kalifornsky Beach Road along Bridge
Access Road. This area is heavily traveled by pedestrians,
sight seer's, bicyclists, etc. This project is approximately 2
miles long and would complete the 24 mile Unity Trail that
connects Kenai and Soldotna, along both the Spur Highway
and Kalifornsky Beach Road.
PROJECT TITLE
City of Kenai Wastewater Treatment
Plant Upgrades Renovations
Bridge Access Road, Pedestrian
Pathway
PRIORITY
NUMBER
m
0)
0
W
F-
EE
EE"
0_
cri
2
s ai l CC
z
ui 0
cC
u. 0
O cn
us!
5 n
cc
a.
cc
cn
CC
15 04
LL
CC
Lll
UJ
U.
Lai
cc
Prepared by: R. Koch
Demand for garages at Vintage Pointe is questionable. The
Council on Aging discussed this issue at several meetings
and the Administration met with them and presented the
results of a resident poll. Following Administration's meeting
with the Council on Aging the Administration met with the
residents of Vintage Pointe and it appeared support for
paying $200 a month for a garage was even less than the
previous poll results.
Administration believes thios project would best be funded
from a State/Federal appropriation(s) such as priority #3,
above.
The cost estimate for specific components of this project is
included ijn the attached information. The most practical
project is probably to replace the lighting and asphalt (est.
cost $332,000). A storm water system is challenging as the
subdivision was not originally designed taking into account
surface/piped drainage. Curb gutter is very expensive
and it's installation would mandate the construction of a
storm water drainange system.
o
O
o
o
360,000.00
O
O
0
o
o
0
69
500,000.00
This project would construct a building five garages for rent
to residents of Vintage Pointe. Each garage would be 15'x20',
heated, with an electrically actuated O/H garage door and a
3'0" personnel door.
!This project would re- construct First Street from California
Avenue to Florida Avenue. This roadway exhibits differential
movement of the curb gutter and asphalt. Further the
asphalt has and is failing.
1. Replace the existing street lighting system 2. Replace the
existing asphalt surfaced roadways and install new base
material as needed 3. Install curb gutter and a piped storm
water collection system 4. Construct sidewalks
This new fire engine would replace an existing 26 year old fire
''.engine. Our 1982 fire engine is the oldest equipment
,presently in use at the Fire Department, and was one of the
last years in which "open jump seat" fire engines were
'allowed by code. The old engine has reached the end of it's
useful life and should be replaced.
Garages (5) for Vintage Pointe
Congregate Housing
Mommsen Subdivision, First Street Re-
Construction
Central Heights Roadways, Street
Lighting System
Reconstruction /Replacement
Construction of a Storm water System
New Fire Engine
Liu
0
a
fx
CC
u.
a
cc
0
0)
cn
cc
CC
LU
oti
LU
cn
CC
I—
w
cc Z
CC 14
E m
O 2
S
a z
OTHER PROJECTS WHICH WERE CONSIDERED
Prepared by: R. Koch
PROJECT TITLE
SCRIPTION
NOTES /COMMENTS
This project has been discussed by the parks Recreation
Commission and it is my understanding they wish to
continue discussion on the subject. This project is certainly
worthy of discussion but significant work needs to be
accomplished to determine its feasibility.
ADNR is accomplishing a "Needs Assessment Study"
scheduled to be finished in 2011. It's doubtful any funding
would be available for this project in advance of the
completion of the study, and that State /federal funding
would be appropriated to a Slate Agency that would be
responsible for the construction and operation of the facility.
This project has ranked high on the 2010 -2013 STIP and
funding isproposed in SFY 2011 for conceptual design, and
ROW acquisition.
This project has not ranked high on the 2010 -2013 STIP.
'•A predocessor project, the improvement of five
intersections of this roadway has ranked well on the STIP
and funding for conceptual study ROW acuisition is
proposed to begin in SFY 2011. The full five -lane project
'..wit not be considered for funding until the intersection
''..project is through design, or possibly during construction.
REQUIRED
FUNDING
00'000'000`S
250,000.00
Unknown
00'000`000'£
0
0
0
0
0
d
0
0
d
co
ve
250,000.00
DESCRIPTION
This project would construct a 100200' indoor turf field,
possibly as an addition to the existing Kenai Multi- Purpose
Facility. The facility would be used by area schools, pre-
schools, soccer and other organizations.
Project would construct a tent/vehicle campground located at
the Kenai Sports Complex( located at Section 36
Project would provide lower river access point for pull -out of
''.drift boats only.
This project is proposed to provide safety improvements to
Beaver Loop, Thompson Park, Strawberry Road, Silver
Salmon, and TBD to include turn lanes and lighting. Traffic
accidents at these intersections usually involve at least one
vehicle traveling at a high rate of speed, and are of significant
seventy.
