HomeMy WebLinkAboutResolution No. 2006-66Suggested by: Council
CITY OF KENAI
RESOLUTION NO. 2006-66
A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA, DIRECTING THE
CONTINUATION OF THE PROJECT ENTITLED "ANGLER DRIVE ASSESSMENT
DISTRICT" AND DESIGNATING WHAf IMPROVEMENTS ARE TO BE INCLLDED IN
THIS PROJECI'.
WHEREAS, the Councll directs the City Administration to continue with this project;
and,
WHER~AS, the following is a list of major improvements that are scheduled to be
completed under this project:
l. Preparation of existuig surfaces;
2. Drainage improvements (as neededj;
3. Reconstruclion of ditches/replacement of culverts (as needed~;
4. Crushed aggregate base course and asphalt paving; and,
WHEREAS, the Council finds the improvements are necessary and of benefit to the
properties to be assessed; and,
WHEREAS, the local improvement district costs will be allocated on a methodology
recogniz.ing equally, the property's square footage, the property's Kenai Peninsula
borough assessed value, and the number of properties included in the Iocal
improvement district For puxposes of calculatin~ square footage, the un-subdivided
properties and Tract 3, Anglers Acres Subdivision, Lowe Addition, the properties' dcpth.
are limited to 150 feet; and,
WHEREAS, a petition was submitted to the city that was signed by the owners of fifty
percent (50%) or more of the properties which will be benefited by the proposed
improvements; and,
WHER~AS, an account will be kept of all costs of the improvements and that after all
costs are known, the City Manager shall prepare an assessment roll for the
improvements; and,
WHEREAS, all oI the above impirovements will be done in this area but only fifty
percent (50%J of the total completed improvements will be assessed to the benefited
property owners; and,
WHEREAS, this resolution will be mailed to each property owner adjacent to the
streets designated for improvements; and,
WHEREAS, the property owner's name and address used will be that which is on
record at tlie Kenai Peninsula Borough on this date, December 6, 2006.
RESOLUTION NO. 2006-66
PAGE 2
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF KENAI,
ALASKA, that the City will continue with the project entitled "Angler Drive Spec:ial
Assessment District" and the improvements listed above.
PASSED BY THE COUNCIL OF THE CITY OF F~NAI, ALASKA, t17is siYth day of
December, 2006.
~~~ ~~~
PAT PORTER, MAYOR
ATTEST:
~ F ~
___~~ f
Carol L. Freas, ity Clerk
clf
Approved by Finance:~
Page I of l~
Carol Freas
From: Paul Mansur [pmansur@gorge.net]
Sent: Monday, November 27, 2006 4:45 PM
To: Carol Freas
Cc: rick pert; Jeff Mansur; Dan Barrett; Bill Barrett; Alan Ryan
Subject: Angler Drive proposed paving
Carol,
We are opposed to the project plan as it exists. The proposed assessments of from $3500 to $5500 for our lot
are way too expensive. A~so, we believe the Borough should pay foc it ~ 00%; thaYs why we pay property taxes
and Borough taxes. I was a Forest Service Manager on several Districts where I was in charge of maintaining
hundreds of miles of Forest Service roads. We found when we paved existing gravel roads that had been in place
for a number of years and had a good base course that it could be done very inexpensively. The savings we
realized in reduced grading costs over a ten year span wouid almost pay for the paving job. We believe this
proposai is another case of over engineering a project. it wouid be great but iYs too expensive.
Although two years ago we expressed an interest in getting the road paved we had no idea it would be this costly.
We think you should go back to the drawing board with this project.
Thanks for giving us an opportunity to give you our feedback
Paul Mansur
Dan Barrett
11/27/2006
.~
~~' ,`
~_-,
L~ /
`~V ~~a~e wit~t a Past, Gc~ wit~r a Fr~ture"
210 Fidalgo Avenue, Kenai, Alaska 99611-7794 ~
Telephone: (907) 283-7535, Ext. 236 / FAX: (907) 283-3014 ~IIII~
1992
`` ~~e"~°f ~~ MEMORANDUM
KENA~ SKA
TO: Rick Koch, City Manager
FROM: Keith Kornelis, Public Works Manager C~
DATE: November 29, 2006
SUBJECT: Angler Drive ~ID - 2006
Attached is Wm. J. Nelson & Associates proposal for engineering services on
Angler Drive Paving LID - 2006. His not-to-exceed fee of $48,410 is under our
estimated buget. The funds are available in the City account FY06 StreeUSewer
Construction (753-450-8098).
