HomeMy WebLinkAboutResolution No. 2005-45Suggested by: Administration
CITY OF KElqAI
RESOLUTION NO. 2005-45
A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA
TRANSFERRING $10,000 IN THE AIRPORT TERMINAL MODIFICATION
CAPITAL PROJECT FUND FOR ENGINEERING SERVICES FOR EXPANDED
ITINERANT AIRCRAFT PARKING AT THE AIRPORT.
WHEREAS, expanded itinerant aircraft parking is needed in the summer and a
snow storage area is needed in the winter and this project would address both
of these issues; and,
WHEREAS, Wince-Corthell- Bryson Consulting Engineers will provide design
and construction engineering; and,
WHEREAS, funds are available for transfer in the Construction Account.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
KENAI, ALASKA, that the following budget transfers be made:
Airport Terminal Modification Capital Proiect Fund
From: Construction
$10,000
To' Engineering $10,000
PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, this Seventh day
of September, 2005.
PAT PORTER, MAYOR
ATTEST:
Carol L. Freas, City Clerk
Approved by Finance'
(9 / 01 / 2005) hl
WINCE-CORTHELL-BRYSON
CONSULTING ENGINEERS
P.O. BOX 1041, KENAI, ALASKA 99611
(907) 283-4672 Fax (907) 283-4676
Email: pbryson~wcbalaska.com
September 1, 2005
Job 03-031
__. .... RECEiVE.D-
.... _ ~ ,, , , _~, _ , ~
City of Kenai SEp 1~
210 Fidalgo Street, Suite 200 ,
Kenai, Alaska 99611 L '~n-v 0[ K{~n~l
PUBLI,C, WORKS ,OE,PAFITMEN1 .
Subject: Proposal for Engineering Services, Kenai Municipal Airport Terminal Modifications -
2004
Tract A, G.A.A. #2
Attention:
Jack LaShot, City Engineer
In response to a request by Airport Manager Becky Cronkhite for an engineering proposal for the
subject project, we herewith submit this document for your consideration.
It is our understanding that the City of Kenai wishes to prepare Plans and Specifications for
construction within the westerly portion of Tract A, G.A.A. #2. This project is proposed to be
constructed as part of the Kenai Municipal Airport Terminal Modification- 2004, presently
under way.
The intent of the project is to provide for expanded itinerant aircraft parking in summer and snow
storage in winter.
Design activities include preparation of documents that incorporate selected storm drain and
electrical modifications from prior plans, determination of construction quantities for excavation
and fill, removal of unsuitable materials, and surfacing with pit mn gravel.
Negotiations with the present Contractor will provide the basis for incorporation of this work as
a Change Order into the ongoing project.
Construction Scope:
Construction activities are proposed to consist of excavating and disposing of all silt soils within
10 feet of the existing fence line on the secure side of the Airport fence. This area is designated
Tracts A-2 and A-3 on the preliminary plat (unapproved) titled General Aviation Apron No. 4,
and contains approximately 3.2 acres.
Storm drain construction and minor electrical modifications will be incorporated.
Placement of gravel surfacing will be performed over selected areas of the subject area.