Conflicting traffic patterns (through traffic vs
business /residential traffic) and increased traffic counts have
increased the number and severity of accidents between
Kenai Soldotna. Planned commercial developments wit
significantly increase traffic in the near future
Project would design and install irrigation system for four
soccer fields
PROJECT TITLE
City of Kenai Indoor Turf Field Facility
City of Kenai Campground for
Tent/Vehicle
Lower Kenai River Drift Boat Pull -Out
Kenai Spur Highway Upgrade Five
Intersections
Kenai Spur Highway Upgrade to Five
Lane configuration Between Soldotna
and Kenai
New Soccer Fields Irrigation
PRIORITY
NUMBER
w cc
D ui
Or 0
5 cc
cc z
O Er cal
cc z
LU CC
2 o w
U.I raj
CC c1 6
5 I
EC 0
CITY OF KENAI
Prepared by: R. Koch
the city of
KEHAI, ALASKA
MEMO:
TO: City Council
FROM: Rick Koch
DATE: September 30, 2010
SUBJECT: Resolution No. 2010 -57, State Federal Capital Funding Requests
for SFY12 FFY 13
The purpose of this correspondence is to recommend Council approval of the above referenced
resolution.
Council met in a work session on September 28, 2010 to review Administration's
recommendations and to establish a priority listing for State Federal capital funding request.
The attached list and supporting information reflect the direction of Council.
Thank you for your attention in this matter.
17 1411 ye mar a Past, Ci y with a Future /I
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794 i i
Telephone: 907- 283 -7535 FAX: 907 283 -3014 l l �.l
1992
the city e f'
KENA� SKA
Village with a Past, Gc with a Future'
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794
Telephone: 907 283 -7535 FAX: 907 283 -3014
Kenai River Bluff Erosion /Stabilization
The U.S. Army Corp of Engineers (COE) has determined that a project to halt the
ongoing erosion is feasible. To date the COE has accomplished design to an 80% level,
and over fifty percent of the required NEPA documentation has been accomplished.
This important project can only be undertaken with the assistance of the State and
Federal Governments. The congressional delegation has been able to appropriate
approximately 1.5 million over the preceding four years to forward the project through
project scoping, planning, preliminary design and NEPA documentation, and another $2
million is presently included in a Senate appropriations bill..
The latest project cost estimate accomplished by the U.S. Corp of Engineers for this
project is approximately 29 million.
A commitment to the project was made by the Kenai Peninsula Borough. The Borough
Assembly adopted a resolution (attached) to provide Armor Rock, B -Rock, and Filter
Rock for the project at no cost. The value of the Kenai Peninsula Borough commitment
is approximately
4,800,000.
The construction of this project will result in substantial investment and the creation of
new and expanded businesses located on the bluffs above the mouth of the Kenai
River.
'III'
1992
the ci of
KENAI, ALASKA
"Village with a Past, Ci y with a Future
210 Fidalgo Avenue, Kenai, Alaska 99611 7794 I
Telephone: 907 283 -7535 FAX: 907 283 -3014 1I �.i
New Water Transmission Mains (Phase 111)
This project will replace approximately 3,200 If of an asbestos cement piped water main, which
is presently the sole connection from our water production facilities. The piping is approximately
40 years old and failures have become more frequent. Any failure of this transmission main is
catastrophic to supplying water to the distribution grid.
This project will also construct approximately 2,500 If of new distribution grid to create a
connection with the transmission mains located in Lawton Drive and the Kenai Spur Highway.
1991
the cz'yof
KENA� SKA
"Vi//zye with a Past, Ci y with a Ft/duve
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794 a <I
Telephone: 907 283 -7535 FAX: 907 283 -3014 tl
Construct New City Light /Heavy Equipment
Maintenance Shop
The City of Kenai's Equipment Maintenance Shop provides services to the Public
Works, Streets, Parks Recreation, Fire, Police, and Senior Center Departments. It
maintains over 400 pieces of City equipment.
The existing shop is over 30 years old, undersized, and not conducive to an efficient
maintenance program. The size of the existing shop does not allow for the storage of
equipment which is being worked and waiting for parts, resulting in the equipment
being towed outside to make room for other maintenance work. Several pieces of
equipment are too large for the existing shop, which is really only several connected
large garages. When large equipment requires maintenance the work must be
conducted outside. There is not a comprehensive ventilation system, nor is there
separation between the welding area and the remainder of the shop. We use an
adequate system of individual ventilators, but it is not an effective system. The parts
room is a conex which has been connected to the shop. Bathroom /wash facilities are
minimal, and the shop does not have a shower, other than in an emergency station.
The cost estimate for a new shop is as follows:
Sitework 100,000
Building Construction 150'x100' 15,000 s.f. 2,250,000
Fixtures Equipment 500,000
Design, Administration Contingency 650 000
Total 3,500,000
1992
14s
KENAI, ALASKA
V
Tillage with a Past, Gc with a Future'
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794
Telephone: 907 283 -7535 Fax: 907 283 -3014
www.ci.kenai.ak.us
Kenai Senior Center Vehicle Storage
The City of Kenai owns and operates a Senior Center which provides a wide range of senior
services including transportation and meal delivery. At present the Senior Center operates one
fifteen passenger bus, one ADA equipped van, two eight passenger transportation vans, and
two meal transport mini -vans. The amount of time it takes to adequately warm -up the vans
during the winter months impacts the time available for senior transportation (especially in the
larger vans) and meal delivery.
Maintenance and operations costs are also increased by the vehicles being stored outside. This
project would provide for the construction of an 8 bay facility to accommodate present and
future needs.
