Loading...
HomeMy WebLinkAboutResolution No. 2012-64Suggested by: Administration A RESOLUTION OF THE COUNCIL OF THE CITY OF KENAI, ALASKA, EXPRESSING ITS SUPPORT OF AN APPLICTION FOR COMMUNITY DEVELOPMENT GRANT BLOCK GRANT (CDBG) TO CONSTRUCT HEATED SIDEWALKS AND PROVIDE STAND -BY POWER AT THE KENAI SENIOR CENTER. WHEREAS, The mission of the Kenai Senior Center is to serve as a focal point for senior services and where senior citizens come together for fellowship and program participation. Annually, the Kenai Senior Center serves over 40,000 meals to the senior population both at the Senior Center and through its home delivered meals programs.; and, WHEREAS, the staff of the Kenai Senior Center and the Council on Aging, whose mission is to advise the mayor, City Council, and the Senior Center Director, of the needs of elderly in the area, recognize the need for, and fully support a CDBG application for heated sidewalks and a stand -by power generator; and, WHEREAS, the construction of heated sidewalks will eliminate a sometimes hazardous and dangerous winter condition for senior citizens; and, WHEREAS, the construction of a stand -by power generation system will provide for a safe, warm, facility for seniors to receive meals and other program needs during periods of power outages and other critical events; and, NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, that by this resolution its supports an application for a Community Development Block Grant for the purposes of constructing heated sidewalks and a stand -by power generation system for the Kenai Senior Center. PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, this 21st day of November, 2012. PAT PORTER, MAYOR ATTT �lS'�i 5✓ Sand digh" City Clerk M V" TO: Rick Koch, City Manager From: Rachael Craig, Senior Center Director ld Date: November 15, 2012 Reference: CDBG Grant: Grant for Heated Sidewalks and Emergency Generator For the past few years in January, Council on Aging has presented goals to work toward that are important to the well -being of the seniors. Two of their goals have been to have heated sidewalks in front of the ADA parking and driveway under the front canopy and sidewalk to the front door the senior center. At the past COA meeting they approved a resolution to have the Director submit a CDBG Grant in the amount of $71,445.00 for heated sidewalks. During the winter months, during icy and snowy conditions, heated sidewalks would be a benefit to our senior elders. At the same COA meeting, one of the members questioned another goal, an emergency generator. It was decided to move forward, as well, and apply at the same time for an emergency generator. The amount of the generator is $105,875.00. This would allow the senior center to provide a safe, warm facility for the seniors during power outages and other emergency situations. The total of both projects is $177,320.00. CDBG Grant requires a match of 25 %, ($44,330.00). Attached are estimates for both items. 4 u Kenai Senior Center 11/15/2012 Cost Item Desrciption Unit Quantity Unit Cost Sub -Total Mobilization /Demobilization All 1 $ 5,000.00 $ 5,000.00 Concrete Demolition SY 85 $ 30.00 $ 2,550.00 Prepararation of surfaces SY 85 $ 10.00 $ 850.00 Installation of Heat Tubing LF 800 $ 8.00 $ 6,400.00 Concrete SY 85 $ 45.00 $ 3,825.00 Interior Piping LS 1 $ 8,000.00 $ 8,000.00 Water Heater LS 1 $ 5,000.00 $ 5,000.00 Controls /Electrical LS 1 $ 10,000.00 $ 10,000.00 Finishes LS 1 $ 5,000.00 $ 5,000.00 Landscape Repairs All 1 $ 2,500.00 $ 2,500.00 Misc., boring, traffic control, etc. All 1 $ 5,000.00 $ 5,000.00 Sub -Total $ 54,125.00 Design & Inspection (20 %) $ 10,825.00 Contingency (10 %) $ 6,495.00 Total Estimate $ 71,445.00 ESTIMATE COST RSTAND BY POWER GENERATION RELATED M ,, ,. O AT THE KENAI COST ITEM DESCRIPTION 75 KW 208V STANDBY POWER GENERATOR WEATHERPROOF ENCLOSURE IN -FRAME FUEL STORAGE 500 GALLON DOUBLE WALL FUEL STORAGE W /LEAK DETECTION CONCRETE PAD SWITCHGEAR INSTALLATION UNIT QUANTITY UNIT COST SUB -TOTAL EA 1 $ 45,000.00 $ 45,000.00 EA 1 $ 3,500.00 $ 3,500.00 EA 1 $ 3,500.00 $ 3,500.00 EA 1 $ 7,500.00 $ 7,500.00 LS 1 $ 3,000.00 $ 3,000.00 LS 1 $ 10,000.00 $ 10,000.00 LS 1 $ 15,000.00 $ 15,000.00 SUB -TOTAL $ 87,500.00 DESIGN @ 10% $ 8,750.00 CONTINGENCY @ 10% $ 9,625.00 TOTAL $ 105,875.00