HomeMy WebLinkAboutResolution No. 2012-19the nYy of RENAL ALASKA Suggested by: Administration CITY OF KENAI RESOLUTION NO. 2012 -19 A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA, AWARDING A CONTRACT TO DBR CONSTRUCTION, INC FOR THE PROJECT ENTITLED KENAI VINTAGE POINTE SPRINKLER DAMAGE REPAIR 2012 FOR THE TOTAL AMOUNT OF $30,993.00 WHICH INCLUDES BASE BID AND ADDITIVE ALTERNATE 1. WHEREAS, the following bids were received on March 14, 2012: BIDDER BASE BID ADD ALT 1 ADD ALT 2 Dan Sterchi Construction 41,813 4,200 3,800 Holden Company 33,322 4,644 3,798 DBR Construction, Inc. 28,068 2,925 2,725 ; and, WHEREAS, DBR Construction, Inc.'s bid is the lowest responsible bid and award to this bidder would be in the best interest of the City; and, WHEREAS, the recommendation from the City Administration is to award the contract to DBR Construction, Inc. for the total cost of $30,993; and, WHEREAS, sufficient monies are appropriated. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, the contract for the project entitled Kenai Vintage Pointe Sprinkler Damage Repair 2012 is awarded to DBR Construction, Inc. for the total amount of $30,993. PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, this 21st day of March, 2012. A 11ES'] t ,, Sandra Mgdigh, City ulerkr Approved'by Finance: Contingent upon passage of Ordinance 2615 -2012 PAT PORTER, MAYOR the atof KEN \ALASKA "Villag e with a Past, Gi witai a Future" 210 Fidalgo Avenue, Kenai, Alaska 99611 -7794 Il w Telephone: (907) 283 -7535, Ext. 236 / FAX: (907) 283 -3014 tl II MEMO '' S NDUM TO: Rick Koch, City Manager FROM: Sean Wedemeyer, Public Works Director DATE: March 14, 2012 SUBJECT: AWARD OF CONTRACT for Vintage Pointe Sprinkler Damage Repair 1992 Rick, During the severe storm on November 16, 2011 a sprinkler head at Vintage Point froze and broke thereby flooding the Vestibule, Lobby and Lounge, This contract is for the repair of the resulting damage. On March 14, 2012 at 2:OOpm we received three bids for the above project. These bids have been reviewed and it was determined that DBR Construction, Inc. was the lowest responsive bidder. The bid documents were complete and responsive and sufficient funds will be available to award the base bid and additive alternate 1. Base Bid - remove and replace or repair damaged construction. The Base Bid does not include repair of sprinkler system covered by the Additive Alternate. Additive Alternate 1 — reroute sprinkler system to connect a replacement sprinkler head in the Vestibule to the existing dry sprinkler system. Additive Alternate 2 - (Not awarded) repair sprinkler system to pre -event conditions by connecting replacement sprinkler head in arctic entry and connect to wet system. The attached Resolution 2012 -19 is recommending award of the contract to DBR Construction, Inc for the total bid cost of $30,993.