HomeMy WebLinkAboutOrdinance No. 2599-2011rti«<ry O/ KENAI, SKA Suggested by: Administration CITY OF KENAI ORDINANCE NO. 2599 -2011 AN ORDINANCE OF THE COUNCIL OF THE CITY OF KENAI, ALASKA, AUTHORIZING A BUDGET TRANSFER WITHIN THE GENERAL FUND AND INCREASING ESTIMATED REVENUES AND APPROPRIATIONS IN THE INFORMATION TECHNOLOGY CAPITAL PROJECT FUND FOR CITYWIDE INFORMATION TECHNOLOGY UPGRADES. WHEREAS, the Administration has identified three information technology (IT) project to streamline the administration and strengthen the security and performance of the City's IT infrastructure; and, WHEREAS, excess funds are available as a result of savings experienced during the City's insurance renewal process of $47,731 and an additional $48,529 in Alaska Public Entity Insurance member dividend credit received towards the City's FY12 insurance ; and, WHEREAS, the integrity, efficiency, and security of the City's IT infrastructure and data is in the best interest of the City and the citizens it serves. NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA that the following budget transfer be made: General Fund Decrease - Non - Departmental: insurance $63 000 Increase - Non Departmental: Transfer to Other Funds $63,000 BE IT FURTHER ORDAINED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA that estimated revenues and appropriations be increased as follows: Information Technology Capital Project Fund Increase Estimated Revenue: Transfer from Other Funds Increase - Appropriations: Machinery & Equipment 63,000 $36,000 Professional Services 5,000 Construction 22,000 $63,000 New Text Uuderlined• [DELETED TEXT BRACKETED Ordinance No. 2599 -2011 Page 2 of 2 PASSED BY THE COUNCIL OF THE CITY OF KENAI, ALASKA, this 160, day of November, 2011. ATTEST: Corene Hall, Deputy City Clerk Approved by Finance: PAT PORTER, MAYOR Introduced: November 2, 2011 Adopted: November 16, 2011 Effective: November 16, 2011 New Text Underlined; [DELETED TEXT BRACKETED] \the KENAI, ALASKA Villa" with a Past, C# with a Future" FINANCE DEPARTMENT 210 Fidalgo Avenue, Kenai, Alaska 99611 -7794 Telephone: 907 - 283 -7535 ext 221 / FAX: 907 - 283 -3014 To: Rick Koch, City Manager From: Dan Castimore, IT Manager Date: October 24, 2011 Re: City Data Center The purpose of this memo is to discuss the City's current Information Technology Infrastructure. Current Situation: The City currently has 12 servers located in 4 separate locations. There are 3 servers on the floor in a back room at the Library. There are 4 servers on the floor in the copy room at City Hall. The public safety building houses 4 servers in the dispatch center which provide the services for the Police Department. Finally, there is a server in a storage closet at the fire department. There are separate Internet connections at each location, each of which uses a different firewall for protection. This requires three different sets of firewall rules, and separate management techniques for each location. The backup power is provided by a number of different UPS systems, city hall has 3 different units, the library has 2 different units, and public safety has 3 different units. Each of these requires battery replacement on a different schedule, and support varying loads that make it difficult to add new equipment. The only location with any type of environmental control is the library, which has a ceiling mounted air conditioner. The other locations store the equipment in a room that is also used for different purposes. Police department servers are housed in the dispatch center, and the noise of the servers makes it impossible to use the third dispatch station. At city hall the servers are in a shared copy room with no access control. Both of the locations have problems with cooling and dust. The public safety building is the only location with both a generator to provide backup power and a location that is staffed 24 hours per day. Backup power and good security make the Public Safety Building the desirable