The cost estimate for the project is as follows:
Site Development 50,000
Utilities 25,000
Building (25'x100'= 2,500sf $100/sf) 250,000
Engineering Contingency 75 000
Total $400,000
14s
KENAI, ALASKA
V
Tillage with a Past, Gc with a Future'
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794
Telephone: 907 283 -7535 Fax: 907 283 -3014
www.ci.kenai.ak.us
Kenai Senior Center Vehicle Storage
The City of Kenai owns and operates a Senior Center which provides a wide range of senior
services including transportation and meal delivery. At present the Senior Center operates one
fifteen passenger bus, one ADA equipped van, two eight passenger transportation vans, and
two meal transport mini -vans. The amount of time it takes to adequately warm -up the vans
during the winter months impacts the time available for senior transportation (especially in the
larger vans) and meal delivery.
Maintenance and operations costs are also increased by the vehicles being stored outside. This
project would provide for the construction of an 8 bay facility to accommodate present and
future needs.
The cost estimate for the project is as follows:
Site Development 50,000
Utilities 25,000
Building (25'x100'= 2,500sf $100/sf) 250,000
Engineering Contingency 75 000
Total $400,000
the city of
KENGALASKA
CITY OF KENAI
RESOLUTION NO. 2010 -57
Suggested by: Administration
A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA, ADOPTING THE
CITY OF KENAI CAPITAL IMPROVEMENTS PLAN PRIORITY LIST FOR STATE AND
FEDERAL FUNDING REQUESTS FOR THE FISCAL YEAR 2012.
WHEREAS, the Capital Improvements Plan (CIP) is a guide for capital expenditures;
and,
WHEREAS, the City of Kenai CIP process has involved consideration of existing plans,
programmatic needs and public input; and,
WHEREAS, the CIP compliments the legislative priorities, City Budget and
Comprehensive Plan; and,
WHEREAS, the Kenai City Council held a public hearing on the Capital Improvements
Program adoption on October 6, 2010.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF KENAI,
ALASKA, the City of Kenai Capital Improvements Plan Priority List for State and
Federal Funding Requests for the Fiscal Year 2012, as provided in the attached
Exhibit A, is adopted.
PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, this sixth day of
October, 2010.
ATTEST:
Carol L. Freas, City Clerk
PAT PORTER, MAYOR
NOTES /COMMENTS
outlook for additional federal funding is not good. The
citizens of Kenai approved a G.O. bond proposition in the
amount of 2,000,000 in 2007. Given the State of Alaska's
present financial condition the opportunity to recieve
funding is as good as it has been in some years.
has scored well enough to probably be included in the
Governor's FY 2012 capital budget. The City Council
passed Resolution No. 2012 -46 identifying this project as
the number one ADEC MMG priority.
Administration recommends that a project of this type be
perpetually included in capital project requests to the State
of Alaska.
REQUIRED
FUNDING
E
2
o
4-
o
0
N
o
0
o 0
o
00000'000' L
DESCRIPTION
lost, without the construction of stabilization improvements.
The total cost estimate for the project is 20 million.
Approximately 1.5 million has been spent to date on
preliminary engineering studies. Kenai voters approved a
2 million bond sale at the October 2007 election. Recently the
Kenai Peninsula Borough Assembly passed a resolution to
provide the quarry rock for the project at no cost. The value
of the rock is estimated at 4.8 million. Total funding in -hand
and in -kind is approximately 10.2 million.
iauuic Ul U10 pi }1119 VVUUIU ,u a ww a w,aau v}l in, 101101
of the City of Kenai 's municipal water supply utility. 2.
Construction of 2,500 If of new water main along Swires
Road between the Kenai Spur Highway Lawton Drive. This
will provide a cross connec Lion between an existing water
transmission main and the new water transmission main
being constructed on Lawton Drive. These improvements will
increase system reliance, and increase both operating
'pressures and flow volumes.
The City of Kenai maintains approximately 20 miles of gravel
surfaced roadways within its municipal boundaries. The cost
of maintenance of gravel roadways is high, dust from gravel
roadways is a health issue for the elderly young.
PROJECT TITLE
Paving Improvements to City Streets
PRIORITY
NUMBER
N
M
cn
LLI
0
rt cc
cc
Cr
ex
0
!t
0
w
t-
H o
w CC
CC
co
en
cc
cNi
Prepared by: R. Koch
NOTES /COMMENTS
'Shop facilities to support operations and maintenance
activities are always difficult projects to move forward. The
present facility was never designed to facilitate the support
manitenance activities which are being accomplished.
There may be an opportunity for Federal participation,
specifically FAA funding in an amount comensurate with
Airport use of the facility.
This project could also be a candidate for the DOE
competitive grant program.
In a recent candidates forum Governor Parnell stated that
his administration is willing to invest State resources to
mitigate the imact of the personal use fishery on the City of
Kenai and the Kenai Peninsula.
REQUIRED
FUNDING
00'00o'o S
400,000.00
O
O
O
O
O
ci
o
300,000.00 I
DESCRIPTION
This project would construct a 20,000 sf maintenance shop
to replace the existing shop. The exsiting shop is a collection
of buildings and conex's that lacks the room to perform
maintenance on the City's equipment fleet, and also lacks
engineered ventilation systems as well as other
improvements found in designed facilities.
