WHEREAS, the Capital Improvements Plan (CIP) is a guide for capital expenditures;
and,
WHEREAS, the City of Kenai CIP process has involved consideration of existing plans,
programmatic needs and public input; and,
WHEREAS, the CIP compliments the legislative priorities, City Budget and
Comprehensive Plan; and,
WHEREAS, the City of Kenai CIP Priorities for State and Federal Funding for Fiscal
Year 2014 are outlined in Attachment A; and,
WHEREAS, the Kenai City Council held a public hearing on the Capital Improvements
Program adoption on October 17, 2012; and,
WHEREAS, if unforeseen circumstances occur, the City Council authorizes the City
Manager to modify as necessary the City of Kenai's Capital Improvements Plan Priority
Lists for State and Federal Funding Requests for the Fiscal Year 2014, and that any
modification will be brought before Council for approval at the next regularly
scheduled Council meeting.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF KENAI,
ALASKA, adopts the attached City of Kenai Capital Improvements Plan Priority List for
State and Federal Funding Requests for the Fiscal Year 2014.
PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, this 17th day of
October, 2012.
ATTE
(7)
PAT PORTER, MAYOR
Sandra +dig ,City 'erk
■
CITY OF KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR STATE FUNDING REQUESTS FOR
SFY 2014
PRIORITY
NUMBER
PROJECT TITLE
DESCRIPTION
REQUESTED
FUNDING
NOTES /COMMENTS
1
Paving & Improvements to City Streets
The City of Kenai maintains approximately 20 miles of gravel
surfaced roadways within it's municipal boundaries. The cost
of maintenance of gravel roadways is high, dust from gravel
roadways is a health issue for the elderly & young. The City
maintains an ongoing Local Improvement District (LID)
program to pave local streets and roads with the City
providing a 50% cost share for the improvements.
$ 1,000,000.00
Administration recommends that a project of this type be
perpetually included in capital project requests to the State
of Alaska. This ongoing infrastructure improvement project
has improved the safety and operational efficiency of the
City's roadways. The projects have been designed and
constructed by local consultants and contractors providing
further economic benefits to the area.
2
Wastewater Treatment Plant Upgrades-
Phase I
This project is the initial phase of a four -phase project. Phase
I will address improvements to the treatment process to lower
ammonia effluent discharge levels in advance of ammonia
limitations which will be included in the next APDES permit
renewal. Phase I improvements will also include replacement
of aging, failing, equipment and install additional equipment to
providec redundancy in critical operating systems.
$ 1,670,790.00
A grant application for this project has been submitted
under the State of Alaska, Department of Environmental
Conservation (ADEC) Municipal Matching Grant Program
(MMG). We have received the scoring and this project and
not have scored well enough to be included in the
Governor's SFY 2014 capital budget. The City Council
passed Resolution No. 2012 -51 identifying this project as
the number one ADEC MMG priority.
3
Construct a New One - Million Gallon
Water Storage Reservoir
This project would construct a new water storage reservoir to
allow for needed long -term maintenance of the City's lone 3
million gallon water storage reservoir. The existing reservoir's
internal coating system is deteriorating and failing. The
interior coating is the original coating system installed when
the reservoir was constructed and is well past its useful life.
The cathodic protection system has protected underlying
metals to date but as more of the internal coating syems fails
the underlying metals will corrode, threatening the structural
intergrity of the reservoir. Re- coating of the existing reservoir
will remove the reservoir from service for 4 -8 months and
requires an alternative storage reservoir.
$ 2,500,000.00
This is the first phase of a three phase project to construct
improvements to the W WTP and identified in the W WTP
Master Plan prepared by CH2MHill in 2003.
4
Construct New City Light /Heavy
Equipment Maintenance Shop &
Equipment Storage
This project would construct a 20,000 sf maintenance shop to
replace the existing shop. The exsiting shop is a collection of
buildings and conex's that lacks the room to perform
maintenance on the City's equipment fleet, and also lacks
engineered ventilation systems as well as other
improvements found in designed facilities. This project also
includes a new 20,000 s.f. equipment storage building
$ 2,000,000.00
Shop facilities to support operations and maintenance
activities are always difficult projects to move forward. The
present facility was never designed to facilitate the support
manitenance activities which are being accomplished.
There may be an opportunity for Federal participation,
specifically FAA funding in an amount comensurate with
Airport use of the facility. Total project cost estimate is
approximately $6 million, of which the City has $4 million in-
hand.