location for the City's data center. DRAFT 2.0 10/26/2011 Proposed Options Option 1 Do nothing. The city will continue to use the current IT Infrastructure. Advantages No cost for room improvements. Disadvantages • Increased risk of premature equipment failure as a result of poor environmental conditions. • Increased risk of data security breach due to inconsistent firewall policy and physical access controls. • Increased future IT spending when implementing new technologies due to limited options for server virtualization. • Increased risk of equipment damage from loss of power. • Increased cost of managing equipment at three different locations. Option 2 Upgrade server rooms at each location to data center standards. This would require the installation of physical access controls and environmental controls at each location. A climate controlled rack would be installed at each location along with a new UPS. !Advantages • No cost for building rewiring. • Faster implementation Disadvantages • High cost of installing duplicate equipment at each location • Limited expansion options. • Increased future IT spending when implementing new technologies due to limited options for server virtualization. • Increased cost of managing equipment at three different locations. • Additional noise from the climate controlled rack. • Increased power consumption and software licensing costs for redundant equipment. Option 3 Create a data center at the public safety building and relocate all server equipment and internet connections to this location. Install an air conditioner, large UPS, and a physical access control system. Install racks for the servers, network gear, SCADA equipment, and public safety radio equipment. This project could be split into three phases. The first would include the construction, UPS, electrical work, and purchase of racks. The second would include the installation of an air conditioner. The third phase would be to rewire the public safety building networks to terminate in the new data center. DRAFT 2.0 10/26/2011 SCADA equipment would be moved to this location as part of a future SCADA telemetry upgrade. The public safety radio equipment would be moved to this location as part of a future project to replace the existing radio equipment. Advantages • Ease of management due to only having one location. • Backup generator already installed. • Physical security is improved by 24 hour staffing, and location in close proximity to the city police department. • Reduction of noise. • Room for long term expansion. Disadvantages • Loss of space currently in use by other departments at the public safety building • Cost of rewiring public safety building's data network to new data center. 'Recommendation Option 3 will best meet the long term goals of the administration including virtualization and improving data security. This option will also help prepare us for VOIP and provide a climate controlled environment to house the public safety radios and SCADA equipment in the future. DRAFT 2.0 10/26/2011 City of Kenai Proposed IT Infrastructure Updates - Prepaired by: Dan Castimore, IT Manager 3 SURTD5000XLT 9 SURT192XLBP 3 AP7862 2 CCN8000T Total Option 2 APC Smart -UPS RT 5000VA 208V $ 3,525.00 $ 10,575.00 APC Smart -UPS RT 192V Battery Pack $ 979.00 $ 8,811.00 APC Rack PDU Metered Zero U 5.7kW 100V $ 434.47 $ 1,303.41 ClimateCab NEMA 12 Server Cabinet with M6 Rails and 8000 btu air conditioner $ 4,509.00 $ 9,018.00 $ 29,707.41 Option 3, Phase 1 1 SUVTP2OKF4B4S Smart -UPS VT 20kVA 208V w/4 Batt. Mod $ 13,100.00 $ 4 AP7862 APC Rack PDU Metered Zero U 5.7kW 100V $ 434.47 $ APC NetShelter SX Rack Enclosure with Roof and 2 AR3300 Sides - 42U $ 1,600.00 $ 3,200.00 2 2U Wiring Rack $ 1,500.00 $ 3,000.00 13,100.00 1,737.88 Total Cable Ladder (Cable Management) $ 3,855.00 $ 3,855.00 Construction materials and labor $ 13,000.00 $ 13,000.00 Cable Management for racks $ 2,425.00 $ 2,425.00 Total Total Option 3, Phase 2 Liebert Challenger 3000 17.5kw Air Conditioner with installation. Option 3, Phase 3 Rewire public safety building network wiring. Parts & Labor. Option 3 Total Costs $ 40,317.88 50,000.00 $ 50,000.00 "! 