This project would construct a six -bay vehicle storage facility
at the City maintenance yard. At present the vehicles are
stored outside the center. During the winter this results in
vehicles running to maintain heat for trips for the senior
clients, and also results in increased mechanical difficulties.
The current system does not provide uniform heat in the
winter and does not include air conditioning (cooling) in the
summer. The present system also does not provide an
adequate number of air changes to meet current code
requirements. The copy room which contains the computer
servers is consistently at a significantly elevated temperature.
Improvements would include the removal /replacement of the
exterior building panels, replacement/addition of insulation in
the walls and roof, removal and replacement of the roof
mounted air handling system with a ground -level HVAC /air
handling system, and replacement of the existing roof.
This project would construct three Fish Cleaning/Waste
Transfer Enforcement/Data Collection Stations. The three
stations would be located at the North Beach, South Beach,
and City Boat Launch.
PROJECT TITLE
Construct New City Light/Heavy
Equipment Maintenance Shop
Vehicle Storage Facility for Kenai Senior
Center Vehicles
City Hall HVAC Energy Conservation
Improvements
Capital Improvements to Support State
Personal Use Fishery
PRIORITY
NUMBER
V
un
to
n
co
co
cc
ciac
a.
PO
ct
Zi CC
CC
0 01
o 2
cc
a.
icc
ict
cc
cn
cc
a 04
CC
LU
CI
oa
CC
NOTES /COMMENTS
This is the first phase of a three phase project to construct
improvements to the WWTP ans identified in the WWTP
Master Plan prepared by CH2MHill in 2003.
lam not aware of any sources of funding that are available
for this project, and several regulatory agencies (EPA,
USDF &W) have expressed significant opposition to the
project.
ONIUNfJ
O3NIf1O3li
500,000.00
00'000'008'1-
00'000'000'Z
DESCRIPTION
This project would replace the major components of the
heating ventilation system, replace wall coverings,
replace /increase insulation in exterior walls and ceiling,
replace the existing roof, and construct a new entrance.
This project would construct improvements to the City of
Kenai s WWTP which would increase volume, decrease
operating expenses and increase the quality of the effluent.
This project would construct a pedestrian pathway from the
Kenai Spur Highway to Kalifornsky Beach Road along Bridge
Access Road. This area is heavily traveled by pedestrians,
sight seer's, bicyclists, etc. This project is approximately 2
miles long and would complete the 24 mile Unity Trail that
connects Kenai and Soldotna, along both the Spur Highway
and Kalifornsky Beach Road.
PROJECT TITLE
City of Kenai Wastewater Treatment
Plant Upgrades Renovations
Bridge Access Road, Pedestrian
Pathway
PRIORITY
NUMBER
m
0)
0
W
F-
EE
EE"
0_
cri
2
s ai l CC
z
ui 0
cC
u. 0
O cn
us!
5 n
cc
a.
cc
cn
CC
15 04
LL
CC
Lll
UJ
U.
Lai
cc
Prepared by: R. Koch
Demand for garages at Vintage Pointe is questionable. The
Council on Aging discussed this issue at several meetings
and the Administration met with them and presented the
results of a resident poll. Following Administration's meeting
with the Council on Aging the Administration met with the
residents of Vintage Pointe and it appeared support for
paying $200 a month for a garage was even less than the
previous poll results.
Administration believes thios project would best be funded
from a State/Federal appropriation(s) such as priority #3,
above.
The cost estimate for specific components of this project is
included ijn the attached information. The most practical
project is probably to replace the lighting and asphalt (est.
cost $332,000). A storm water system is challenging as the
subdivision was not originally designed taking into account
surface/piped drainage. Curb gutter is very expensive
and it's installation would mandate the construction of a
storm water drainange system.
o
O
o
o
360,000.00
O
O
0
o
o
0
69
500,000.00
This project would construct a building five garages for rent
to residents of Vintage Pointe. Each garage would be 15'x20',
heated, with an electrically actuated O/H garage door and a
3'0" personnel door.
!This project would re- construct First Street from California
Avenue to Florida Avenue. This roadway exhibits differential
movement of the curb gutter and asphalt. Further the
asphalt has and is failing.
1. Replace the existing street lighting system 2. Replace the
existing asphalt surfaced roadways and install new base
material as needed 3. Install curb gutter and a piped storm
water collection system 4. Construct sidewalks
This new fire engine would replace an existing 26 year old fire
''.engine. Our 1982 fire engine is the oldest equipment
,presently in use at the Fire Department, and was one of the
last years in which "open jump seat" fire engines were
'allowed by code. The old engine has reached the end of it's
useful life and should be replaced.
Garages (5) for Vintage Pointe
Congregate Housing
Mommsen Subdivision, First Street Re-
Construction
Central Heights Roadways, Street
Lighting System
Reconstruction /Replacement
Construction of a Storm water System
New Fire Engine
Liu
0
a
fx
CC
u.
a
cc
0
0)
cn
cc
CC
LU
oti
LU
cn
CC
I—
w
cc Z
CC 14
E m
O 2
S
a z
OTHER PROJECTS WHICH WERE CONSIDERED
Prepared by: R. Koch
PROJECT TITLE
SCRIPTION
NOTES /COMMENTS
This project has been discussed by the parks Recreation
Commission and it is my understanding they wish to
continue discussion on the subject. This project is certainly
worthy of discussion but significant work needs to be
accomplished to determine its feasibility.