A purchase order has been prepared for Council approval on December 6, 2006,
after the public hearing and approvai of Council resolution directing the City
administration to continue with this project.
Proposal to Provide Engineering Services
Angier Drive Paving LID 2006
CITY OF KENAI, ALASKA
r _ _._ __
~ , ._ , I
NOV 2 9 2006
,. ......_:
~_ .. ,
Submitted By:
Wm. J. Nelson & Associates
155 Bidarka Street
Kenai, Alaska 99611
November 29, 2006
t~~ ~ J, N~I~an ~ A~~ ~
CONSULTING ENGINEERS
155 BIDARKA STREET
(907) 2833583
November 29, 2006
Keith Kornelis, Public
City of Kenai
210 Fidalgo
Kenai, Alaska 99611
Works Manager
STRUCTURAL CIVIL ENVIRONMENTAI
KENAI, ALASKA 99611
FAX (907) 283-4514
Re: Angler Drive Paving LID 2006 -Design and Inspection Proposal
Dear Mr. Kornelis,
My proposal for the Angler Drive LID is attached.
I will be the Principal in charge of Yhis project. I will provide project review and design input.
Biake Larson, PE will be the design engineer. I propose to use Whitford Surveying to provide
the design survey. I assume that the road prism consists of all non frost susceptible soils and as a
result no geotechnical investigation is planned for this projecf. This project will include `strip
paving' only and no excavation of the road prism is planned.
All design work will be performed in my office, located at 155 Bidarka Street, Kenai. We will
begin surveying promptly upon receipt of NoYice To Proceed.
I currentty carry $1,000,000 professional liability insurance.
I propose to provide the design and construction inspection for this project for a Not-to Exceed
fee of $48,410. An estimated fee breakdown is attached for your review.
Sincerely,
~~i~~f/
~x%~%~/ l~u~~-°.-
Wm. J. Nelson, PE
CONTENTS
~ ~ PROJECT MANAGEMBNT
Narrative
SCOPE
WORK PLAN
QUALIFICATIONS
Specialized Experience Relevant to This Project
Partial Project List - Similar Projects
COST PROPOSAL
Project Budget for LID Paving Improvements
Fee Schedule for Additional Services
PROJECT MANAGEMENT
Wm. J. Nelson, PE will be the principal responsible for the completion of the design and
inspection services. Mr. Nelson will be the contact for the City a~~d will be in aYCendance at Che
public hearings, utility meetings, eta Mr. Nelson will also coordinate and supervise the work
of others on the projeet. Mr. Nelson will provide in-house design review and supervision of the
work as it progresses.
The field surveying will be provide by Whitford Surveying.
Blake Larson will be Yhe design engineer for the project.
SCOPE
The project Scope includes the provision of Engineering, Design Surveying, and
Construction InspecYion services for paving improvements to for the Angler Drive Paving
LID. These street are currently maintained by the City of Kenai and were builY Yo City
sfandards and it is assumed that the road prism consists of all non frost susceptible gravel and
sand. As a resulC, only minimal excavation in the road prism will be required for this paving
project. Excavation will be limited Yo shaping and grading the road surface in preparation for
paving. It is assumed that no profile changes, or subgrade excavation will be required except for
minor reshaping of the surface material as may be needed fo establish a road crown.
Existing drainage patterns will be maintained and drainage wi11 be directed Yo exisYing diCches
along the road. Existing driveway culverts and cross culverts will be left in place, unless they
are found to be ineffective, in which case they will be evaluated and replaced on a case by case
basis.
WORK PLAN
TASK 1: Field Survey
* Secure copy of plat to determine right of way for proposed improvements.
* Recover property comer monuments as required to establish survey confrol.
* Record road centerline profile, shoulders, ditchline, location of existing driveways,
intersections. Topo street and ditches.
* L,ocate power poles, telephone pedestals, signed only, underground utilities will not be
located.
TASK 2: Preliminary Design
* Prepare plan base maps 1" = 40', show right of way.
* Plot utility IocaYions per field survey.
* Show existing and proposed centerli»e profile.
* Design paving cross section utilizing Kenai Standard Improvement Drawings.
* Make driveway approach schedule.
* Design drainage improvements; ditching.
, * Determine final bid items, quantifies.
* Prepare details for special construction at driveways/intersections.
* Submit (1) copy of preliminary plans for review af 95% complete.
* AtYend one publie hearing regarding the project.
TASK 3: Final Design
* IncorporaYe CiYy review comments into plans.
* Prepare bid ready plans, specificaYions for final submittal.
