Loading...
HomeMy WebLinkAboutResolution No. 2012-53e Suggested by: Administration CITY OF KENAI KENAI, AIA SKA RESOLUTION NO. 2012 -53 A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA, AWARDING A CONTRACT FOR THE ERECTION OF A 55' X 120' SOFT -SIDED ENCLOSURE TO ALASKA DREAMS, INC. FOR THE TOTAL PRICE OF $39,850. WHEREAS, with the closure of the British Petroleum (BP) Gas to Liquids Plant, BP has donated a 55'X 120' soft -sided tent enclosure to the City; and, WHEREAS, the City requested quotes to erect the tent prior to snow fall; and, WHEREAS, Alaska Dreams, Inc. quote of $39,850 has been selected despite being $1,000 higher than the other quote received; and, WHEREAS, Alaska Dreams, Inc. sold this structure to BP and continues to be the Alaska retailer for the tent; and, WHEREAS, as the Alaska retailer for these tents, Alaska Dreams, Inc. has significantly more experience in the erection of these tents and will provide additional services such as minor fabric repairs during erection that the other contractor is not able to provide, and Alaska Dreams, Ine.'s proposal also included the required foundation material valued at more than the $1,000 difference in their proposal. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, to award a contract for erection of the 55'X 120' tent to Alaska Dreams, Inc in the amount of $39,850. PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, this fifth day of September, 2012. PAT PORTER, MAYOR by Finance e.oM'� J1 C6tiv 2,L-, etn - 2,oh x New Text Underlined; [DELETED TEXT BRACKETED] SA.LES@ALASKADREAMSINr__r'7M A ,rat a [](i AMS NC, W'WWALASKA€}REAM9SINC.CCit41' ..al:Ut, l'i tlL^,1 h6,rPi�7l feC, �t7L - ..nt`P1S M STIM ' August 20, 2.09.2 Between the Owner: City of Kenai / Rick Koch 210 Fidalgo Avenue Kenai, Alaska 99611 (907) 283 -8222 And the Contractor: Alaska Dreams, Inc. 2081 Van Horn Road #2 Fairbanks, Alaska 99701 (907) 455 -7712 For the Project: City of Kenai - 55x120 Building Erection Marathon Road Kenai, Alaska 99611 Construction Quote (1) 55'x120' Used Cover-All TAS Fabric Structure All Materials FOB Erection Site Kenai, Alaska 2051 VAN HORN ROAD 4 2 FAIRBANKS, ALASKA 99701 P'N:: 907 -455 -772 FAX 907- 455 -77 13 SALES@A.LASKADR EA >AS1NC.CC,M WWW.A:LASKADREAI%1SINC CCM A: Structure: ® 55'W x 1201 (6,600 SF) Cover-All Fabric Structure ® iniine Galvanized Carbon Steel Tubing ® 5' O.C. Truss Spacing ® DuraWeave IIT" Fabric Cover ® (2) HSS /Fabric End Wall Enclosures With Steel End Support Structure, Stiffeners and Hardware as Previously Erected c: Foundation Systems: • NIC — By Others • Complete All-Weather Wood (AWW) 4 "x12" Timber Foundation With Stakes and Attachment Hardware D: Site Preparations: • NIC — By Others • Must Be Level, Compacted Gravel Pad or Equivalent E: insulation Package: • NIC F: Electrical: • NIC G: Mechanical: ® NIC H: Personnel Door: • NIC • Install 4 Existing Framing Packages and Doors as Previously Installed I: Overhead Door: ® NIC • Install 2 Existing Framing Packages and Duratrac Fabric Doors as Previously Installed J: Scope of Work: • Provide Labor and Specialized Tools to Construct One 55' x 120' Used Cover-All TAS Fabric Building • Install 4'x12" AW W Foundation System • Layout and Install Building Base Plates • Assemble and Install all Primary and Secondary Structural Steel • Install all Roof And Wall Fabric Membrane Coverings ® Prepare all Door Openings • Install (2) Personnel Doors • Install (2) Duratrac Fabric Coil -Up Door • Terminate Fabric Membrane K: Terms and Conditions: • This Proposal is Valid for 30 Days From the Above Date, Unless Otherwise Noted • Unless Otherwise Specified in This Proposal, the Price Quoted Includes All Labor, Materials and Equipment as Listed • 50% Due at Time of Order to Proceed • 50% Due at Time of Completion • Any Additions, Alterations, or Deletions to the Above Described Work Will be Added or Deducted From the Below Pricing, and Clearly Defined in Writing and Executed with Approval Signatures • Labor, Including On -Site Delays, Stand -By & Down Time is Charged at a Flat Rate of $88.00 Per Man Hour • Additional Materials Charged at Actual Cost Plus 20% • All Proposals Subject to State, Federal and Local Taxes • All Payments, Charges and Prices Noted are US Funds • A 1 -1/2% Per Month Service Fee Will be Added for Delinquent Payments L: Exclusions: • All Taxes, Fees, Licenses and Permits are Not Included in This Proposal • All Civil Work (Gravel, Excavating, Leveling, Etc.) • All Cost Associated with Construction Equipment • All Building Foundation System or Design • All Mechanical System or Design • All Electrical System or Design • All Flooring Systems or Supports • All Fire Protection Work • All Plumbing or Piping Work • All Costs of Bonds C • All Disposal of Construction Debris From Site • All Onsite Storage Fees or Charges • All Project Specific Required Training • All Material or Work Not Listed NIC PRICING: SUBJECT TO CHANGE PENDING FINAL DESIGN TOTAL BASE PRICE: $39,850.00 This Is Pricing Information Only, Not a Contract for Services. This Estimate is Delivering the Material, or Completing the Job as Described Above. It is Based on Our Evaluation on the Information Available, it Does Not Include Material Price Increases or Additional Labor and Materials Which May be Required Should Unforeseen Problems Arise, or Scope of Work Change, After the Work Has Started, If You Have Any Questions Regarding This Proposal, or If We Can be of Assistance in Any Other Manner, Please Do Not Hesitate to Contact Our Office, Sincerely, Scott Coon j nand, Mansge, ; Alaska Dreams, Inc. ns+ a9e,n�,em� nn�nc�agr. AK 99,07 I 07' 16 an91 F IM 6141 a)sa I www.alaskadreamsinc , com