ADNR is accomplishing a "Needs Assessment Study"
scheduled to be finished in 2011. It's doubtful any funding
would be available for this project in advance of the
completion of the study, and that State /federal funding
would be appropriated to a Slate Agency that would be
responsible for the construction and operation of the facility.
This project has ranked high on the 2010 -2013 STIP and
funding isproposed in SFY 2011 for conceptual design, and
ROW acquisition.
This project has not ranked high on the 2010 -2013 STIP.
'•A predocessor project, the improvement of five
intersections of this roadway has ranked well on the STIP
and funding for conceptual study ROW acuisition is
proposed to begin in SFY 2011. The full five -lane project
'..wit not be considered for funding until the intersection
''..project is through design, or possibly during construction.
REQUIRED
FUNDING
00'000'000`S
250,000.00
Unknown
00'000`000'£
0
0
0
0
0
d
0
0
d
co
ve
250,000.00
DESCRIPTION
This project would construct a 100200' indoor turf field,
possibly as an addition to the existing Kenai Multi- Purpose
Facility. The facility would be used by area schools, pre-
schools, soccer and other organizations.
Project would construct a tent/vehicle campground located at
the Kenai Sports Complex( located at Section 36
Project would provide lower river access point for pull -out of
''.drift boats only.
This project is proposed to provide safety improvements to
Beaver Loop, Thompson Park, Strawberry Road, Silver
Salmon, and TBD to include turn lanes and lighting. Traffic
accidents at these intersections usually involve at least one
vehicle traveling at a high rate of speed, and are of significant
seventy.
Conflicting traffic patterns (through traffic vs
business /residential traffic) and increased traffic counts have
increased the number and severity of accidents between
Kenai Soldotna. Planned commercial developments wit
significantly increase traffic in the near future
Project would design and install irrigation system for four
soccer fields
PROJECT TITLE
City of Kenai Indoor Turf Field Facility
City of Kenai Campground for
Tent/Vehicle
Lower Kenai River Drift Boat Pull -Out
Kenai Spur Highway Upgrade Five
Intersections
Kenai Spur Highway Upgrade to Five
Lane configuration Between Soldotna
and Kenai
New Soccer Fields Irrigation
PRIORITY
NUMBER
w cc
D ui
Or 0
5 cc
cc z
O Er cal
cc z
LU CC
2 o w
U.I raj
CC c1 6
5 I
EC 0
CITY OF KENAI
Prepared by: R. Koch
the city of
KEHAI, ALASKA
MEMO:
TO: City Council
FROM: Rick Koch
DATE: September 30, 2010
SUBJECT: Resolution No. 2010 -57, State Federal Capital Funding Requests
for SFY12 FFY 13
The purpose of this correspondence is to recommend Council approval of the above referenced
resolution.
Council met in a work session on September 28, 2010 to review Administration's
recommendations and to establish a priority listing for State Federal capital funding request.
The attached list and supporting information reflect the direction of Council.
Thank you for your attention in this matter.
17 1411 ye mar a Past, Ci y with a Future /I
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794 i i
Telephone: 907- 283 -7535 FAX: 907 283 -3014 l l �.l
1992
the city e f'
KENA� SKA
Village with a Past, Gc with a Future'
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794
Telephone: 907 283 -7535 FAX: 907 283 -3014
Kenai River Bluff Erosion /Stabilization
The U.S. Army Corp of Engineers (COE) has determined that a project to halt the
ongoing erosion is feasible. To date the COE has accomplished design to an 80% level,
and over fifty percent of the required NEPA documentation has been accomplished.
This important project can only be undertaken with the assistance of the State and
Federal Governments. The congressional delegation has been able to appropriate
approximately 1.5 million over the preceding four years to forward the project through
project scoping, planning, preliminary design and NEPA documentation, and another $2
million is presently included in a Senate appropriations bill..
The latest project cost estimate accomplished by the U.S. Corp of Engineers for this
project is approximately 29 million.
A commitment to the project was made by the Kenai Peninsula Borough. The Borough
Assembly adopted a resolution (attached) to provide Armor Rock, B -Rock, and Filter
Rock for the project at no cost. The value of the Kenai Peninsula Borough commitment
is approximately
4,800,000.
The construction of this project will result in substantial investment and the creation of
new and expanded businesses located on the bluffs above the mouth of the Kenai
River.
'III'
1992
the ci of
KENAI, ALASKA
"Village with a Past, Ci y with a Future
210 Fidalgo Avenue, Kenai, Alaska 99611 7794 I
Telephone: 907 283 -7535 FAX: 907 283 -3014 1I �.i
New Water Transmission Mains (Phase 111)
This project will replace approximately 3,200 If of an asbestos cement piped water main, which
is presently the sole connection from our water production facilities. The piping is approximately
40 years old and failures have become more frequent. Any failure of this transmission main is
catastrophic to supplying water to the distribution grid.
This project will also construct approximately 2,500 If of new distribution grid to create a
connection with the transmission mains located in Lawton Drive and the Kenai Spur Highway.
