Loading...
HomeMy WebLinkAboutResolution No. 2005-45Suggested by: Administration CITY OF KElqAI RESOLUTION NO. 2005-45 A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA TRANSFERRING $10,000 IN THE AIRPORT TERMINAL MODIFICATION CAPITAL PROJECT FUND FOR ENGINEERING SERVICES FOR EXPANDED ITINERANT AIRCRAFT PARKING AT THE AIRPORT. WHEREAS, expanded itinerant aircraft parking is needed in the summer and a snow storage area is needed in the winter and this project would address both of these issues; and, WHEREAS, Wince-Corthell- Bryson Consulting Engineers will provide design and construction engineering; and, WHEREAS, funds are available for transfer in the Construction Account. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, that the following budget transfers be made: Airport Terminal Modification Capital Proiect Fund From: Construction $10,000 To' Engineering $10,000 PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, this Seventh day of September, 2005. PAT PORTER, MAYOR ATTEST: Carol L. Freas, City Clerk Approved by Finance' (9 / 01 / 2005) hl WINCE-CORTHELL-BRYSON CONSULTING ENGINEERS P.O. BOX 1041, KENAI, ALASKA 99611 (907) 283-4672 Fax (907) 283-4676 Email: pbryson~wcbalaska.com September 1, 2005 Job 03-031 __. .... RECEiVE.D- .... _ ~ ,, , , _~, _ , ~ City of Kenai SEp 1~ 210 Fidalgo Street, Suite 200 , Kenai, Alaska 99611 L '~n-v 0[ K{~n~l PUBLI,C, WORKS ,OE,PAFITMEN1 . Subject: Proposal for Engineering Services, Kenai Municipal Airport Terminal Modifications - 2004 Tract A, G.A.A. #2 Attention: Jack LaShot, City Engineer In response to a request by Airport Manager Becky Cronkhite for an engineering proposal for the subject project, we herewith submit this document for your consideration. It is our understanding that the City of Kenai wishes to prepare Plans and Specifications for construction within the westerly portion of Tract A, G.A.A. #2. This project is proposed to be constructed as part of the Kenai Municipal Airport Terminal Modification- 2004, presently under way. The intent of the project is to provide for expanded itinerant aircraft parking in summer and snow storage in winter. Design activities include preparation of documents that incorporate selected storm drain and electrical modifications from prior plans, determination of construction quantities for excavation and fill, removal of unsuitable materials, and surfacing with pit mn gravel. Negotiations with the present Contractor will provide the basis for incorporation of this work as a Change Order into the ongoing project. Construction Scope: Construction activities are proposed to consist of excavating and disposing of all silt soils within 10 feet of the existing fence line on the secure side of the Airport fence. This area is designated Tracts A-2 and A-3 on the preliminary plat (unapproved) titled General Aviation Apron No. 4, and contains approximately 3.2 acres. Storm drain construction and minor electrical modifications will be incorporated. Placement of gravel surfacing will be performed over selected areas of the subject area.