TASK 4: Bidding
* Prepare quantity information for advertisement for bids.
* Conduct pre-bid conference.
* Prepare addenda as necessary.
* Tabulate bids, evaluate and make written recommendaYion
for award.
TASK 5: Construction Inspection
* Act as the CiYy's representaCive to monitor compliance with pians, specifications and
design intent.
* Conduct pre-construction meeting with contractor, review submissions regarding schedule,
subcontractors, bonding, insurance, issue NTP.
* Provide construction observation as required to assure compliance with contract plans
and specifications.
* Determine actual quantities of bid items installed as required for determining payment to
Contractor.
* Log daily acYivities, provide daily field report.
* Direct changes consistent with design but made necessary due to field conditions which
do not affect project schedule or budget.
* Prepare necessary change orders with justification, cost backup and classify as to
change in scope, changed conditions or error/omission by the consultant.
* Certify subsYantial completion and prepare punch lisC.
* CerYify final acceptance.
SPECIALIZED EXPERIENCE
All of these projects included design survey to locate existing structures and driveways in order
to adjust street grades to minimize impact on access to existing buildings highly developed
areas. Design also included field verification and plotting of locations of existing utilities and
design to minimize conflicta
City of Kenai-Basin View Subdivision
Street reconstruction, paving improvements
City of Kenai-Main Street/Mission Avenue 2000
Street reconstruction, paving and storm drain improvements
City of Soldotna 1995 Street Improvements
7500 lineal feet of municipal road improvements. Work included reconstruction of
gravel street, paving, storm drain, curb and gutters. Design included innovative storm
water outfall system.
City of Homer 1995 Accelerated Roads Project
3400 linea] feet of gravel road reconstruction and paving. Design included excavation of unsuitabte soils
within shuctural section and design of geogrid subgrade reinforcement.
City of Kenai-Setnet Drive/Setnet Court Paving
35001ineal feet of municipal street improvements. Project included excavation,
embankment required to widen existing road section, paving, ditch improvement, design
and ADEC approval of drainage infiltration structure.
City of Kenai-O1dCown Street Improvemeots
1800 lineal feet of municipal sCreet improvements. Project included excavation,
embankment required to widen existin~ road section, paving, curb and gutter,
sidewalks and intersection illumination.
~ii~~ .~~ ~~I~ ~ A~~~ ~
CONSULTING ENGINEERS
155 BIDARKA STREET
(907)283-3583
STRUCTURAL CIVIL ENVIRONMENTAL
KENAI, ALASKA 9961'1
FAX (907) 283-4514
Fee Scheduie
Engineering/inspection Personnel
Registered Civii/Structural Engin2er
Civil Engineer, PE
Staff Engineer, EIT
AutoCad Technician
Inspector
Clerical
Regular Time
135.00 per hr.
95.00 per hr
80.00 per hr
65.00 per hr
75.00 per hr
40.00 per hr
Direct Project Expenses
Third Party Charges
Invoice Cost Plus 10%
Vehicle .50 / mile
Angler Drive 4600 ft
Wm. J. Neison & Associates=Fee Pro osal Nov 29, 2006
Task Ptsncr5a~ PE ' ET't' '
C~dd
~ts etrn
Ex ~se :' Descri zan
Ratelhr
StrrsFe ; 5135 S95 $80 ~65 S75
$7,260
Design Survey 8 $5,900
1]~esi n : 0 8
~~ 0 0 0 $5,900
$1Rj4SQ
Project Admin 8
Utility Locates
Test Holes ~
Public Hearing 4
Base Maps 24
Tifle Sl~eet/Index/Control S 8
P1an and Profile (6 sheets) 6 48 48
Detuls/Typical Sec[ians 2 16 16
Speciflcations 16
Bid SchedulelCost Estimate 8
Pnnting/Binding $500 Pla~~s/Specs
16 100 0~~ 96 0 $500
Conetraction Adtqin/Ins ecCion ~, $18 866
Advertise For Sids N/A
Con[ractor's Questfons 8
Pr~Bid Meeting/Addenda 2
Bid Analysis/Recommendation 4
Cqmpac~ion testing $1,500 Subcon[ract
Conetruction Adnnn 8 2A Vehicle mileage
InspectiQn 160 Vehicle mileage~
Asbuilts ~ 8 C:on[r. Redlines
8 38 0 8 160 $1,500
Total Pee $40,270
~ Ex enses W/m~rku $8,140
TotaL• T~tal Fee +:~xpenses :~~~ ~.: ~48a41i)