1991
the cz'yof
KENA� SKA
"Vi//zye with a Past, Ci y with a Ft/duve
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794 a <I
Telephone: 907 283 -7535 FAX: 907 283 -3014 tl
Construct New City Light /Heavy Equipment
Maintenance Shop
The City of Kenai's Equipment Maintenance Shop provides services to the Public
Works, Streets, Parks Recreation, Fire, Police, and Senior Center Departments. It
maintains over 400 pieces of City equipment.
The existing shop is over 30 years old, undersized, and not conducive to an efficient
maintenance program. The size of the existing shop does not allow for the storage of
equipment which is being worked and waiting for parts, resulting in the equipment
being towed outside to make room for other maintenance work. Several pieces of
equipment are too large for the existing shop, which is really only several connected
large garages. When large equipment requires maintenance the work must be
conducted outside. There is not a comprehensive ventilation system, nor is there
separation between the welding area and the remainder of the shop. We use an
adequate system of individual ventilators, but it is not an effective system. The parts
room is a conex which has been connected to the shop. Bathroom /wash facilities are
minimal, and the shop does not have a shower, other than in an emergency station.
The cost estimate for a new shop is as follows:
Sitework 100,000
Building Construction 150'x100' 15,000 s.f. 2,250,000
Fixtures Equipment 500,000
Design, Administration Contingency 650 000
Total 3,500,000
1992
14s
KENAI, ALASKA
V
Tillage with a Past, Gc with a Future'
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794
Telephone: 907 283 -7535 Fax: 907 283 -3014
www.ci.kenai.ak.us
Kenai Senior Center Vehicle Storage
The City of Kenai owns and operates a Senior Center which provides a wide range of senior
services including transportation and meal delivery. At present the Senior Center operates one
fifteen passenger bus, one ADA equipped van, two eight passenger transportation vans, and
two meal transport mini -vans. The amount of time it takes to adequately warm -up the vans
during the winter months impacts the time available for senior transportation (especially in the
larger vans) and meal delivery.
Maintenance and operations costs are also increased by the vehicles being stored outside. This
project would provide for the construction of an 8 bay facility to accommodate present and
future needs.
The cost estimate for the project is as follows:
Site Development 50,000
Utilities 25,000
Building (25'x100'= 2,500sf $100/sf) 250,000
Engineering Contingency 75 000
Total $400,000
14s
KENAI, ALASKA
V
Tillage with a Past, Gc with a Future'
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794
Telephone: 907 283 -7535 Fax: 907 283 -3014
www.ci.kenai.ak.us
Kenai Senior Center Vehicle Storage
The City of Kenai owns and operates a Senior Center which provides a wide range of senior
services including transportation and meal delivery. At present the Senior Center operates one
fifteen passenger bus, one ADA equipped van, two eight passenger transportation vans, and
two meal transport mini -vans. The amount of time it takes to adequately warm -up the vans
during the winter months impacts the time available for senior transportation (especially in the
larger vans) and meal delivery.
Maintenance and operations costs are also increased by the vehicles being stored outside. This
project would provide for the construction of an 8 bay facility to accommodate present and
future needs.
The cost estimate for the project is as follows:
Site Development 50,000
Utilities 25,000
Building (25'x100'= 2,500sf $100/sf) 250,000
Engineering Contingency 75 000
Total $400,000
he eify o f
KENAI, ALASKA
"Village with a Past, Gc y with a Future
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794
Telephone: 907 283 -7535 Fax: 907 283 -3014
www.ci.kenai.ak.us
City Hall
Heating Ventilation Air Conditioning (HVAC) Energy
Conservation Improvements
The central administration building was constructed in 1980, when the cost of energy was a
substantially lower percentage of overall building operation costs than it is today. The City had
an energy audit of its buildings accomplished in 2007 which identified the City hall Building as
having significant energy costs.
A cost estimate for the replacement of the HVAC System and Energy Conservation
Improvements is as follows:
Demolition 40,000
Installation of new boilers (2 $20,000) 40,000
Installation of new control system 50,000
Installation of new ventilation /air conditioning system 70,000
Installation of new insulated ducting system 20,000
Repair /Re- installation of Roof 40,000
Siding removal, insulation siding replacement 90,000
Design Admin 50,000
Total $400,000
he eify o f
KENAI, ALASKA
"Village with a Past, Gc y with a Future
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794
Telephone: 907 283 -7535 Fax: 907 283 -3014
www.ci.kenai.ak.us
City Hall
Heating Ventilation Air Conditioning (HVAC) Energy
Conservation Improvements
The central administration building was constructed in 1980, when the cost of energy was a
substantially lower percentage of overall building operation costs than it is today. The City had
an energy audit of its buildings accomplished in 2007 which identified the City hall Building as
having significant energy costs.
A cost estimate for the replacement of the HVAC System and Energy Conservation
Improvements is as follows:
Demolition 40,000
Installation of new boilers (2 $20,000) 40,000
Installation of new control system 50,000
Installation of new ventilation /air conditioning system 70,000
Installation of new insulated ducting system 20,000
Repair /Re- installation of Roof 40,000
Siding removal, insulation siding replacement 90,000
Design Admin 50,000
Total $400,000
the ei o
KENAI, ALASKA
"VUfizye with a Past, Cc with a Future
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794
Telephone: 907 283 -7535 Fax: 907 283 -3014
www.ci.kenai.ak.us
State Personal Use Fishery, Capital Improvements
The State of Alaska Personal Use Fishery is both a positive and a negative for the City of Kenai.