50,000.00 $ 25,000.00 $ 25,000.00 25,000.00 Phase 1 Phase 2 Phase 3 Total $50,000.00 $25,000.00 $115,317.88 Future Expansion -n Future Expansion UPS Gear Server Gear Wiring Rack Spare Wiring Rack Ntlie ci9/ 0/ KENAI, ALASKA "kllfage with a Past, Ci y with a Future" FINANCE DEPARTMENT 210 FideIgo Avenue, Kenai, Alaska 99611 -7794 Telephone: 907- 283 -7535 ext 221 / FAX: 907 - 283 -3014 To: Rick Koch, City Manager From: Dan Castimore, IT Manager Date: October 26, 2011 Re: City Telephone Systems The purpose of this memo is to discuss the City's current telephone systems. Current Situation: The City currently has Nortel phone systems at the City Hall, Library, Public Safety building, Fire Station 2, Airport, Senior Center, and City Shop. Each of these systems has dedicated trunk lines, and are not connected together. We have an assortment of systems, from the Nortel Norstar ICS, to the CICS, and the MICS. These systems all use the same telephones, but no other parts are interchangeable. Nortel is no longer in business, the products have been discontinued, and support is now offered by Avaya. The phone systems are no longer serviceable or upgradeable; parts are only available from third party companies. The PBX at City Hall has been having problems, requiring it to be restarted every few weeks. This is an indication that the system is failing, and that any day it may stop functioning. A voice over IP (VOIP) telephone system is the current replacement technology for a telephone PBX. VOIP combines telephones and computer networks into one system. This simplifies cable management as there is no longer a need for legacy telephone wiring and equipment. A number of vendors produce VOIP systems including Cisco, Mitel, Avaya, and others. As the Borough, School District, Hospital, and College all use Cisco systems, that is what will be discussed in this memo. Proposed Opti.o Option 1 Purchased refurbished Nortel equipment in the event of a PBX failure. The new equipment will need to be reprogrammed by ACS before it will work. Advantages There are no immediate costs unless a PBX fails. DRAFT 3.0 10/26/2011 aisad evuntages If any of these systems fails, the cost to the city in both time, and lost productivity will be very high. Any costs associated with repairs will be lost when the city eventually moves to a new telephone platform. Option 2 Purchase and install a new VOIP system in the event of a PBX failure. A contractor will be hired to implement the new system on an emergency basis. !tdvan2rages There are no immediate costs unless a PBX fails and any costs associated will not be lost in the future. Disadvantages The amount of time to get a new VOIP system in place will be measured in weeks, not days. Hiring a consultant to do an emergency replacement will be very costly. The risk of purchasing items we do not need, or not purchasing items we do need, is higher due to the constrained timeline. Option 3 Purchase and install a new VOIP system before a PBC fails. This would be a multiphase project. Phase 1 would be to create a plan to migrate to VOIP. Do as much development work as possible, and hire a consultant to help draft a proposed equipment list. Phase 2 would be to install a VOIP system for City Hall. Phase 3 would be to install VOIP for the Public Safety Building and Library. Phase 4 would be to install VOIP at other remote locations. Advantages Any work that is done will be reusable in the future. The timeline will be flexible and allow the best rates for a consultant. If a PBX fails, we can implement VOIP much faster, and at a lower cost. Disadvantages This is the most costly option. eci mmendation. Option 3 is recommended because it reduces the City's risk in the event of a PBX failure and provides a phased approach to phone system replacement citywide. Phase 1 to