Attachment A - Resolution 2012 -56
Page 1 of 7
Prepared by: R. Koch
CITY OF KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR STATE FUNDING REQUESTS FOR
SFY 2014
PRIORITY
NUMBER
PROJECT TITLE
DESCRIPTION
REQUESTED
FUNDING
NOTES /COMMENTS
5
Kenai Industrial Park Construction Phase
II
This project would construct
water /sewer/electical /telecommunications /natural gas utilities
to the second phase of the Kenai Industrial Park (up to 20
lots, +/- 25 acres)
$ 500,000.00
This fully develops the Kenai Industrial Park. The
legislature may be seeking economic development projects
this year.
6
Capital Improvements to Support State
Personal Use Fishery
This project would construct three Fish Cleaning/Waste
Transfer & Enforcement/Data Collection Stations. The three
stations would be located at the North Beach, South Beach,
and City Boat Launch.
$ 150,000.00
Last year the State provided a $150000 appropriation in
response to the City's request for $300000. The $150,00
requested in the SFY 2014 budget would provide funding to
support the waste disposal solutions.
Attachment A - Resolution 2012 -56
Page 2 of 7
Prepared by: R. Koch
CITY OF KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR STATE FUNDING REQUESTS FOR
SFY 2014
PRIORITY
PROJECT TITLE
DESCRIPTION
REQUESTED
NOTES /COMMENTS
NUMBER
New Fire Engine
This new fire engine would replace an existing 26 year old fire
engine. Our 1982 fire engine is the oldest equipment
presently in use at the Fire Department, and was one of the
last years in which "open jump seat" fire engines were
allowed by code. The old engine has reached the end of it's
useful life and should be replaced.
FUNDING
OTHER PROJECTS WHICH WERE CONSIDERED
Attachment A - Resolution 2012 -56
Page 3 of 7
Prepared by: R. Koch
Mommsen Subdivision, First Street Re-
Construction
This project would re- construct First Street from California
Avenue to Florida Avenue. This roadway exhibits differential
movement of the curb & gutter and asphalt. Further the
asphalt has and is failing.
$ 360,000.00
Administration believes thins project would hest be funded
from a State /Federal appropriation(s) such as priority #3,
above.
New Fire Engine
This new fire engine would replace an existing 26 year old fire
engine. Our 1982 fire engine is the oldest equipment
presently in use at the Fire Department, and was one of the
last years in which "open jump seat" fire engines were
allowed by code. The old engine has reached the end of it's
useful life and should be replaced.
$ 500,000.00
City of Kenai Indoor Turf Field Facility
This project would construct a 100'x200' indoor turf field,
possibly as an addition to the existing Kenai Multi- Purpose
Facility. The facility would be used by area schools, pre-
schools, soccer and other organizations.
$ 3,500,000.00
This project has been discussed by the parks & Recreation
Commission and it is my understanding they wish to
continue discussion on the subject. This project is certainly
worthy of discussion but significant work needs to be
accomplished to determine its feasibility.
Lower Kenai River Drift Boat Pull -Out
Project would provide lower river access point for pull -out of
drift boats only.
Unknown
ADNR is accomplishing a "Needs Assessment Study"
scheduled to be finished in 2011. It's doubtful any funding
would be available for this project in advance of the
completion of the study, and that State /federal funding
would be appropriated to a State Agency that would be
responsible for the construction and operation of the facility.
Kenai Spur Highway - Upgrade Five
Intersections
This project is proposed to provide safety improvements to
Beaver Loop, Thompson Park, Strawberry Road, Silver
Salmon, and TBD to include turn lanes and lighting. Traffic
accidents at these intersections usually involve at least one
vehicle traveling at a high rate of speed, and are of significant
severity.
$ 3,000,000.00
This project has ranked high on the 2010 -2013 STIP and
funding isproposed in SFY 2011 for conceptual design, and
ROW acquisition.
Attachment A - Resolution 2012 -56
Page 3 of 7
Prepared by: R. Koch
CITY OF KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR STATE FUNDING REQUESTS FOR
SFY 2014
PRIORITY
NUMBER
PROJECT TITLE
DESCRIPTION
REQUESTED
FUNDING
NOTES /COMMENTS
Kenai Spur Highway - Upgrade to Five
Conflicting traffic patterns (through traffic vs
$ 30,000,000.00
This project has not ranked high on the 2010 -2013 STIP. A
Lane configuration Between Soldotna
business /residential traffic) and increased traffic counts have
predocessor project, the improvement of five intersections
and Kenai
increased the number and severity of accidents between
Kenai & Soldotna. Planned commercial developments will
significantly increase traffic in the near future
of this roadway has ranked well on the STIP and funding
for conceptual study & ROW acuisition is proposed to begin
in SFY 2011. The full five -lane project will not be
considered for funding until the intersection project is
through design, or possibly during construction.