We welcome our Alaskan neighbors to take part in this fishery, however the activity has grown
to such a level that the existing resources which the City provides are not adequate to respond
to the crowds.
There are a number of issues which need to be addressed, these include enforcement, data
collection, and State funding for capital projects to assist the City in providing a parking and
camping area for the up to 15,000 individuals which participate in the fishery on a daily basis.
Our residential subdivisions near the beach are being over -run with vehicles /campers as they
simply do not have alternative places to park. On one day during the last year's season an
estimated 15,000 people were participating in the fishery at the mouth of the Kenai River, and
10,000 participants is commonplace.
One specific issue is the amount of fish waste that is deposited on tidelands owned by the City.
When participants clean fish the fish waste is often thrown into the river /ocean where it ends up
being washed up to the tideline. The City attempts to remove the decomposing fish wastes each
evening by utilizing a tractor with a rake to transport fish wastes.
The City recommends that fish cleaning stations be constructed in three locations, (North
Beach, Boat Launch and South Beach) and that disposal of fish waste from the personal use
fishery into the Kenai River be prohibited by regulation.
Estimated costs for the construction of three fish cleaning stations, is as follows:
Water Systems $100,000
Site Preparation 30,000
Wastewater Disposal Systems 60,000
Cleaning Facilities Appurtenances 75,000
Design, Administration Contingency 35 000
Total $300,000
The fish cleaning stations could also be used as data collection, and enforcement stations for
ADF &G and AST Brownshirts.
the city of
KENAI, ALASKA
Estimated Costs are as follows:
"Village with a Past, City with a Future"
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794
Telephone: 907 283 -7535 Fax: 907 283 -3014
www.ci.kenai.ak.us
City of Kenai Recreation Center
Energy Conservation Upgrades
The City of Kenai Recreation Center was constructed in 1982 when the cost of energy was a
significantly less costly component of overall building operation. This project will replace the
existing heating system, replace lighting systems, replace building control systems, and
increase insulation in selected areas of the building.
Demolition 40,000
Roof Insulation EPDM 80,000
Replace Boilers (2) 50,000
Replace Control, Systems 75,000
Replace Exterior Windows Doors 25,000
Replace Lighting Fixtures Controls 40,000
Replace HVAC System 100,000
Design, Administration Contingency 90,000
Total $500,000
the cty
KENA ALASKA
"Village with a Past, Ci y with a Future"
210 FideIgo Avenue, Kenai, Alaska 99611 -7794 p,q
'1 11J.
Telephone: 907 283 -7535 FAX: 907 283 -3014
City of Kenai Wastewater Treatment Plant Upgrade
Renovations
The City of Kenai's Wastewater Treatment Plant (WWTP) was constructed in 1982. It was sized
to accommodate a population of 11,650 people and an average wastewater flow of 1.3 million
gallons per day (mgd). The present population of Kenai is approximately 8,000 and average
wastewater flow is 0.90 mgd, or 70% of the plant design capacity.
A Wastewater Facility Master Plan was completed in March 2004 by CH2MHill. The cost
estimate for recommended improvements totaled 5,198,000 (in 2004 dollars) and were
identified as being accomplished in four phases. Estimated costs have been increased by 32% to
account for construction inflation. These four phases were as follows:
Phase
1
2
3
4
Description
Activated Sludge System Improvements
Suction/Jetter (Vactor) Truck*
Pretreatment Process Improvements
Aerobic Digester Solids Handling Systems
*Phase 2 shows a -0- cost es
Kenai in 2008.
Cost Estimate
3,040,000
-0-
1,450,000
1,850,000
TOTAL 6,340,000
ate as this equipment was already purchased by the City of
This grant application encompasses improvements identified, in part, in Phase I of Capital
Improvements Summary in the Master Plan, the installation of a second sludge belt press, and a
1,000 s.f. addition to the WWTP Control Building.
Below I will discuss each of the Phases identified in the Capital Improvements Summary, the
second sludge belt press and how the City proposes to phase the WWTP Upgrades.
1992
City of Kenai Wastewater Treatment Plant Upgrades Phase I
Sludge Belt Press 485,804
The existing sludge belt press is 25 years old, and while not functionally obsolescent, it requires
major maintenance /upgrades in the near future to maintain system reliability and compatibility
with control systems.
The installation of a second sludge belt press will provide system redundancy and allow for the
existing sludge belt press to be taken out of service for an extended period (4 -6 months) while
major maintenance upgrades can be accomplished.
Activated Sludge System Improvements 880,000
1. Upgrade Fine Bubble Aeration 380,000
Upgrade Aerobic Digester Blower System 270,000
The blowers currently provide three to four times the necessary oxygen concentration to
the aeration basins and there is no way to efficiently control this with the existing
equipment. The installation of one small blower with a variable speed motor, the
installation of variable speed motors on the existing blowers, the installation of a new
control system, and replacing the coarse bubble diffusers with fine bubble diffusers will
result in improved treatment and a significant drop in power consumption.