be funded from FY12 budget, with other phases proposed in future fiscal years to be determined after technical analysis phase. DRAFT 3.0 10/26/2011 City of Kenai Proposed Phone System Updates - Prepaired by: Dan Castimore, IT Manager 1 MCS782815 -K9 -WL8 17 CP- 8945 -K9= 7 CP- 9971 -C- CAM -K9= 7 CP- CKEM -C= 2 C3KX- PWR- 715WAC= 2 WS- C3560X -24P -L 2 C3KX- NM -1G= 2 GLC- SX -MM= 1 CP -7937G 4 ATA187 -11 -A= 1 1 Option 2 (Replace City Hall PBX) Cisco Unified Communications Manager Biz Edition 5000 $ 11,046.75 $ 11,046.75 Cisco Unified Phone 8945, Phantom Grey, Standard Handset $ 341.25 $ 5,801.25 Cisco UC Phone 9971, Charcoal, Std Hndst with Camera $ 646.75 $ 4,527.25 Cisco Unified IP Color Key Expansion Module, Charcoal $ 321.75 $ 2,252.25 Catalyst 3K -X 715W AC Power Supply $ 650.00 $ 1,300.00 Catalyst 3560X 24 Port PoE LAN Base $ 2,730.00 $ 5,460.00 Catalyst 3K -X 1G Network Module $ 325.00 $ 650.00 GE SFP, LC connector SX transceiver $ 325.00 $ 650.00 Cisco UC Conference Station 7937 Global $ 841.75 $ 841.75 Cisco ATA 187 with configurable impedance $ 195.00 $ 780.00 ACS Installation and Engineering $ 2,500.00 $ 2,500.00 Consultant hired to manage entire project $ 15,000.00 $ 15,000.00 Total $ 50,809.25 Total 1 MCS782815 -K9 -WL8 17 CP- 8945 -K9= 7 CP- 9971 -C- CAM -K9= 7 CP- CKEM -C= 2 C3KX- PWR- 715WAC= 2 WS- C3560X -24P -L 2 C3KX- NM -1G= 2 GLC- SX -MM= 1 CP -7937G 4 ATA187 -11 -A= 1 Total Option 3 Phase 1. Consultant to help with technical issues on Option 3 Phase 2 Cisco Unified Communications Manager Biz Edition 5000 Cisco Unified Phone 8945, Phantom Grey, Standard Handset Cisco UC Phone 9971, Charcoal, Std Hndst with Camera Cisco Unified IP Color Key Expansion Module, Charcoal Catalyst 3K -X 715W AC Power Supply Catalyst 3560X 24 Port PoE LAN Base Catalyst 3K -X 1G Network Module GE SFP, LC connector SX transceiver Cisco UC Conference Station 7937 Global Cisco ATA 187 with configurable impedance ACS Installation and Engineering__ 5,000.00 $ 5,000.00 $ 5,000.00 $ 11,046.75 $ 11,046.75 $ 341.25 $ 5,801.25 646.75 $ 4,527.25 321.75 $ 2,252.25 650.00 $ 1,300.00 2,730.00 $ 5,460.00 325.00 $ 650.00 325.00 $ 650.00 841.75 $ 841.75 195.00 $ 780.00 2,500.00 $ 2,500.00 $ 35,809.25 45 CP- 8945 -K9= 1 C3KX- PWR- 715WAC= 1 WS- C3560X -24P -L 1 C3KX- NM -1G= 1 GLC- SX -MM= 3 ATA187 -11 -A= Option 3 Phase 3 Cisco Unified Phone 8945, Phantom Grey, Standard Handset Catalyst 3K -X 715W AC Power Supply Catalyst 3560X 24 Port PoE LAN Base Catalyst 3K -X 1G Network Module GE SFP, LC connector SX transceiver Cisco ATA 187 with configurable impedance $ 341.25 $ 15,356.25 $ 650.00 $ 650.00 $ 2,730.00 $ 2,730.00 $ 325.00 $ 325.00 $ 325.00 $ 325.00 $ 195.00 $ 585.00 _.:..— -- _ _ _._ _ _ .__ — .------------ - - -___ �_ ��. —.—m =— — � m —� - ...__.__.._ate Total $ 19,971.25 32 CP- 8945 -K9= 1 C3KX- PWR- 715WAC= 1 WS- C3560X -24P -L 6 3560CG -8PC -S 7 ATA187 11 -A= Option Phase 4 Cisco Unified Phone 8945, Phantom Grey, Standard Handset Catalyst 3K -X 715W AC Power Supply Catalyst 3560X 24 Port PoE LAN Base Catalyst 3560CG 8port POE switch Cisco ATA 187 with configurable impedance $ 341.25 $ 10,920.00 $ 650.00 $ 650.00 $ 2,730.00 $ 2,730.00 $ 1,166.75 $ 7,000.50 $ 195.00 $ 1,365.00 Total $ 22,665.50 Option 3 Total Costs Phase 1 Phase 2 Phase 3 Phase 4 Total $5,000.00 $35,809.25 $19,971.25 $22,665.50 $83,446.00 KENAI, ALASKA "Village with a Past, C# with a Future FINANCE DEPARTMENT 210 Fidalgo Avenue, Kenai, Alaska 99611 -7794 Telephone: 907- 283 -7535 ext 221 / FAX: 907 - 283 -3014 To: Rick Koch, City Manager From: Dan Castimore, IT Manager Date: October 24, 2011 Re: Data backup system The purpose of this memo is to discuss the City's current data backup system, propose several possible changes and make a recommendation for implementation. Garret Situation: Data backup is currently handled in a fragmented manor. There are a variety of backup methods at City Hall, the Library, and at the Public Safety building. The City currently has approximately 