New Soccer Fields Irrigation
Project would design and install irrigation system for four
soccer fields
$ 250,000.00
Bridge Access Road, Pedestrian
This project would construct a pedestrian pathway from the
$ 2,000,000.00
I am not aware of any sources of funding that are available
Pathway
Kenai Spur Highway to Kalifornsky Beach Road along Bridge
Access Road. This area is heavily traveled by pedestrians,
sight seer's, bicyclists, etc. This project is approximately 2
miles long and would complete the 24 mile Unity Trail that
connects Kenai and Soldotna, along both the Spur Highway
and Kalifornsky Beach Road.
for this project. and several regulatory acencies (EPA,
USDF &W) have expressed significant opposition to the
project.
Vehicle Storage Facility for Kenai Senior
Center Vehicles
This project would construct a six -bay vehicle storage facility
at the City maintenance yard. At present the vehicles are
stored outside the center. During the winter this results in
vehicles running to maintain heat for trips for the senior
clients, and also results in increased mechanical difficulties.
$ 600,000.00
Attachment A - Resolution 2012 -56
Page 4 of 7
Prepared by: R. Koch
CITY OF KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR FEDERAL FUNDING REQUESTS FOR
FFY 2014
PRIORITY
NUMBER
PROJECT TITLE
DESCRIPTION
REQUIRED
FUNDING
NOTES /COMMENTS
1
Kenai River Bluff Erosion /Stabilization
Approximately one -mile of the bluff along the Kenai River is
exhibiting substantial erosion. Several hundred feet of the
original townsite have been lost over the last century. The
U.S. Corp of Engineers estimates the rate of erosion to be 3
feet per year. Over the next 50 years, in excess of $ 50
million (in 2006 dollars) of property and improvements will be
lost, without the construction of stabilization improvements.
The total cost estimate for the project is $ 20 million.
Approximately $ 1.5 million has been spent to date on
preliminary engineering & studies. Kenai voters approved a $
2 million bond sale at the October 2007 election. Recently the
Kenai Peninsula Borough Assembly passed a resolution to
provide the quarry rock for the project at no cost. The value
of the rock is estimated at $ 4.8 million. Total funding in -hand
and in -kind is approximately $ 10.2 million.
$28,000,000
The bluff erosion project has been the City of Kenai's
number one Federal and State funding priority for at least
the previous thrree years. Administration is requesting
funding from the Governor and area Legislators. To date,
funding of approximately $ 1.5 million has been
appropriated by Alaska's congressional delegation, but the
outlook for additional federal funding is not good. The
citizens of Kenai approved a G.O. bond proposition in the
amount of $ 2,000,000 in 2007. Given the State of Alaska's
present financial condition the opportunity to recieve
funding is as good as it has been in some years.
2
Construct New City Light /Heavy
Equipment Maintenance Shop &
Equipment Storage
This project would construct a 20,000 sf maintenance shop to
replace the existing shop. The exsiting shop is a collection of
buildings and conex's that lacks the room to perform
maintenance on the City's equipment fleet. and also lacks
engineered ventilation systems as well as other
improvements found in designed facilities. This project also
includes a 20,000s.f. equipment storage building.
$ 4,000,000.00
Shop facilities to support operations and maintenance
activities are always difficult projects to move forward. The
present facility was never designed to facilitate the support
manitenance activities which are being accomplished.
There may be an opportunity for Federal participation,
specifically FAA funding in an amount comensurate with
Airport use of the facility. Total project cost estimate is
approximately $8 million, of which the City has $4 million in-
hand.
3
Vehicle Storage Facility for Kenai Senior
Center Vehicles
This project would construct a six -bay vehicle storage facility
at the City maintenance yard. At present the vehicles are
stored outside the center. During the winter this results in
vehicles running to maintain heat for trips for the senior
clients, and also results in increased mechanical difficulties.
$ 600,000.00
Attachment A - Resolution 2012 -56
Page 5 of 7
Prepared by: R. Koch
CITY OF KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR FEDERAL FUNDING REQUESTS FOR
FFY 2014
PRIORITY
NUMBER
4
PROJECT TITLE
City of Kenai Wastewater Treatment
Plant Upgrades & Renovations
DESCRIPTION
This project would construct improvements to the City of
Kenai's WWTP which would increase volume, decrease
operating expenses and increase the quality of the effluent.
The City's Alaska Pollution Discharge Elimination System
APDES
( )permit will be renewed in 2013. We expect
restrictive ammonia limitations to be included i the new
permit. These plant modifications /upgrades are required for
permit compliance.
REQUIRED
FUNDING
$ 1,800,000.00
NOTES /COMMENTS
This is the first phase of a four phase project to construct
improvements to the WWTP ans identified in the WWTP
Master Plan prepared by CH2MHill in 2003.