2. Upgrade Waste Activated Sludge (WAS) System 200,000
Upgrade Return Activated Sludge (RAS) System 30,000
The activated sludge treatment process works hest when a steady low flow of sludge is
returned to the aeration basin (RAS). The pumps currently in use return too much sludge
in too short a time to the aeration basin resulting in system failures, increased
maintenance and increased energy consumption.
The WAS pumps currently in service are a progressive cavity type that requires frequent
service. Replacement with a simple centrifugal pump system would lower maintenance
costs and improve treatment efficiency by allowing a steady flow of sludge to the aerobic
digestion tank rather than large intermittent flows.
The upgrades to the RAS WAS Systems, and the upgrades to the aeration system will
significantly improve the performance of the WWTP in terms of decreasing the costs of
aeration, improving the settleability of the sludge, and minimizing /eliminating permit
non compliance incidents.
WWTP Control Building Expansion 1,000 s.f.) 301,950
The addition of a second sludge belt press will require the re- location of the WWTP laboratory.
There is not sufficient space anywhere within the existing building to accommodate laboratory
operations. The construction of a 1,000 s.f. addition to the WWTP Control Building will provide
the room necessary for a fully functioning laboratory sufficient to support the operations of the
WWTP.
FUTURE PHASES OF THE CITY OF KENAI WWTP UPGRADES NOT SUBMITTED
UNDER THIS ADEC MUNICIPALMATCHING GRANT APPLICATION AT THIS
TIME
City of Kenai Wastewater Treatment Plant Upgrades Phase II
Filament Control System Improvements 2,100,000
The City of Kenai's WWTP periodically encounters problems with a floating sludge blanket.
This is caused by the predominance of filamentous organisms in the activated sludge. The
aeration basins will be modified to a plug flow regime and provide an anoxic zone in the first
third of each aeration basin. This will improve activated sludge settling by minimizing
filamentous organisms in the activated sludge. As a result the City will no longer need to operate
both secondary clarifiers. This will reduce energy consumption and provide redundancy in the
system.
City of Kenai Wastewater Treatment Plant Upgrades Phase III
Pretreatment Process Improvements 1,455,000
1. New Pump House 435,000
The existing pump house is undersized and is nearing the end of its useful life. The
addition of sophisticated control systems and other improvements requires additional
space in order to maintain system integrity and reliability.
2. Influent Manhole Modifications 60,000
Grease accumulates in the existing influent manhole. At times this grease layer will be as
much as five -feet thick. Presently the vactor truck is used to remove grease from the
influent manhole and transport to the WWTP. This modification would provide a sytem
to pump the grease from the influent manhole to the aerobic digester for treatment.
3. Grit Removal Cyclone 120,000
This would provide for grit removal in the pretreatment process. The system currently
includes two rotary screens, a by -pass screen, and screenings conveyor. They are not used
because they are quickly overloaded by the material entering the plan during peak flows.
This improvement would allow provide for washing, and compacting the collected
screenings as is required.
4. Bar Screens /Grinder Station 840,000
There are several areas in the wastewater collection system in which pretreatment of
wastewater through screening and grinding would be beneficial. Wildwood Prison and
future services comprised of fish processing plants. This will require further engineering
review prior to a specific scope of work being identified.
City of Kenai Wastewater Treatment Plant Upgrades Phase IV
Aerobic Digester Solids Handling 1,840,000
These improvements include, mechanical improvements for the aerobic digester, an upgraded
solids handling system, and re- coating the aerobic digester. Obtaining a sufficiently high
concentration of solids is difficult. A higher concentration of solids will mean lower influent
flow and longer residence time within the digestion tank. Twelve to eighteen days residence is
typically required for adequate digestion of sludge when there is no primary settling in the
WWTP process. Presently there is only eight days digester residence time.
To increase the solids concentration entering the sludge digestion tank, a gravity belt thickener
will be installed. This will increase the capacity of the existing aerobic digestion tank to meet the
projected waste loads for at least the next twenty years, and minimize /eliminate permit non-
compliance incidents.
Re- coating of the 423,000 gallon aerobic digestion tank may move up to a higher priority based
on inspections that will be accomplished this year. The purpose of the tank is to hold waste
sludge, and through aeration inactivate any harmful microorganisms. The City of Kenai's
WWTP does not have a redundant component for this process. Since the tank's construction in
1982 it has not been re- coated. If this aerobic digester tank were out of service for any extended
period, the WWTP process would be severely impacted.
the cyof
KENAI, ALASKA
Village with a Past, et with a Future
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794
Telephone: 907 283 -7535 FAX: 907 283 -3014
Bridge Access Road Pedestrian Pathway
The Kenai Soldotna Unity Trail is designed to make an approximate 20 mile loop from Kenai to
Soldotna on the Kenai Spur Highway. Then through Soldotna along the Sterling Highway to
Kalifornsky Beach Road, then along Kalifornsky Beach Road to Bridge Access Road, then along
Bridge Access Road to its intersection with Kenai Spur Highway, the beginning of the trail.
The train is fully constructed with the exception of the approximately 3 mile long section along
Bridge Access Road.
The cost estimate to construct the pedestrian pathway is as follows:
Paved Pedestrian Pathway (8' wide) 16,000 Lf.
Design, Administration Contingency
$1,600,000
400 000
Total $2,000,000