2,780 gigabytes of data (2.78Tb). Not all of this data is backed up due to limited storage capacities. The data that is backed up does not follow a uniform schedule; some items are backed up daily, while others are backed up weekly, or semi - weekly. Retention is also not uniform; some data is stored for a week, while other data is stored for 3u days or longer. The City uses software from Symantec called Backup Exec. This software is currently out of date and needs to be updated. With annual maintenance fees this software will not need to be upgraded again. As any new option will back up all city data, including the Police Department, it will need to be housed in the public safety building for security reasons. The Public Safety building is also the only building to have a generator, and is staffed 24 hours a day. Proposed Options Option z Do nothing. The city will continue to use the current backup system. Advantages The cost of making any changes will be significant. If nothing is done, no software or hardware other than replacement media would be required. Data Backup Memo 10/24/2011 Oisadvuatacges Sufficient backup space is not available to support current levels of data. The city will have to backup less information, or backup less frequently without additional storage. Not all data is backed up, and data that is backed up isn't always done so on a daily basis. Because backups are done in three locations, managing the tapes is a complex process. Restoring data is a time consuming process as tapes must be located and loaded before any backup can begin. Because data is stored at the same location as the original systems, catastrophic failures would result in massive data loss. Optuaan 2 Purchase a server with a moderate amount of onboard storage. Purchase upgraded licenses for our backup software and consolidates to one backup server. Backup City data to an offsite provider (Backup to the Cloud). Advantages The vendor will be responsible for maintaining the storage hardware, and making sure that the backups are available. Catastrophic failures would not result in any data loss. Growth of data size is not an issue as we pay only for what we use. Disadvearatages The bandwidth required to upload all of the data generated each month would require the city to purchase a larger internet connection. The monthly cost to store data is very high. Because data is located off site any recovery efforts will take much longer. A full recovery could take days, or weeks. Option 3 Purchase a server with limited onboard storage. Purchase upgraded licenses for our backup software and consolidates to one backup server. Use a network attached storage (NAS) device for storage. Advantages The storage system is easily upgradeable to accommodate any future growth. Disadvantages NAS has a limited transfer speed and uses a proprietary interface. While this would provide protection to the City Hall or Library in the event of a catastrophic failure, the public safety building would still be a single point of failure. This could be rectified by purchasing a second NAS and housing it at another location. Option 4 Purchase a server with limited onboard storage. Purchase upgraded licenses for our backup software and consolidates to one backup server. Use a storage area network (SAN) for storage. Advantages This option provides excellent performance and expansion capabilities. Data Backup Memo 10/24/2011 Disadvantages This is the most expensive option. While this would provide protection to the City Hall or Library in the event of a catastrophic failure, the public safety building would still be a single point of failure. This could be rectified by purchasing a second SAN and housing it at another location. Option 5 Purchase a server with the maximum available onboard storage. Purchase upgraded licenses for our backup software and consolidates to one backup server. Advantages This option is the most economical, and provides the best performance. It is also the