5
Bridge Access Road, Pedestrian
Pathway
This project would construct a pedestrian pathway from the
Kenai Spur Highway to Kalifornsky Beach Road along Bridge
Access Road. This area is heavily traveled by pedestrians,
sight seer's, bicyclists, etc. This project is approximately 2
miles long and would complete the 24 mile Unity Trail that
connects Kenai and Soldotna, along both the Spur Highway
and Kalifornsky Beach Road.
$ 2,000,000.00
I am not aware of any sources of funding that are available
for this project, and several regulatory agencies (EPA,
USDF &W) have expressed significant opposition to the
project.
Attachment A - Resolution 2012 -56
Page 6 of 7
Prepared by: R. Koch
CITY OF KENAI
CAPITAL IMPROVEMENTS PROGRAM (CIP) PRIORITES
FOR FEDERAL FUNDING REQUESTS FOR
FFY 2014
PRIORITY
PROJECT TITLE
DESCRIPTION
REQUIRED
NOTES /COMMENTS
NUMBER
Lower Kenai River Drift Boat Pull -Out
Project would provide lower river access point for pull -out of
drift boats only.
FUNDING
ADNR is accomplishing a "Needs Assessment Study"
scheduled to be finished in 2011. It's doubtful any funding
would be available for this project in advance of the
completion of the study, and that State /federal funding
would be appropriated to a State Agency that would be
responsible for the construction and operation of the facility.
OTHER PROJECTS WHICH WERE CONSIDERED
Attachment A - Resolution 2012 -56
Page 7 of 7
Prepared by: R. Koch
City of Kenai Indoor Turf Field Facility
This project would construct a 100'x200' indoor turf field,
possibly as an addition to the existing Kenai Multi- Purpose
Facility. The facility would be used by area schools, pre-
schools, soccer and other organizations.
$ 5,000,000.00
This project has been discussed by the parks & Recreation
Commission and it is my understanding they wish to
continue discussion on the subject. This project is certainly
worthy of discussion but significant work needs to be
accomplished to determine its feasibility.
Lower Kenai River Drift Boat Pull -Out
Project would provide lower river access point for pull -out of
drift boats only.
Unknown
ADNR is accomplishing a "Needs Assessment Study"
scheduled to be finished in 2011. It's doubtful any funding
would be available for this project in advance of the
completion of the study, and that State /federal funding
would be appropriated to a State Agency that would be
responsible for the construction and operation of the facility.
Kenai Spur Highway - Upgrade Five
Intersections
This project is proposed to provide safety improvements to
Beaver Loop, Thompson Park, Strawberry Road, Silver
Salmon, and TBD to include turn lanes and lighting. Traffic
accidents at these intersections usually involve at least one
vehicle traveling at a high rate of speed, and are of significant
severity.
$ 3,000,000.00
This project has ranked high on the 2010 -2013 STIP and
funding is proposed in SFY 2011 for conceptual design,
and ROW acquisition.
Kenai Spur Highway - Upgrade to Five
Lane configuration Between Soldotna
and Kenai
Conflicting traffic patterns (through traffic vs
business /residential traffic) and increased traffic counts have
increased the number and severity of accidents between
Kenai & Soldotna. Planned commercial developments will
significantly increase traffic in the near future
$ 30,000,000.00
This project has not ranked high on the 2010 -2013 STIP. A
predocessor project, the improvement of five intersections
of this roadway has ranked well on the STIP and funding
for conceptual study & ROW acuisition is proposed to begin
in SFY 2011. The full five -lane project will not be
considered for funding until the intersection project is
through design, or possibly during construction.
Attachment A - Resolution 2012 -56
Page 7 of 7
Prepared by: R. Koch
KENAI, ALASKA
Nv
"I/faye with a Past, Gi with a Future"
210 Fidalgo Avenue, Kenai, Alaska 99611 -7794
Telephone: 907 - 283 -7535 / FAX: 907 - 283 -3014 1IIIII
1992
MEMO:
TO: City Council
FROM: Rick Koch, City Manager
DATE: October 12, 2012
SUBJECT: Resolution 2012 -56, Adopting Capital Improvement Plan Priority
Lists
The purpose of this correspondence is to recommend Council approval of the above referenced
ordinance. Each year it is necessary for the City to submit its capital requests to the Governor's
Office of Management and Budget (OMB) in advance of the Governor establishing his capital
budget.
I would like to submit our requests to OMB by the end of October. OMB begins assembling and
considering the Governor's capital budget shortly after the first of November. The Governor's
capital budget is generally released in mid - December and it becomes increasingly difficult after
the middle of November to include and /or have considered any requests.
Thank you for your attention in this matter. If you have any questions, please contact me at
your convenience.