CITY OF KENAI
RESOLUTION NO. 2012 -10
A RESOLUTION OF THE COUNCIL OF' THE CITY OF KENAI, ALASKA, AWARDING A
CONTRACT TO AMERICAN MARINE CORPORATION FOR THE PROJECT ENTITLED
KENAI BOATING FACILITY CATHODIC PROTECTION AND PILE REPAIRS 2012 FOR
THE TOTAL AMOUNT OF $64,851.52.
ng bids were received on February 7, 2012:
BIDDER
Item 1
Item 2
Item 3
Total Bid
Peninsula Construction, Inc
$77,500
$7,000
$11,250
$95,750
Endries Company
$74,250
$7,760
$11,640
$93,650
American Marine Corporation
$39,644.02
$10,083
$15,124.50
$64,851.52
Cornerstone Equipment Rentals
$58,340
57,800
$11,700
$77,840
and,
WHEREAS, American Marine Corporation's bid is the lowest responsible bid and
award to this bidder would be in the best interest of the City; and,
WHEREAS, the recommendation from the City Administration is to award the contract
to American Marine Corporation for the total cost of $64,851.52; and,
WHEREAS, sufficient monies are appropriated.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF KENAI,
ALASKA, the contract for the project entitled Kenai Boating Facility Cathodic
Protection and Pile Repairs 2012 is awarded to American Marine Corporation for the
total amount of $64,851.52.
PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, this 15th day of
February, 2012.
ATT,E$T:
�I
S*dra; iidigh;City Clerk
Approved by Finance:
PAT PORTER, MAYOR
the c/ /yaf
KENAI, ALASKA
FROM:
DATE:
SUBJECT:
"Village with a Past, Gc with a Future ft
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794
Telephone: (907) 283 -7535, Ext. 236 / FAX: (907) 283 -3014 �Illll
MEMO'_ NDUM
Rick Koch, City Manager
Sean Wedemeyer, Public Works Director
February 8, 2012
AWARD OF CONTRACT; Kenai Boating Facility Cathodic Dock
Protection and Pile Repairs
1992
Rick,
This project entails aligning the pile cap and batter pile with the damaged shear
pipe. The concrete filled section of the pipe will be cut and removed. The pipe will
be replaced with a new hot dipped galvanized 24 inch diameter 1/2 inch wall. The
pipe will be filled with concrete after installation. Anodes will be installed on the
piles to provide cathodic protection.
On February 7, 2012 at 2:OOpm we received 4 bids for the above project. These
bids have been reviewed and it was determined that American Marine
Corporation was the lowest responsive bidder. The bid documents were
complete and responsive and sufficient funds will be available to complete the
project.
The attached Resolution 2012 -10 is recommending award of the contract to
American Marine Corporation for the total bid cost of $64,851.52. This project is
funded by the general dock repair and maintenance account. The total available
funding is $85,000.