simplest to implement. Disadvantages Expansion would be more difficult than with other solutions. While this would provide protection to the City Hall or Library in the event of a catastrophic failure, the public safety building would still be a single point of failure. This could be rectified by purchasing a second server and housing it at another location. Recommendation Option 5 is the most economical solution and would meet the administration's goals. This will also be the easiest to implement. Data Backup Memo 10/24/2011 City of Kenai Proposed Backup Solutions - Prepaired by: Dan Castimore, IT Manager 1 Symantec Backup Exec 2010 for Windows Server - Essential Support $ 139.50 $ 139.50 1 Symantec Backup Exec 2010 Agent for Microsoft Exchange Server - Essential S $ 139.50 $ 139.50 1 Symantec Backup Exec 2010 Agent for Microsoft SQL Server - Essential Suppor $ 139.50 $ 139.50 6 Symantec Backup Exec 2010 Agent for Windows Systems - Essential Support $ 83.70 $ 502.20 Total $ 920.70 1 Symantec Backup Exec 2010 for Windows Server - version upgrade license $ 534.12 S 534.12 1 Symantec Backup Exec 2010 Agent for Microsoft Exchange Server - version upg $ 534.12 $ 534.12 1 Symantec Backup Exec 2010 Agent for Microsoft SQL Server - version upgrade $ 534.12 $ 534.12 6 Symantec Backup Exec 2010 Agent for Windows Systems - version upgrade licen $ 318.87 S 1.913.22 Dell PowerEdge R410, Dual Xeon E5620 CPU, 12gb RAM, 4x 300Gb HD, Reduntant Power Supply, Windows Server 2008R2 Standard, iDRAC6 Enterprise, ReadyRails 1 with Cable Management Arm, Syr Basic Hardware Warranty $ 5,387.04 $ 5,387.04 1 Amazon Simple Storage Service charges for 5Tb of storage for 1 year $ 8,400.00 $ 8,400.00 Total $ 17,302.62 Annual Reoccuring Costs: $ 9,320.70 5 Year Total Cost: $ 54,585.42 Q, tion 3 Costs 1 Symantec Backup Exec 2010 for Windows Server - version upgrade license 1 Symantec Backup Exec 2013 Agent tor Microsot Exchange Server - version upg 1 Symantec Backup Exec 2010 Agent for Microsoft SQL Server - version upgrade 6 Symantec Backup Exec 2010 Agent for Windows Systems - version upgrade licen Dell PowerEdge R410, Dual Xeon E5620 CPU, 12gb RAM, 2x 146Gb HD, Reduntant Power Supply, Windows Server 2008R2 Standard, iDRAC6 Enterprise, ReadyRails 1 with Cable Management Arm, Syr Basic Hardware Warranty 1 Netgear ReadyNAS 4200 $ 534.12 $ 534.12 34.11 S 534.12 534.12 $ 534.12 318.87 S 1,913.22 $ 4,516.62 $ 4,516.62 $ 13,175.00 $ 13,175.00 Total $ 21,207.20 Annual Reoccuring Costs: $ 920.70 5 Year Total Cost: $ 24,890.00 1 Symantec Backup Exec 2010 for Windows Server - version upgrade license $ 534.12 $ 534.12 1 Symantec Backup Exec 2010 Agent for Microsoft Exchange Server - version upg $ 534.12 $ 534.12 1 Symantec Backup Exec 2010 Agent for Microsoft SQL Server - version upgrade $ 534.12 $ 534.12 6 Symantec Backup Exec 2010 Agent for Windows Systems - version upgrade licen $ 318.87 $ 1,913.22 Dell PowerEdge R410, Dual Xeon E5620 CPU, 12gb RAM, 2x 146Gb HD, Reduntant Power Supply, Windows Server 2008R2 Standard, iDRAC6 Enterprise, ReadyRails with Cable Management Arm, Syr Basic Hardware Warranty 1 $ 4,516.62 $ 4,516.62 1 Equallogic iSCSI Storage Area Network 32Tb $ 32,000.00 $ 32,000.00 Total $ 40,032.20 Annual Reoccuring Costs: $ 920.70 5 Year Total Cost: $ 43,715.00 C 1 Symantec Backup Exec 2010 for Windows Server - version upgrade license $ 534.12 $ 534.12 1 Symantec Backup Exec 2010 Agent for Microsoft Exchange Server - version upg $ 534.12 $ 534.12 1 Symantec Backup Exec 2010 Agent for Microsoft SQL Server - version upgrade $ 534.12 $ 534.12 6 Symantec Backup Exec 2010 Agent for Windows Systems - version upgrade licen $ 318.87 $ 1,913.22 Dell PowerEdge RS10, Dual Xeon E5620 CPU, 12gb RAM, 2x 149Gb HD, 12x 3Tb HD, Reduntant Power Supply, Windows Server 2008R2 Standard, iDRAC6 1 Enterprise, ReadyRails with Cable Management Arm, Syr Basic Hardware Warranty $ 14,000.00 $ 14,000.00 Total $ 17,515.58 Annual Reoccuring Costs: $ 920.70 5 Year Total Cost: $ 21,198.38